Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

Awaiting decision Westminster 26/04481/ADFULL Approval of Details (Full PP)

Works: Windows or glazing

Relates to 25/08163/FULL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details of steel transfer structures over the taxi ramp, typical detail of the curtain walling, new lift access from the canal towpath to Bishop's Bridge Road, parked BMU unit and track at roof level, and external plant area at roof level and the louvre screens pursuant to condition 6 of planning permission dated 29.04.2026 (RN: 25/08163/FULL).

As published by the council, reference 26/04481/ADFULL

Application record

Reference
26/04481/ADFULL
Type
Approval of Details (Full PP)
Status
Pending
Received
6 Jul 2026
Validated
6 Jul 2026
Ward
Hyde Park
Postcode
W2 6BA

Site history

Applications at this address on the Westminster register

This site has had 9 applications since 2025: 2 approved, 0 refused.

  • 26/05328/ADFULL Decided

    Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

    Details of facing materials pursuant to condition 2 of planning permission dated 23 Feburary 2026 (RN: 25/08163/FULL)

    Submitted 6 Aug 2026
  • 26/04482/ADFULL Awaiting decision

    Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

    Details of landscaping scheme and public art pursuant to conditions 16 and 17 (partial) of planning permission dated 29.04.2026 (RN: 25/08163/FULL),

    Submitted 6 Jul 2026 Full applications
  • 26/04369/ADFULL Awaiting decision

    Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

    Details of lighting pursuant to condition 19 of planning permission dated 29 April 2026 (RN: 25/08163/FULL).

    Submitted 1 Jul 2026
  • 26/03480/ADFULL Awaiting decision

    Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

    Details of a construction management plan and details of a Risk Assessment and Method Statement pursuant to condition 5 (part B only) and 15 (part B only) of planning permission dated 29th April 2026 (RN:25/08163/FULL)

    Submitted 27 May 2026 Full applications
  • 26/03005/ADFULL Awaiting decision

    Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

    Detailed independent review of the environmental sustainability features (environmentally friendly features) of the development prior to occupation of the building pursuant to condition 3 of planning permission dated 29th April 2026 (RN:25/08163).

    Submitted 7 May 2026 Full applications
  • 26/02586/ADV Granted

    Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

    Display of externally illuminated hoarding in two sections measuring 2.4m x 23.99m and 2.4m x 45.03m for a temporary period covering 30 April 2026 to 1 May 2031.

    Decided 29 Apr 2026 Advertising
  • 25/08163/FULL Awaiting decision

    Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

    Variation of condition 1 of planning permission dated 2nd April 2015 (RN:12/07668/FULL) for the Development of an office building comprising canal-side reception with 21 storeys of offices and either Class A1/A2/A3 use at canal-side and first floor level, alongside pedestrian linkages to Paddington Station and Bishop's Bridge Road, in conjunction with landscaping and other associated works. Namely, the integration of the ground/canal level retail unit and the office reception, with associated alteration to building entrances; the replacement of the full-height eastern terrace screen with a half height balustrade; and rearrangement / location of the photovoltaic panels at roof level.

    Submitted 7 Nov 2025 Full applications
  • 25/05693/NMA Granted

    Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

    Amendments to planning permission dated 2nd April 2015 (RN:12/07668/FULL) for Development of an office building comprising canal-side reception with 21 storeys of offices and either Class A1/A2/A3 use at canal-side and first floor level, alongside pedestrian linkages to Paddington Station and Bishop's Bridge Road, in conjunction with landscaping and other associated works. Namely, rationalisation of the southern structural transfer expression; rationalisation of the canal side structural transfer expression to match the structural grid; reconfiguration of the east and central core, including: addition of a dedicated fire-fighting lift, addition of a combined passenger/evacuation lift and a passenger/goods lift that now serve the basement levels, and enlargement and relocation of the accessible WC from the eastern to the central core; external alterations to the western lift shaft façade, reducing the extent of glazing; the material treatment of the stair and lift cores changed from aluminium cladding to concrete; 500mm extension of the north office façade; replacement of the brise soleil (fins) with deeply expressed mullion system; external terraces reconfigured; Internal layout reconfiguration; and adjustment of the Building Maintenance Unit (BMU) layout at roof level.

    Decided 30 Sep 2025 Amendments

Timeline

Dates from the published record

  1. 6 Jul 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 31 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 65 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 25/08163/FULL Awaiting decision

    Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA

    Variation of condition 1 of planning permission dated 2nd April 2015 (RN:12/07668/FULL) for the Development of an office building comprising canal-side reception with 21 storeys of offices and either Class A1/A2/A3 use at canal-side and first floor level, alongside pedestrian linkages to Paddington Station and Bishop's Bridge Road, in conjunction with landscaping and other associated works. Namely, the integration of the ground/canal level retail unit and the office reception, with associated alteration to building entrances; the replacement of the full-height eastern terrace screen with a half height balustrade; and rearrangement / location of the photovoltaic panels at roof level.

    Submitted 7 Nov 2025 Full applications

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,250 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 89 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront.

    15 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising repolacement window and installation of double opening door.

    15 Sep 2026 Full applications
  • 26/06234/FULL Awaiting decision

    40 Grosvenor Place London SW1X 7HJ

    Use of lower ground floor of Unit 3 and ground floor of Unit 2 as gym (Class E(d)) and/ or office (Class E(g))

    11 Sep 2026 Full applications
  • 26/06249/FULL Awaiting decision

    53 Wimpole Street London W1G 8YH

    Removal and Installation of external rear air condensers and associated pipe work to ground floor, including internal works to ground and first floor. (Linked with 26/06250/LBC)

    11 Sep 2026 Full applications
  • 26/03576/FULL Decided

    15A Devonshire Terrace London W2 3DW

    Erection of an infill extension to basement courtyard to form new bedroom and internal alterations. (Linked with 26/03577/LBC)

    1 Jun 2026 Full applications