Planning application
26/04669/FULL
Basement 123 Pall Mall London SW1Y 5EA
Proposal
Partial infill of existing internal lightwell, including installation of new floor and internal façade, alterations to lightwell elevations including removal and modification of existing openings, replacement of existing rooflight, and enclosure of external escape route. (Linked to 26/04670/LBC)
As published by the council, reference 26/04669/FULL
Timeline
Dates from the published record
-
13 Jul 2026
Received by Westminster
-
17 Jul 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04670/LBC Awaiting decision
Basement 123 Pall Mall London SW1Y 5EA
Partial infill of existing internal lightwell at mezzanine to fifth floors and associated works, including installation of new floors and internal façade, alterations to lightwell elevations including removal and modification of existing openings, replacement of existing rooflight, and enclosure of external escape route. (Linked to 26/04669/FULL)
-
25/06062/ADV Refused
14 - 16 Cockspur Street London SW1Y 5BL
Display of one non-illuminated printed vinyl scaffold shroud measuring 25m x 23.5m and three non-illuminated inset advertisements each measuring 5.5m x 5.5m, for a one year period from 1 October 2025 to 1 October 2026.
-
25/09094/LBC Granted
14 - 16 Cockspur Street London SW1Y 5BL
Internal alterations to timber panelling within the Servery and installation of CCTV additions to the Sala Brazil.
-
26/03099/LBC Awaiting decision
14 - 16 Cockspur Street London SW1Y 5BL
Installation of a new dry riser set into floor in front of the building. (Linked to 25/08513/FULL)
-
26/01960/ADFULL Awaiting decision
14 - 16 Cockspur Street London SW1Y 5BL
Details of waste and recycling storage pursuant to Condition 3 of the planning permission dated 01 September 2025 (25/04681/FULL).
-
25/06500/ADLBC Granted
14 - 16 Cockspur Street London SW1Y 5BL
Detailed drawings of the new rooftop stair enclosure and new door on the Cockspur Street elevation pursuant to Condition 3 (a and b) of listed building consent dated 04 June 2025 (25/00356/LBC).
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.