Planning application

26/00509/CONDC

Land To The South Of National Grids Electrical Substation For New Cable Tunnel Fort Road Tilbury Essex

Granted Thurrock Condition Clearance

Proposal

Application for the approval of details reserved by condition no. 16 (Barge Movements) of planning permission ref 25/01480/CV (Application for the variation of condition no. 16 (Barge Movements) of planning permission ref. 25/00746/CV (Application for the variation of condition nos. 16 (Spoil Removal) and 17 (Barge Movements) of planning permission ref. 23/01502/FUL.)

As published by the council, reference 26/00509/CONDC

Timeline

Dates from the published record

  1. 11 May 2026

    Received by Thurrock

  2. 12 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Jul 2026

    Decision issued: Approved

  4. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 25/00598/FUL Awaiting decision

    Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex

    Hybrid planning application, comprising (1) in the Outline element the following phased development: B2 General Industrial and B8 Storage & Distribution including external storage and ancillary offices, Port-related uses including general haulier parking and a CMAT (Construction Materials and Aggregates Terminal); AND (2) in the Full element the following enabling infrastructure and other works: access and Port estate roads, a rail terminal connecting to the Tilbury2 railway siding, land re-grading and development platforms, utilities, drainage and ecological mitigation.

    19 May 2025 197m away Full applications
  • 24/01023/SCO Decided

    Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex

    Request for Scoping Opinion - Regulation 15 Of The Town And Country Planning (Environmental Impact Assessment) Regulations 2017 (As Amended) at Land At Tilbury3, Port Of Tilbury London Limited (Potll)

    25 Sep 2024 197m away Outline
  • 25/00623/DCOAPP Awaiting decision

    Tilbury 2 Fort Road Tilbury Essex

    Application by Port of Tilbury London Limited under paragraph 17 of Schedule 2 to the Port of Tilbury (Expansion) Order 2019 to replace the Framework Travel Plan and the Sustainable Distribution Plan referred to by paragraph 11 of that Schedule with a Framework Combined Travel and Sustainable Distribution Plan (FCTSDP). This will have the effect of meaning that Tilbury2 must instead be operated in accordance with the Framework Combined Travel and Sustainable Distribution Plan (FCTSDP).

    23 May 2025 334m away

In Thurrock

  • 26/00856/CONDC Awaiting decision

    Ell A Mar 245 Branksome Avenue Stanford Le Hope Essex SS17 8DF

    Application for the approval of details reserved by condition no. 3 (Highways Layout Details), 4 (Electric Vehicle (EV) Charging Points), 5 Materials (Details/samples to be provided), 6 (Details of boundary treatments), 7 Hard & Soft Landscaping (Full details), 8 (Design details for submission), 10 (Construction Environment Management Plan), 14 (Refuse and Recycling Storage), 15 (Site Characterisation), 18 (Renewable Energy), 19 (Water Efficiency Measures), 20 (Surface/Foul Water Drainage), 21 (Biodiversity Net Gain), 22 (Provision of superfast broadband) & 23 (Ecological Survey)of planning permission ref 24/01250/FUL (The proposed development consists of the demolition of an existing residential bungalow and the construction of 4 no. detached bungalows, 2 single storey and 2 double storey Chalet style)

    23 Jul 2026 Conditions
  • 26/00568/DVOB Refused

    Lawns Court Thomas Bata Avenue East Tilbury Essex

    Application under Section 106A(6)(c) to modify the agreed obligations under S106 legal agreement dated 3.07.2018 for planning permission 16/01148/FUL [Construction of 18 dwellings, including a new vehicular and pedestrian access off Thomas Bata Avenue, provision of public space and landscaping] to allow for the replacement of on-site affordable housing with a commutable sum and variation of the payment trigger for the Education contributions.

    21 May 2026 Conditions
  • 26/00846/CV Awaiting decision

    Sleepy Hollow Farm Chadwell Road Grays Essex RM17 5TG

    Application for the variation of condition nos. 10 (Bonfires) of planning permission ref 24/00319/FUL (Partial change of use of the land, from agricultural to residential use class, demolition of mobile home, stables and small structures and erection of one dwelling)

    22 Jul 2026 Conditions
  • 26/00833/CONDC Awaiting decision

    School House Annalee Gardens South Ockendon Essex RM15 5DE

    Application for the approval of details reserved by condition no. 10 (Construction Environmental Management Plan) & 13 (Preliminary Ecological Appraisal & Roost Assessment) of planning permission ref 26/00083/FUL (Erection of 6 no. 3 bed dwellings, formation of vehicular crossovers providing off street parking and other associated development.)

    20 Jul 2026 Conditions
  • 26/00569/CONDC Decided

    Berth 40A Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7EH

    Application for the approval of details reserved by condition no 14 (Lighting) of planning permission ref: 23/00554/FUL for the Construction and operation of a cementitious products importation, manufacture and distribution facility.)

    21 May 2026 Conditions