Planning application
26/00922/ADFULL
The Westbury Hotel 37 Conduit Street London W1S 2YF
Proposal
Details of Public Art pursuant to Condition 19 of planning permission dated 15/11/2024 (RN: 24/02402/FULL)
As published by the council, reference 26/00922/ADFULL
Timeline
Dates from the published record
-
13 Feb 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01630/FULL Awaiting decision
The Westbury Hotel 37 Conduit Street London W1S 2YF
Variation of Condition 18 of planning permission dated 15th November 2024 (RN 24/02402/FULL) for: Excavation of extension to provide a second basement level, demolition and re-build of the 6th and 7th floors and extension to form new 8th floor, erection of rear extension from ground to new 8th floor level, all to enlarge existing hotel (Class C1). External alterations including alterations to the appearance of the existing facades namely, to amend the wording of Condition 18 to require that prior to occupation, a contribution be made to the Historic England Records enhancement project by way of inputting new data for the Civil War Defences for the 41 identified sites surrounding Westbury Hotel as identified within the search area of the WSI Addendum dated 04/02/2026.
-
26/02089/ADFULL Awaiting decision
The Westbury Hotel 37 Conduit Street London W1S 2YF
Detailed drawings showing the following alteration to the scheme: a planting scheme within the new terrace at ninth floor level pursuant to condition 10 of planning permission dated 29th November 2024 (RN: 24/06866/FULL).
-
22/04725/ADFULL Granted
The Westbury Hotel 37 Conduit Street London W1S 2YF
Details of all new windows and metal and stone framework pursuant to Condition 15 (1 & 2) of planning permission dated 09 March 2020 (RN:19/04899/FULL)
-
26/02090/ADFULL Awaiting decision
The Westbury Hotel 37 Conduit Street London W1S 2YF
Details of windows and the metal and stone framework pursuant to Condition 15 of planning permission dated 15/11/2024 (RN: 24/02402/FULL)
-
26/00419/ADFULL Awaiting decision
The Westbury Hotel 37 Conduit Street London W1S 2YF
Details of Service Management Plan; Pursuant to condition 16 of planning permission dated 07 October 2024 (RN: 24/02402/FULL)
-
26/00182/FULL Granted
The Westbury Hotel 37 Conduit Street London W1S 2YF
Installation of a safety guard rail on the eigth floor roof level and the installation of plant within the rear lightwell at second and third floor levels.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.