Planning application
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Relates to 25/08163/FULL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of facing materials pursuant to condition 2 of planning permission dated 23 Feburary 2026 (RN: 25/08163/FULL)
As published by the council, reference 26/05328/ADFULL
Application record
- Reference
- 26/05328/ADFULL
- Status
- Pending
- Received
- 6 Aug 2026
- Validated
- 6 Aug 2026
- Postcode
- W2 6BA
Site history
Applications at this address on the Westminster register
This site has had 9 applications since 2025: 2 approved, 0 refused.
-
26/04482/ADFULL Awaiting decision
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Details of landscaping scheme and public art pursuant to conditions 16 and 17 (partial) of planning permission dated 29.04.2026 (RN: 25/08163/FULL),
-
26/04481/ADFULL Awaiting decision
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Details of steel transfer structures over the taxi ramp, typical detail of the curtain walling, new lift access from the canal towpath to Bishop's Bridge Road, parked BMU unit and track at roof level, and external plant area at roof level and the louvre screens pursuant to condition 6 of planning permission dated 29.04.2026 (RN: 25/08163/FULL).
-
26/04369/ADFULL Awaiting decision
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Details of lighting pursuant to condition 19 of planning permission dated 29 April 2026 (RN: 25/08163/FULL).
-
26/03480/ADFULL Awaiting decision
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Details of a construction management plan and details of a Risk Assessment and Method Statement pursuant to condition 5 (part B only) and 15 (part B only) of planning permission dated 29th April 2026 (RN:25/08163/FULL)
-
26/03005/ADFULL Awaiting decision
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Detailed independent review of the environmental sustainability features (environmentally friendly features) of the development prior to occupation of the building pursuant to condition 3 of planning permission dated 29th April 2026 (RN:25/08163).
-
26/02586/ADV Granted
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Display of externally illuminated hoarding in two sections measuring 2.4m x 23.99m and 2.4m x 45.03m for a temporary period covering 30 April 2026 to 1 May 2031.
-
25/08163/FULL Awaiting decision
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Variation of condition 1 of planning permission dated 2nd April 2015 (RN:12/07668/FULL) for the Development of an office building comprising canal-side reception with 21 storeys of offices and either Class A1/A2/A3 use at canal-side and first floor level, alongside pedestrian linkages to Paddington Station and Bishop's Bridge Road, in conjunction with landscaping and other associated works. Namely, the integration of the ground/canal level retail unit and the office reception, with associated alteration to building entrances; the replacement of the full-height eastern terrace screen with a half height balustrade; and rearrangement / location of the photovoltaic panels at roof level.
-
25/05693/NMA Granted
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Amendments to planning permission dated 2nd April 2015 (RN:12/07668/FULL) for Development of an office building comprising canal-side reception with 21 storeys of offices and either Class A1/A2/A3 use at canal-side and first floor level, alongside pedestrian linkages to Paddington Station and Bishop's Bridge Road, in conjunction with landscaping and other associated works. Namely, rationalisation of the southern structural transfer expression; rationalisation of the canal side structural transfer expression to match the structural grid; reconfiguration of the east and central core, including: addition of a dedicated fire-fighting lift, addition of a combined passenger/evacuation lift and a passenger/goods lift that now serve the basement levels, and enlargement and relocation of the accessible WC from the eastern to the central core; external alterations to the western lift shaft façade, reducing the extent of glazing; the material treatment of the stair and lift cores changed from aluminium cladding to concrete; 500mm extension of the north office façade; replacement of the brise soleil (fins) with deeply expressed mullion system; external terraces reconfigured; Internal layout reconfiguration; and adjustment of the Building Maintenance Unit (BMU) layout at roof level.
Timeline
Dates from the published record
-
6 Aug 2026
Received by Westminster
-
11 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 61 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/08163/FULL Awaiting decision
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Variation of condition 1 of planning permission dated 2nd April 2015 (RN:12/07668/FULL) for the Development of an office building comprising canal-side reception with 21 storeys of offices and either Class A1/A2/A3 use at canal-side and first floor level, alongside pedestrian linkages to Paddington Station and Bishop's Bridge Road, in conjunction with landscaping and other associated works. Namely, the integration of the ground/canal level retail unit and the office reception, with associated alteration to building entrances; the replacement of the full-height eastern terrace screen with a half height balustrade; and rearrangement / location of the photovoltaic panels at roof level.
What happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster's median decision took 61 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Westminster's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
89% historically approved · decision due ~26 Aug
Details of lighting pursuant to condition 19 of planning permission dated 29 April 2026 (RN: 25/08163/FULL).
Awaiting decision -
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
87% historically approved · decision due ~2 Jul
Detailed independent review of the environmental sustainability features (environmentally friendly features) of the development prior to occupation of the building pursuant to condition 3 of planning permission dated 29th April 2026 (RN:25/08163).
Awaiting decision Full applications 5 docs -
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
87% historically approved · decision due ~22 Jul
Details of a construction management plan and details of a Risk Assessment and Method Statement pursuant to condition 5 (part B only) and 15 (part B only) of planning permission dated 29th April 2026 (RN:25/08163/FULL)
Awaiting decision Full applications 9 docs -
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
87% historically approved · decision due ~31 Aug
Details of landscaping scheme and public art pursuant to conditions 16 and 17 (partial) of planning permission dated 29.04.2026 (RN: 25/08163/FULL),
Awaiting decision Full applications 4 docs -
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Display of externally illuminated hoarding in two sections measuring 2.4m x 23.99m and 2.4m x 45.03m for a temporary period covering 30 April 2026 to 1 May 2031.
Granted Advertising 10 docs -
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
87% historically approved · decision due ~31 Aug
Details of steel transfer structures over the taxi ramp, typical detail of the curtain walling, new lift access from the canal towpath to Bishop's Bridge Road, parked BMU unit and track at roof level, and external plant area at roof level and the louvre screens pursuant to condition 6 of planning permission dated 29.04.2026 (RN: 25/08163/FULL).
Awaiting decision Full applications Windows or glazing 4 docs