Planning application
Tilbury 2 Fort Road Tilbury Essex
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application by Port of Tilbury London Limited under paragraph 17 of Schedule 2 to the Port of Tilbury (Expansion) Order 2019 to replace the Framework Travel Plan and the Sustainable Distribution Plan referred to by paragraph 11 of that Schedule with a Framework Combined Travel and Sustainable Distribution Plan (FCTSDP). This will have the effect of meaning that Tilbury2 must instead be operated in accordance with the Framework Combined Travel and Sustainable Distribution Plan (FCTSDP).
As published by the council, reference 25/00623/DCOAPP
Application record
- Reference
- 25/00623/DCOAPP
- Type
- Development Consent Order Application
- Status
- Awaiting decision
- Received
- 23 May 2025
- Validated
- 28 May 2025
- Ward
- OLD Tilbury Riverside And Thurrock Park
Timeline
Dates from the published record
-
23 May 2025
Received by Thurrock
-
28 May 2025
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Thurrock took a median of 57 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Vincent and Gorbing Limited Agent, registered in Stevenage
Active · incorporated 1985 · Stevenage
60 applications on PlanIndex · across 17 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordPort of Tilbury London Limited Applicant, registered in Tilbury
Active · incorporated 1991 · Tilbury
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
- APPENDIX 18.2 FRAMEWORK CTSDP REV. D
- PORT OF TILBURY (EXPANSION) ORDER - FINAL (VALIDATED)
- COVERING LETTER - COMBINED TRAVEL PLAN
- APPENDIX 18.2 FRAMEWORK CTSDP (FINAL)
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Thurrock for determination, against a statutory target of eight weeks. Over the last year Thurrock's median decision took 57 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Thurrock's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Land To The South Of National Grids Electrical Substation For New Cable Tunnel Fort Road Tilbury Essex
Application for the approval of details reserved by condition no. 16 (Barge Movements) of planning permission ref 25/01480/CV (Application for the variation of condition no. 16 (Barge Movements) of planning permission ref. 25/00746/CV (Application for the variation of condition nos. 16 (Spoil Removal) and 17 (Barge Movements) of planning permission ref. 23/01502/FUL.)
Granted Conditions 4 docs -
Marsh Farm Sewage Treatment Plant Fort Road Tilbury Essex
Removal of existing structures and buildings, re-grading of the land, laying of a concrete pavement, installation of upgraded drainage, lighting and security fencing and use of the land for port-related storage including haulier parking and/or storage of new motor vehicles and/or storage or port-related product with access from Tilbury2 port.
Granted Full applications 32 docs -
HyPort Land Adjacent Sub Station Tilbury 2 New Port Approach Tilbury Essex
Application for the approval of details reserved by condition Nos. 8 (Construction Environmental Management Plan - CEMP) & 13 (Biodiversity Net Gain Implementation) of planning permission ref: 25/00918/FUL (Construction and operation of an electrolytic low carbon hydrogen production site, comprising electrolysers, an electrical switchroom, compressors, tube trailer filling bays, medium pressure storage tanks, buffer storage tanks and associated hard and soft landscaping.)
Decided Conditions 24 docs