Skip to content
PlanIndex Get alerts
Menu

Planning application

Sofia House 19 Conduit Street London W1S 2BH

Awaiting decision Westminster 26/05695/ADFULL

Works: Demolition

Relates to 26/02841/FULL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy; pursuant to condition 12 of Planning Permission dated 31 July 2026 (26/02841/FULL)

As published by the council, reference 26/05695/ADFULL

Application record

Reference
26/05695/ADFULL
Status
Pending
Received
19 Aug 2026
Validated
19 Aug 2026
Postcode
W1S 2BH

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2026.

  • 26/02841/FULL Awaiting decision

    Sofia House 19 Conduit Street London W1S 2BH

    Erection of five storey rear extension including extension of lower ground floor, roof level alterations, including new dormers and extension to rear, installation of plant and alterations associated with refurbishment of building

    Submitted 29 Apr 2026 Full applications

Timeline

Dates from the published record

  1. 19 Aug 2026

    Received by Westminster

  2. 24 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/02841/FULL Awaiting decision

    Sofia House 19 Conduit Street London W1S 2BH

    Erection of five storey rear extension including extension of lower ground floor, roof level alterations, including new dormers and extension to rear, installation of plant and alterations associated with refurbishment of building

    Submitted 29 Apr 2026 Full applications

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster's median decision took 61 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Westminster's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 20 Conduit Street London W1S 2XW

    26/05636/ADFULL Submitted 18 Aug 2026 7m away

    89% historically approved · decision due ~13 Oct

    Details of conservation rooflights, new rear door, and new rear window pursuant to condition 4 of planning permission dated 27.05.2026 (RN:26/02022/FULL). (Linked with 26/05630/ADLBC)

    Decided Loft or dormer Windows or glazing
  • 20 Conduit Street London W1S 2XW

    26/05630/ADLBC Submitted 18 Aug 2026 7m away

    89% historically approved · decision due ~13 Oct

    Detailed drawings of the Conservation Rooflights, new Rear Door, and new rear window; Pursuant to condition 2 of Listed Building Consent dated 27th May 2026 (26/02023/LBC)

    Decided Loft or dormer Windows or glazing
  • 20 Conduit Street London W1S 2XW

    25/06305/LBC Submitted 4 Sep 2025 8m away

    Installation of replacement ground floor primary office entrance door; Retention of fanlight and recolouring of building number signage and replacement of intercom. (Linked to 25/06304/FULL)

    Granted Heritage and listed buildings 13 docs
  • 20 Conduit Street London W1S 2XW

    25/06304/FULL Submitted 4 Sep 2025 8m away

    Installation of replacement ground floor primary office entrance door; Retention of fanlight and recolouring of building number signage and replacement of intercom.(Linked to 25/06305/LBC)

    Granted Full applications 18 docs
  • 20 Conduit Street London W1S 2XW

    26/02022/FULL Submitted 26 Mar 2026 9m away

    87% historically approved · decision due ~21 May

    Installation of two conservation style rooflights at roof level, installation of one rear casement window at fifth floor level, replacement of existing maintenance access door with new glazed door, replacement of damaged roof tiles and installation of insulation; and removal and installation of two new MVHR extract and intake roof cowls. (Linked to 26/02023/LBC)

    Awaiting decision Full applications Loft or dormer Roofing +1 26 docs
  • 20 Conduit Street London W1S 2XW

    26/02023/LBC Submitted 26 Mar 2026 10m away

    90% historically approved · decision due ~21 May

    Internal alterations at fifth floor level, installation of two conservation style rooflights at roof level, installation of one rear casement window at fifth floor level, replacement of existing maintenance access door with new glazed door, replacement of damaged roof tiles and installation of insulation; and removal and installation of two new MVHR extract and intake roof cowls. (Linked to 26/02022/FULL)

    Awaiting decision Heritage and listed buildings Loft or dormer Roofing +1 21 docs