Skip to content
PlanIndex Get alerts
Menu

Planning application

London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE

Awaiting decision Westminster 25/08459/FULL Full Planning Permission Application

Works: Extension Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of lower ground and ground floor extensions to the rear infill building in association with the provision of one additional hotel bedroom. Enlargement of windows at first and second floor of the rear infill building facing the courtyard. (Linked to 25/08460/LBC)

As published by the council, reference 25/08459/FULL

Application record

Reference
25/08459/FULL
Type
Full Planning Permission Application
Status
Pending
Received
19 Nov 2025
Validated
19 Nov 2025
Ward
Lancaster Gate
Postcode
W2 6QE

Timeline

Dates from the published record

  1. 19 Nov 2025

    Received by Westminster

  2. 20 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 14 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in The Oval

481 applications on PlanIndex · across 20 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

72 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE

    25/08460/LBC Submitted 19 Nov 2025 0m away

    90% historically approved · decision due ~14 Jan

    Erection of lower ground and ground floor extensions to the rear infill building in association with the provision of one additional hotel bedroom. Enlargement of windows at first and second floor of the rear infill building facing the courtyard. (Linked to 25/08459/FULL)

    Awaiting decision Heritage and listed buildings Extension Windows or glazing 21 docs
  • London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE

    25/09334/FULL Submitted 24 Dec 2025 3m away

    87% historically approved · decision due ~18 Feb

    Alteration to the secondary pitch of the mansard roof to facilitate air-to-air heat pumps (AAHPs) and installation of AAHPs at the rear of the property. Front façade alterations to fifth floor windows, paint and repair to all front windows, balcony bracket and frieze & surround details. [Linked to 25/09335/LBC]

    Awaiting decision Full applications Loft or dormer Windows or glazing 24 docs
  • London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE

    25/09337/LBC Submitted 24 Dec 2025 3m away

    90% historically approved · decision due ~18 Feb

    Reinstatement of front lightwell windows and doors and installation of an enlarged window facing the internal courtyard. [Linked to 25/09336/FULL]

    Awaiting decision Heritage and listed buildings Windows or glazing 13 docs
  • London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE

    25/09335/LBC Submitted 24 Dec 2025 3m away

    90% historically approved · decision due ~18 Feb

    Alteration to the secondary pitch of the mansard roof to facilitate air-to-air heat pumps (AAHPs) and installation of AAHPs at the rear of the property. Front façade alterations to fifth floor windows, paint and repair to all front windows, balcony bracket and frieze & surround details. [Linked to 25/09334/FULL]

    Awaiting decision Heritage and listed buildings Loft or dormer Windows or glazing 16 docs
  • London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE

    25/09332/FULL Submitted 24 Dec 2025 3m away

    87% historically approved · decision due ~18 Feb

    Alteration to the secondary pitch of the mansard roof to facilitate air-to-air heat pumps (AAHPs) and installation of AAHPs at the rear basement courtyard level of the property. Front façade alterations to fifth floor windows, paint and repair to all front windows, balcony bracket and frieze & surround details. [Linked to 25/09333/LBC]

    Awaiting decision Full applications Loft or dormer Windows or glazing 24 docs
  • London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE

    25/09336/FULL Submitted 24 Dec 2025 3m away

    87% historically approved · decision due ~18 Feb

    Reinstatement of front lightwell windows and doors and installation of an enlarged window facing the internal courtyard to the rear. [Linked to 25/09337/LBC]

    Awaiting decision Full applications Windows or glazing 16 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications