Skip to content
PlanIndex Get alerts
Menu

Planning application

Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

Granted Westminster 26/00707/ADFULL Approval of Details (Full PP)

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of the design strategy for all shopfronts and signs, and for the treatment of the courtyard shopfronts to ensure these are active frontages with public entrances and a scheme to demonstrate the area immediately behind the windows, shall not include any obscured glass and shall define any display panels within the windows pursuant to Conditions 5 and 43 of planning permission dated 1 October 2021 (RN: 20/06914/FULL)

As published by the council, reference 26/00707/ADFULL

Application record

Reference
26/00707/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Application Permitted
Received
5 Feb 2026
Validated
5 Feb 2026
Decided
9 Mar 2026
Ward
Marylebone
Decision by
Delegated Decision

Site history

Applications at this address on the Westminster register

This site has had 6 applications since 2025: 2 approved, 0 refused.

  • 26/04025/FULL Awaiting decision

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Installation of awnings at ground floor level.

    Submitted 18 Jun 2026 Full applications
  • 26/00943/ADFULL Awaiting decision

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Detailed lighting strategy for the courtyard which includes includes details of all light fittings and lighting levels pursuant to Condition 42 of planning permission dated 1st October 2021 (RN:20/06914/FULL)

    Submitted 16 Feb 2026 Full applications
  • 26/00466/ADV Withdrawn

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Display of an A board positioned on the public highway measuring 0.89m x 0.645m. (SPLIT DECISION WITH 26/01680/ADV)

    Decided 22 Apr 2026 Advertising
  • 26/01680/ADV Granted

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Display of two signs of 3D lettering (non-illuminated) attached to the outside of the ground floor windows measuring 2m x 0.22m, one on Baker Street and one on George Street. (SPLIT DECISION WITH 26/00466/ADV)

    Decided 31 Mar 2026 Advertising
  • 25/07960/ADFULL Awaiting decision

    Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London

    Detailed drawings and full particulars, including details of sound and odour attenuation measures, of the design, construction and insulation of the system for the extraction of cooking smells for all the restaurant Class E units in the event that these uses are implemented pusuant to condition 13 of planning permission dated 1st Octtober 2021 (RN:20/06914).

    Submitted 3 Nov 2025 Full applications

Timeline

Dates from the published record

  1. 5 Feb 2026

    Received by Westminster

  2. 9 Mar 2026

    Decision issued: Application Permitted

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

922 applications on PlanIndex · across 36 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Westminster granted permission on 9 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications