Skip to content
PlanIndex Get alerts
Menu

Planning application

14 - 16 Cockspur Street London SW1Y 5BL

Granted Westminster 25/08513/FULL Full Planning Permission Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of dry riser acess cover set into the ground in front of the Cockspur Street entrance to the building.

As published by the council, reference 25/08513/FULL

Application record

Reference
25/08513/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Application Permitted
Received
20 Nov 2025
Validated
16 Jun 2026
Decided
6 Aug 2026
Ward
St James's
Decision by
Delegated Decision
Postcode
SW1Y 5BL

Timeline

Dates from the published record

  1. 20 Nov 2025

    Received by Westminster

  2. 16 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2026

    Decision issued: Application Permitted

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 14 - 16 Cockspur Street London SW1Y 5BL

    25/09094/LBC Submitted 16 Dec 2025 0m away

    Internal alterations to timber panelling within the Servery and installation of CCTV additions to the Sala Brazil.

    Granted Heritage and listed buildings 28 docs
  • 14 - 16 Cockspur Street London SW1Y 5BL

    26/03099/LBC Submitted 5 May 2026 0m away

    90% historically approved · decision due ~11 Aug

    Installation of a new dry riser set into floor in front of the building. (Linked to 25/08513/FULL)

    Awaiting decision Heritage and listed buildings 10 docs
  • 14 - 16 Cockspur Street London SW1Y 5BL

    26/01960/ADFULL Submitted 25 Mar 2026 1m away

    87% historically approved · decision due ~9 Jun

    Details of waste and recycling storage pursuant to Condition 3 of the planning permission dated 01 September 2025 (25/04681/FULL).

    Awaiting decision Full applications 9 docs
  • 14 - 16 Cockspur Street London SW1Y 5BL

    25/06500/ADLBC Submitted 8 Sep 2025 2m away

    Detailed drawings of the new rooftop stair enclosure and new door on the Cockspur Street elevation pursuant to Condition 3 (a and b) of listed building consent dated 04 June 2025 (25/00356/LBC).

    Granted Conditions 7 docs
  • 14 - 16 Cockspur Street London SW1Y 5BL

    25/08515/LBC Submitted 20 Nov 2025 4m away

    Installation of CCTV cameras to front and rear ground floor elevations; new intercom and access control panel to front entrance; alteration to existing rainwater pipe on rear elevation.

    Granted Heritage and listed buildings 33 docs
  • 14 - 16 Cockspur Street London SW1Y 5BL

    25/08514/FULL Submitted 20 Nov 2025 4m away

    Installation of CCTV cameras to front and rear ground floor elevations; new intercom and access control panel to front entrance; alteration to existing rainwater pipe on rear elevation.

    Granted Full applications 24 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications