Skip to content
PlanIndex Get alerts
Menu

Planning application

Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

Awaiting decision Thurrock 26/01047/CONDC Condition Clearance

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application for the approval of details reserved by condition no. 33 (Drainage Scheme) of the deemed planning permision (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power). Condition previosuly dischared in condition clearnce application 23/00452/CONDC

As published by the council, reference 26/01047/CONDC

Application record

Reference
26/01047/CONDC
Type
Condition Clearance
Status
Awaiting decision
Received
4 Sep 2026
Validated
8 Sep 2026
Ward
Tilbury Riverside
Postcode
RM18 7NU

Site history

Applications at this address on the Thurrock register

This site has had 6 applications since 2023: 5 approved, 0 refused.

  • 26/00526/CONDC Granted

    Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    Application for the approval of details reserved by condition no. 17 (Flood Emergency Response Plan) of planning permission ref 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power - Phase 2).

    Decided 14 Aug 2026 Conditions
  • 26/00341/CONDC Granted

    Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    Application for the approval of details reserved by condition no. 53 (Pest and Vermin Management Plan) of planning permission ref 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power - Phase 2).

    Decided 12 Jun 2026 Conditions
  • 26/00275/CONDC Granted

    Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    Application for the approval of details reserved by condition no. 10; parts i, ii, iii, iv, v & vi (parts vii & viii excluded) (Site Layout) of planning permission ref. 12.04.09.04/266C (as varied) (Construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks, Essex - Tilbury Green Power).

    Decided 20 May 2026 Conditions
  • 24/00976/CONDC Granted

    Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    Application to discharge condition 23 (Impact Piling) of permission ref. 12.04.09.04.266C - as varied (s36 Electricity Act)

    Decided 14 Nov 2024 Conditions
  • 23/00121/CONDC Granted

    Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    Application for the approval of details reserved by condition no.4 (wheel cleansing facilities) of the deemed planning permision (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power - Phase 2).

    Decided 4 Apr 2023 Conditions

Timeline

Dates from the published record

  1. 4 Sep 2026

    Received by Thurrock

  2. 8 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 3 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Thurrock took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Thurrock for determination, against a statutory target of eight weeks. Over the last year Thurrock decided condition discharge and variation applications in a median of 58 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    26/00526/CONDC Submitted 14 May 2026 100 yards away

    Application for the approval of details reserved by condition no. 17 (Flood Emergency Response Plan) of planning permission ref 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power - Phase 2).

    Granted Conditions 4 docs
  • Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    26/00341/CONDC Submitted 25 Mar 2026 100 yards away

    Application for the approval of details reserved by condition no. 53 (Pest and Vermin Management Plan) of planning permission ref 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power - Phase 2).

    Granted Conditions 4 docs
  • Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    26/00275/CONDC Submitted 10 Mar 2026 100 yards away

    Application for the approval of details reserved by condition no. 10; parts i, ii, iii, iv, v & vi (parts vii & viii excluded) (Site Layout) of planning permission ref. 12.04.09.04/266C (as varied) (Construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks, Essex - Tilbury Green Power).

    Granted Conditions 34 docs
  • Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    23/00121/CONDC Submitted 31 Jan 2023 100 yards away

    Application for the approval of details reserved by condition no.4 (wheel cleansing facilities) of the deemed planning permision (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power - Phase 2).

    Granted Conditions 9 docs
  • Tilbury Green Power Tilbury Freeport Tilbury Essex RM18 7NU

    22/01688/CONDC Submitted 17 Dec 2022 100 yards away

    Application for the approval of details reserved by condition no.10 (Site Layout, Design and Fire Protection) of the deemed planning permision (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power).

    Granted Conditions 17 docs
  • Tilbury Green Power Tilbury Freeport Tilbury Essex RM18 7NU

    22/01684/CONDC Submitted 16 Dec 2022 100 yards away

    Application for the approval of details reserved by condition no.29 (noise and vibration management plan) of the deemed planning permission (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power).

    Granted Conditions 4 docs

In Thurrock

  • 26/01037/CV Awaiting decision

    1 Guardian Avenue North Stifford Grays Essex RM16 5UP

    Application for the variation of Condition 2 (Approved Plans) of planning permission ref. 26/00345/HHA (Single storey rear extension).

    Received 2 Sep, published by the council 4 Sep 2026 Conditions
  • 26/01019/CV Awaiting decision

    Jemaine 3 Branksome Avenue Stanford Le Hope Essex SS17 8AZ

    Application for the variation of condition nos. 2 (Approved Plans) of planning permission ref 23/01183/FUL (Demolition of the existing dwelling and construction of two detached properties) Amendment sought: Alterations of the roof forms including the addtion of 6 skylights to the roof of the dwelling within plot 1 and 7 skylights to the roof of the dwelling within plot 2 to facilitate a room within the roof.

    Received 31 Aug, published by the council 4 Sep 2026 Conditions
  • 26/00679/CONDC Granted

    Rear Of 16 London Road Stanford Le Hope Essex SS17 0LD

    Application for the approval of details reserved by Condition 7 (Construction Environmental Management Plan [CEMP]) of planning permission ref 26/00247/FUL (The demolition of two existing single-storey buildings, the construction of a new single-storey building, Use of part of the building as a Hot Food Takeaway (Sui Generis), Provision of storage space for the existing retail unit to the front, Installation of a kitchen extraction and ventilation duct system.)

    Received 18 Jun, published by the council 23 Jul 2026 Conditions
  • 26/00746/CONDC Granted

    Bannatyne's Health Club And Spa Howard Road Chafford Hundred Grays Essex RM16 6YJ

    Application for the Discharge of Condition nos Condition 5 (Lighting) and Condition 6 (Biodiversity Net Gain) of 25/01104/CV [Application for the variation of condition no 4. (use of courts) of planning permission ref. 25/00250/FUL (The erection of 3 no. padel tennis courts with canopies and associated floodlighting, car parking and fencing)]

    Received 30 Jun, published by the council 23 Jul 2026 Conditions
  • 26/00526/CONDC Granted

    Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

    Application for the approval of details reserved by condition no. 17 (Flood Emergency Response Plan) of planning permission ref 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power - Phase 2).

    Received 14 May, published by the council 23 Jul 2026 Conditions