Planning application
123 Pall Mall London SW1Y 5EA
Works: Extension Loft or dormer
Relates to 26/04669/FULL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Partial infill of existing internal lightwell at mezzanine to fifth floors and associated works, including installation of new floors and internal façade, alterations to lightwell elevations including removal and modification of existing openings, replacement of existing rooflight, and enclosure of external escape route. (Linked to 26/04669/FULL)
As published by the council, reference 26/04670/LBC
Application record
- Reference
- 26/04670/LBC
- Category
- Heritage and listed buildings
- Status
- Pending
- Received
- 13 Jul 2026
- Validated
- 17 Jul 2026
- Postcode
- SW1Y 5EA
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2026.
-
26/05072/LBC Decided
123 Pall Mall London SW1Y 5EA
Internal refurbishment works and minor external alterations, including replacement and reconfiguration of modern internal finishes, partitions and fittings; refurbishment of reception, office, WC, end-of-trip and basement areas; accessibility and fire safety improvements; removal of selected suspended ceilings; replacement of entrance screens and doors; and minor alterations to the Pall Mall shopfronts.
-
26/04669/FULL Awaiting decision
123 Pall Mall London SW1Y 5EA
Partial infill of existing internal lightwell at mezzanine to fifth floors, including installation of new floors and internal façade, alterations to lightwell elevations including removal and modification of existing openings, replacement of existing rooflight, and enclosure of external escape route. (Linked to 26/04670/LBC)
Timeline
Dates from the published record
-
13 Jul 2026
Received by Westminster
-
17 Jul 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
26/04669/FULL Awaiting decision
123 Pall Mall London SW1Y 5EA
Partial infill of existing internal lightwell at mezzanine to fifth floors, including installation of new floors and internal façade, alterations to lightwell elevations including removal and modification of existing openings, replacement of existing rooflight, and enclosure of external escape route. (Linked to 26/04670/LBC)
1 later application on the register refers to this one:
-
26/04669/FULL Awaiting decision
123 Pall Mall London SW1Y 5EA
Partial infill of existing internal lightwell at mezzanine to fifth floors, including installation of new floors and internal façade, alterations to lightwell elevations including removal and modification of existing openings, replacement of existing rooflight, and enclosure of external escape route. (Linked to 26/04670/LBC)
What happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
123 Pall Mall London SW1Y 5EA
90% historically approved · decision due ~22 Sep
Internal refurbishment works and minor external alterations, including replacement and reconfiguration of modern internal finishes, partitions and fittings; refurbishment of reception, office, WC, end-of-trip and basement areas; accessibility and fire safety improvements; removal of selected suspended ceilings; replacement of entrance screens and doors; and minor alterations to the Pall Mall shopfronts.
Decided Heritage and listed buildings -
123 Pall Mall London SW1Y 5EA
88% historically approved · decision due ~11 Sep
Partial infill of existing internal lightwell at mezzanine to fifth floors, including installation of new floors and internal façade, alterations to lightwell elevations including removal and modification of existing openings, replacement of existing rooflight, and enclosure of external escape route. (Linked to 26/04670/LBC)
Awaiting decision Full applications Extension Loft or dormer -
14 - 16 Cockspur Street London SW1Y 5BL
Installation of CCTV cameras to front and rear ground floor elevations; new intercom and access control panel to front entrance; alteration to existing rainwater pipe on rear elevation.
Granted Heritage and listed buildings 33 docs -
14 - 16 Cockspur Street London SW1Y 5BL
Installation of CCTV cameras to front and rear ground floor elevations; new intercom and access control panel to front entrance; alteration to existing rainwater pipe on rear elevation.
Granted Full applications 24 docs -
14 - 16 Cockspur Street London SW1Y 5BL
Display of one non-illuminated printed vinyl scaffold shroud measuring 25m x 23.5m and three non-illuminated inset advertisements each measuring 5.5m x 5.5m, for a one year period from 1 October 2025 to 1 October 2026.
Refused Advertising 9 docs -
14 - 16 Cockspur Street London SW1Y 5BL
Installation of dry riser acess cover set into the ground in front of the Cockspur Street entrance to the building.
Granted Full applications 22 docs
Other heritage and listed building applications
In Westminster
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)
-
26/07461/LBC Awaiting decision
1 Savile Row London W1S 3JR
Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.