Skip to content
PlanIndex Get alerts
Menu

Planning application

26/01398/ADFULL

Second Floor 16 Conduit Street London W1S 2XL

Awaiting decision Westminster Approval of Details (Full PP)

Proposal

Details of waste storage arrangements pursuant to Condition 5 of the planning permission dated 7 June 2016 (RN: 15/06533/FULL)

As published by the council, reference 26/01398/ADFULL

Timeline

Dates from the published record

  1. 4 Mar 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/01480/NMA Awaiting decision

    Second Floor 16 Conduit Street London W1S 2XL

    Amendment of planning permission dated 7 June 2016 (RN: 15/06533/FULL) for 'Dual/alternative use of the second floor for either office (Class B1a) or residential (Class C3) use (1 x 2 bedroom unit). Installation of 4 x external grilles at second floor level on the Mill Street elevation and 1 x external grille on Conduit Street elevation'. NAMELY to vary the wording of Condition 6 to allow the implementation of an alternative ventilation strategy.

    9 Mar 2026 0m away Amendments
  • 26/01173/CLOPUD Awaiting decision

    Second Floor 16 Conduit Street London W1S 2XL

    To confirm the lawfulness of proposed residential use on the second floor of the property, in line with planning permission (RN 15/06533/FULL)

    24 Feb 2026 2m away Lawful development
  • 26/02839/ADFULL Awaiting decision

    6 - 8 Mill Street London W1S 2AZ

    Detailed drawings of the fixed glazed awning and retractable awning pursuant to condition 3 of planning permission dated 17th March 2026 (RN: 25/06233/FULL).

    29 Apr 2026 12m away Full applications
  • 26/02841/FULL Awaiting decision

    Sofia House 19 Conduit Street London W1S 2BH

    Erection of five storey rear extension including extension of lower ground floor, roof level alterations, including new dormers and extension to rear, installation of plant and alterations associated with refurbishment of building

    29 Apr 2026 23m away Full applications
  • 25/05998/FULL Granted

    4 Mill Street London W1S 2AX

    Erection of a rear roof extension at third floor level with a sedum roof to the rear; replacement of windows at second floor level with double glazing timber windows; replacement of door and window to the existing rear first floor extension with double glazing timber windows including replacement of roofing; and associated works all in connection with the use of the first to third floor as four flats (Class C3)

    22 Aug 2025 24m away Full applications
  • 26/02022/FULL Awaiting decision

    20 Conduit Street London W1S 2XW

    Installation of two conservation style rooflights at roof level, installation of one rear casement window at fifth floor level, replacement of existing maintenance access door with new glazed door, replacement of damaged roof tiles and installation of insulation; and removal and installation of two new MVHR extract and intake roof cowls. (Linked to 26/02023/LBC)

    26 Mar 2026 28m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications