Planning application
26/00722/NMA
The Westbury Hotel 37 Conduit Street London W1S 2YF
Proposal
Amendments to planning permission dated 25 February 2025 (RN: 24/08569/FULL ) for External alterations including the installation of a plant tower at 1st to 4th floor level (with an external stair) within the north-eastern lightwell, installation of plant within a louvred enclosures at rear 1st floor level, installation of plant and associated louvred enclosures (with photovoltaics above) together with associated pipework and ducting, automatic opening vents and smoke extractors above at main roof level (9th floor) and to the roof of the 9th floor accommodation and installation of 3no. satellite dishes at main roof level (9th floor). NAMELY, to remove GRP enclosure on the roof of the 9th floor and replace with switchboard.
As published by the council, reference 26/00722/NMA
Timeline
Dates from the published record
-
6 Feb 2026
Received by Westminster
-
9 Mar 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
26/00721/NMA Granted
The Westbury Hotel 37 Conduit Street London W1S 2YF
Amendments to planning permission dated 29 November 2024 (RN: 24/06866/FULL) for Erection of a ninth floor extension with terraces accessible from the new accommodation. Erection of a fire escape stair/hatch and installation of railing to fire escape route at ninth floor level. Installation of photovoltaics to ninth floor and to the roof of additional accommodation. All in connection with the enlargement and retrofit of the existing hotel (Class C1). NAMELY, to alter the approved balustrade around the roof terrace from metal to glass, alter access point to terrace
-
26/00720/ADV Granted
The Westbury Hotel 37 Conduit Street London W1S 2YF
Display of 1x flag with branding over entrance canopy measuring 0.91m x 1.83, 1x internally illuminated (LED edge) fascia sign measuring 1.2m x 0.27m and two non-illuminated entrance signs measuring 0.47m x 0.7m and 0.42m x 0.42m
-
25/09099/FULL Granted
The Westbury Hotel 37 Conduit Street London W1S 2YF
Re-installation of five flagpoles on canopy of hotel entrance
-
26/00182/FULL Granted
The Westbury Hotel 37 Conduit Street London W1S 2YF
Installation of a safety guard rail on the eigth floor roof level and the installation of plant within the rear lightwell at second and third floor levels.
-
26/01630/FULL Awaiting decision
The Westbury Hotel 37 Conduit Street London W1S 2YF
Variation of Condition 18 of planning permission dated 15th November 2024 (RN 24/02402/FULL) for: Excavation of extension to provide a second basement level, demolition and re-build of the 6th and 7th floors and extension to form new 8th floor, erection of rear extension from ground to new 8th floor level, all to enlarge existing hotel (Class C1). External alterations including alterations to the appearance of the existing facades namely, to amend the wording of Condition 18 to require that prior to occupation, a contribution be made to the Historic England Records enhancement project by way of inputting new data for the Civil War Defences for the 41 identified sites surrounding Westbury Hotel as identified within the search area of the WSI Addendum dated 04/02/2026.
-
26/02089/ADFULL Awaiting decision
The Westbury Hotel 37 Conduit Street London W1S 2YF
Detailed drawings showing the following alteration to the scheme: a planting scheme within the new terrace at ninth floor level pursuant to condition 10 of planning permission dated 29th November 2024 (RN: 24/06866/FULL).
Other amendments applications
In Westminster
-
26/04962/NMA Awaiting decision
Serpentine Gallery Kensington Gardens Exhibition Road London W2 3XA
Amendments to planning permission dated 27 February 2025 (RN: 24/08940/FULL) for the installation of temporary art sculpture from 24 March 2025 to 09 September 2025; NAMELY to extend the temporary planning consent until 21st March 2027.
-
26/04951/NMA Awaiting decision
43 - 45 Portman Square London W1H 6LY
Amendments to planning permission dated 22 April 2026 (25/06153/FULL) for: Variation of Condition 1 of planning permission dated 7 April 2025 (24/04987/FULL) for: Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works NAMELY; to amend the wording of Condition 27 to allow basement demolition work to proceed.
-
26/04873/NMA Awaiting decision
Orbis House 5 Mansfield Street London W1G 9NG
Amendments to planning permission dated 05 September 2024 (RN: 24/01895/FULL) for: new courtyard surface including walk-on rooflight; window and door alterations; new window to Mansfield Mews at second floor level; new rooflights; repairs to roof and external brickwork; erection of new staircase in front area lightwell; partial infill of rear lightwell at ground floor level; erection of roof terrace; installation of PV panels at roof level; and associated works namely; to allow provision of guarding system to provide safe access for maintenance across the roof; alteration at south elevation omitting window SFW11 from the new WC, remove the existing RWP from the internal courtyard corner, removal of the existing plastic section of a redundant vent pipe at lower level and retain original lead; new cast iron rain water pipes at west elevation; and internal layout alterations at basement, ground, 2nd, 3rd floors. (Linked with 26/04876/LBC)
-
26/04870/NMA Awaiting decision
34 Park Street London W1K 2JD
Amendments to planning permission dated 8 May 2026 (25/07808/FULL) for general refurbishment and M&E upgrade of the office building namely; roof walkable skylight, GF meeting room wall mounted TV, garden bench and planters, fire lobbies, L4 glass partition, reception to hall door swing change, front lightwell electric cupboard change, wall panelling on LGF and L5, LGF modular screen, LGF courtyard window door infill, and LGF cove lighting.
-
26/04816/NMA Awaiting decision
Ebury Bridge Estate Ebury Bridge Road London SW1W 8PX
Amendments to planning permission dated 21 July 2023 (RN:23/00331/COOUT) for a mixed use development in outline for residential floorspace and ancillary residential facilities (Class C3) non-residential floorspace comprising flexible retail (Classes A1 - A4), community (Class D1), leisure (Class D2) and workspace (Class B1) floorspace; provision of basement; new pedestrian and vehicular access; and associated amenity space, open space, plant, landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works; and detailed planning consent for Blocks 7 and 8 comprising residential floorspace and ancillary residential facilities (Class C3); provision of a basement; new pedestrian and vehicular access; and associated amenity space landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works, namely amendments to the approved Masterplan Phasing to incorporate enabling works and piling in Phase 2a and 3a.