Planning application
Second Floor 16 Conduit Street London W1S 2XL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
To confirm the lawfulness of proposed residential use on the second floor of the property, in line with planning permission (RN 15/06533/FULL)
As published by the council, reference 26/01173/CLOPUD
Application record
- Reference
- 26/01173/CLOPUD
- Type
- Certificate of Lawfulness (proposed)
- Status
- Pending
- Received
- 24 Feb 2026
- Validated
- 24 Feb 2026
- Ward
- West End
- Postcode
- W1S 2XL
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2026.
-
26/01480/NMA Awaiting decision
Second Floor 16 Conduit Street London W1S 2XL
Amendment of planning permission dated 7 June 2016 (RN: 15/06533/FULL) for 'Dual/alternative use of the second floor for either office (Class B1a) or residential (Class C3) use (1 x 2 bedroom unit). Installation of 4 x external grilles at second floor level on the Mill Street elevation and 1 x external grille on Conduit Street elevation'. NAMELY to vary the wording of Condition 6 to allow the implementation of an alternative ventilation strategy.
-
26/01398/ADFULL Awaiting decision
Second Floor 16 Conduit Street London W1S 2XL
Details of waste storage arrangements pursuant to Condition 5 of the planning permission dated 7 June 2016 (RN: 15/06533/FULL)
Timeline
Dates from the published record
-
24 Feb 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 66 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided lawful development applications in a median of 78 days. More in our guide to how long planning decisions take.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Second Floor 16 Conduit Street London W1S 2XL
87% historically approved · decision due ~29 Apr
Details of waste storage arrangements pursuant to Condition 5 of the planning permission dated 7 June 2016 (RN: 15/06533/FULL)
Awaiting decision Full applications 4 docs -
Second Floor 16 Conduit Street London W1S 2XL
93% historically approved · decision due ~4 May
Amendment of planning permission dated 7 June 2016 (RN: 15/06533/FULL) for 'Dual/alternative use of the second floor for either office (Class B1a) or residential (Class C3) use (1 x 2 bedroom unit). Installation of 4 x external grilles at second floor level on the Mill Street elevation and 1 x external grille on Conduit Street elevation'. NAMELY to vary the wording of Condition 6 to allow the implementation of an alternative ventilation strategy.
Awaiting decision Amendments 5 docs -
6 - 8 Mill Street London W1S 2AZ
87% historically approved · decision due ~24 Jun
Detailed drawings of the fixed glazed awning and retractable awning pursuant to condition 3 of planning permission dated 17th March 2026 (RN: 25/06233/FULL).
Awaiting decision Full applications Windows or glazing 3 docs -
Sofia House 19 Conduit Street London W1S 2BH
89% historically approved · decision due ~14 Oct
Details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy; pursuant to condition 12 of Planning Permission dated 31 July 2026 (26/02841/FULL)
Awaiting decision Demolition -
Sofia House 19 Conduit Street London W1S 2BH
87% historically approved · decision due ~24 Jun
Erection of five storey rear extension including extension of lower ground floor, roof level alterations, including new dormers and extension to rear, installation of plant and alterations associated with refurbishment of building
Awaiting decision Full applications Extension Loft or dormer 55 docs -
4 Mill Street London W1S 2AX
Erection of a rear roof extension at third floor level with a sedum roof to the rear; replacement of windows at second floor level with double glazing timber windows; replacement of door and window to the existing rear first floor extension with double glazing timber windows including replacement of roofing; and associated works all in connection with the use of the first to third floor as four flats (Class C3)
Granted Full applications New dwelling Extension +1 29 docsSeveral homes
Other lawful development applications
In Westminster
-
26/06158/CLOPUD Awaiting decision
2 Hamilton Gardens London NW8 9PT
Erection of replacement, enlarged single storey ground floor rear extension.
-
26/06080/CLEUD Awaiting decision
91 Gloucester Place London W1U 6JG
Certificate of lawfulness for an existing use or development to confirm that the development authorised by full planning permission ref. 22/08385/FULL & listed building consent (RN 22/08386/LBC) has lawfully commenced as a result of the works evidenced.
-
26/06044/CLOPUD Awaiting decision
9 Abinger Mews W9 3SP
Proposed loft conversion with rear dormer and 3 front rooflights to existing mid-terraced house.
-
26/06035/CLOPUD Awaiting decision
30 Ashworth Road W9 1JY
Erection of new garden retaining wall and erection of new garden timber fence to match the height of existing fence.
-
26/05871/CLEUD Awaiting decision
32 Cambridge Street London SW1V 4QH
Confirmation of the lawful implementation of planning permission dated 13 August 2021 (RN: 21/04143/FULL) has commenced before the expiry of the three year time period and may, therefore, lawfully be carried out and completed.