Planning application
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Works: Roofing Windows or glazing
Relates to 25/09333/LBC
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of refined design of window mouldings and parapet at 5th and 6th floor; Iron backet design for first floor balcony; Enclosures for rear lightwell plant; Welsh slate sample for new front roof slope; Reuse of existing roof timbers for new roof pitch; pursuant to condition 3 of Listed Building Consent dated 16th October 2026 (25/09333/LBC)
As published by the council, reference 26/07177/ADLBC
Application record
- Reference
- 26/07177/ADLBC
- Status
- Pending
- Received
- 20 Oct 2026
- Validated
- 20 Oct 2026
- Postcode
- W2 6QE
Site history
Applications at this address on the Westminster register
This site has had 12 applications since 2025.
-
26/05291/TDD Awaiting decision
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
1 x Ceanothus (rear garden north eastern tree): removal
-
26/04774/ADFULL Decided
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Details of vertical and horizontal sections through new windows and doors and simplified design to sash windows reducing pane numbers pursuant to condition 4 of planning permission dated 07 May 2026 (RN: 25/09336/FULL). (Linked with 26/04744/ADLBC)
-
26/04744/ADLBC Decided
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Details of vertical and horizontal sections through new windows and doors and simplified design to sash windows reducing pane numbers pursuant to condition 3 of listed building consent dated 07 May 2026 (RN: 25/09337/LBC). (Linked with 26/04774/ADFULL)
-
25/09334/FULL Awaiting decision
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Alteration to the secondary pitch of the mansard roof to facilitate air-to-air heat pumps (AAHPs) and installation of AAHPs at the rear of the property. Front façade alterations to fifth floor windows, paint and repair to all front windows, balcony bracket and frieze & surround details. [Linked to 25/09335/LBC]
-
25/09337/LBC Awaiting decision
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Reinstatement of front lightwell windows and doors and installation of an enlarged window facing the internal courtyard. [Linked to 25/09336/FULL]
-
25/09335/LBC Awaiting decision
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Alteration to the secondary pitch of the mansard roof to facilitate air-to-air heat pumps (AAHPs) and installation of AAHPs at the rear of the property. Front façade alterations to fifth floor windows, paint and repair to all front windows, balcony bracket and frieze & surround details. [Linked to 25/09334/FULL]
-
25/09333/LBC Awaiting decision
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Alteration to the secondary pitch of the mansard roof to facilitate air-to-air heat pumps (AAHPs) and installation of AAHPs at the rear of the property. Front façade alterations to fifth floor windows, paint and repair to all front windows, balcony bracket and frieze & surround details. [Linked to 25/09332/FULL]
-
25/09332/FULL Awaiting decision
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Alteration to the secondary pitch of the mansard roof to facilitate air-to-air heat pumps (AAHPs) and installation of AAHPs at the rear basement courtyard level of the property. Front façade alterations to fifth floor windows, paint and repair to all front windows, balcony bracket and frieze & surround details. [Linked to 25/09333/LBC]
-
25/09336/FULL Awaiting decision
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Reinstatement of front lightwell windows and doors and installation of an enlarged window facing the internal courtyard to the rear. [Linked to 25/09337/LBC]
-
25/08459/FULL Awaiting decision
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Erection of lower ground and ground floor extensions to the rear infill building in association with the provision of one additional hotel bedroom. Enlargement of windows at first and second floor of the rear infill building facing the courtyard. (Linked to 25/08460/LBC)
Timeline
Dates from the published record
-
20 Oct 2026
Received by Westminster
-
22 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 86 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/09333/LBC Awaiting decision
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
Alteration to the secondary pitch of the mansard roof to facilitate air-to-air heat pumps (AAHPs) and installation of AAHPs at the rear of the property. Front façade alterations to fifth floor windows, paint and repair to all front windows, balcony bracket and frieze & surround details. [Linked to 25/09332/FULL]
What happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster's median decision took 86 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Westminster's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
89% historically approved · decision due ~11 Sep
Details of vertical and horizontal sections through new windows and doors and simplified design to sash windows reducing pane numbers pursuant to condition 4 of planning permission dated 07 May 2026 (RN: 25/09336/FULL). (Linked with 26/04744/ADLBC)
Decided Windows or glazing -
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
89% historically approved · decision due ~11 Sep
Details of vertical and horizontal sections through new windows and doors and simplified design to sash windows reducing pane numbers pursuant to condition 3 of listed building consent dated 07 May 2026 (RN: 25/09337/LBC). (Linked with 26/04774/ADFULL)
Decided Windows or glazing -
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
89% historically approved · decision due ~22 Sep
1 x Ceanothus (rear garden north eastern tree): removal
Awaiting decision Trees -
96 Westbourne Terrace London W2 6QE
1 x London Plane (Outside No. 96): Thin crown by 20%.
Refused Trees 2 docs -
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
88% historically approved · decision due ~14 Jan
Erection of lower ground and ground floor extensions to the rear infill building in association with the provision of one additional hotel bedroom. Enlargement of windows at first and second floor of the rear infill building facing the courtyard. (Linked to 25/08460/LBC)
Awaiting decision Full applications Extension Windows or glazing 72 docs -
London Westbourne Hotel 100 - 102 Westbourne Terrace London W2 6QE
90% historically approved · decision due ~14 Jan
Erection of lower ground and ground floor extensions to the rear infill building in association with the provision of one additional hotel bedroom. Enlargement of windows at first and second floor of the rear infill building facing the courtyard. (Linked to 25/08459/FULL)
Awaiting decision Heritage and listed buildings Extension Windows or glazing 21 docs