Skip to content
PlanIndex Get alerts
Menu

Planning application

Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

Awaiting decision Westminster 26/04025/FULL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of awnings at ground floor level.

As published by the council, reference 26/04025/FULL

Application record

Reference
26/04025/FULL
Category
Full applications
Status
Pending
Received
18 Jun 2026
Validated
18 Jun 2026

Site history

Applications at this address on the Westminster register

This site has had 8 applications since 2023: 4 approved, 0 refused.

  • 26/00943/ADFULL Awaiting decision

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Detailed lighting strategy for the courtyard which includes includes details of all light fittings and lighting levels pursuant to Condition 42 of planning permission dated 1st October 2021 (RN:20/06914/FULL)

    Submitted 16 Feb 2026 Full applications
  • 26/00707/ADFULL Granted

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Details of the design strategy for all shopfronts and signs, and for the treatment of the courtyard shopfronts to ensure these are active frontages with public entrances and a scheme to demonstrate the area immediately behind the windows, shall not include any obscured glass and shall define any display panels within the windows pursuant to Conditions 5 and 43 of planning permission dated 1 October 2021 (RN: 20/06914/FULL)

    Decided 9 Mar 2026 Full applications
  • 26/00466/ADV Withdrawn

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Display of an A board positioned on the public highway measuring 0.89m x 0.645m. (SPLIT DECISION WITH 26/01680/ADV)

    Decided 22 Apr 2026 Advertising
  • 26/01680/ADV Granted

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Display of two signs of 3D lettering (non-illuminated) attached to the outside of the ground floor windows measuring 2m x 0.22m, one on Baker Street and one on George Street. (SPLIT DECISION WITH 26/00466/ADV)

    Decided 31 Mar 2026 Advertising
  • 25/07960/ADFULL Granted

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Detailed drawings and full particulars, including details of sound and odour attenuation measures, of the design, construction and insulation of the system for the extraction of cooking smells for all the restaurant Class E units in the event that these uses are implemented pusuant to condition 13 of planning permission dated 1st Octtober 2021 (RN: 20/06914/FULL).

    Decided 10 Apr 2026 Full applications
  • 25/02344/MOD106 Decided

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Deed of Variation to the s106 agreement dated 27 March 2019 (RN: 16/11376/FULL). Namely, to amend the level of the rent that will apply from first occupation of the 10 affordable units.

    Submitted 4 Apr 2025
  • 23/03661/ADFULL Granted

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Details of tree protection pursuant to Condition 29 (partial) of planning permission dated 01 October 2021 (RN: 20/06914/FULL).

    Decided 9 Aug 2023 Full applications

Timeline

Dates from the published record

  1. 18 Jun 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications