Planning application
Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Hybrid planning application, comprising (1) in the Outline element the following phased development: B2 General Industrial and B8 Storage & Distribution including external storage and ancillary offices, Port-related uses including general haulier parking and a CMAT (Construction Materials and Aggregates Terminal); AND (2) in the Full element the following enabling infrastructure and other works: access and Port estate roads, a rail terminal connecting to the Tilbury2 railway siding, land re-grading and development platforms, utilities, drainage and ecological mitigation.
As published by the council, reference 25/00598/FUL
Application record
- Reference
- 25/00598/FUL
- Type
- Full Planning Permission Application
- Status
- Awaiting decision
- Received
- 19 May 2025
- Validated
- 30 May 2025
- Ward
- OLD Tilbury Riverside And Thurrock Park
Site history
Applications at this address on the Thurrock register
This site has had 2 applications since 2024.
-
24/01023/SCO Decided
Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex
Request for Scoping Opinion - Regulation 15 Of The Town And Country Planning (Environmental Impact Assessment) Regulations 2017 (As Amended) at Land At Tilbury3, Port Of Tilbury London Limited (Potll)
Timeline
Dates from the published record
-
19 May 2025
Received by Thurrock
-
30 May 2025
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Thurrock took a median of 57 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Vincent and Gorbing Limited Agent, registered in Stevenage
Active · incorporated 1985 · Stevenage
60 applications on PlanIndex · across 17 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
245 documents on file for this application
- RESPONSE TO NON STAT CONSULTEES
- RESPONSE TO NATURAL ENGLAND
- BUGLIFE
- ESSEX FIELD CLUB
- NATIONAL HIGHWAYS
- ADDITIONAL DRAINAGE INFORMATION
- ADDITIONAL DRAINAGE INFORMATION
- ES VOL 2 - APPENDIX 18.3 OUTLINE CTMP - REV D
- ES VOL 2 - APPENDIX 18.2 FRAMEWORK CTSDP - REV D
- ENVIRONMENT AGENCY FEEDBACK RESPONSES
- POSITION STATEMENT WITH APPENDICES
- POSITION STATEMENT WITHOUT APPENDICES
- ES VOL 2 - APPENDIX 18.2 FRAMEWORK CTSDP - REV D - TRACKED
- UPDATED_POTLL RESPONSE TO LLFA - 18TH DEC
- APPENDIX 1 - 03.04.04 SURROUNDING DRAINAGE FEATURES
- PROPOSED SITE PLAN
- PORT OF LONDON AUTHORITY
- LOCAL LEAD FLOOD AUTHORITY
- EMERGENCY PLANNING
- NATURAL ENGLAND
- NATIONAL HIGHWAYS CONSULTATION RESPONSE 2
- LISTED BUILDINGS
- HISTORIC ENGLAND
- ENVIRONMENTAL HEALTH
- NATIONAL HIGHWAYS
- ES VOL 2 11.2 DRAINAGE STRATEGY
- APPLICANT RESPONSE TO LLFA
- WATER FRAMEWORK DIRECTIVE REPORT
- ESSEX COUNTY FIRE AND RESCUE
- ENVIRONMENT AGENCY
- FRAMEWORK COMBINED TRAVEL AND SUSTAINABLE DISTRIBUTION PLAN
- GRAVESHAM BOROUGH COUNCIL
- ESSEX POLICE
- STATEMENT OF COMMUNITY ENGAGEMENT
- 2500598FUL TILBURY3 ENVIRONMENTAL PROTECTION OFFICER CONSULTEE COMMENT CLARIFICA
- PART 1 TILBURY3 V.4 FINAL BHSR - ES VOL 2 APPENDIX 17.2.
- PART 2 TILBURY3 V.4 FINAL BHSR-2 - ES VOL 2 APPENDIX 17.2
- PART 3 TILBURY3 V.4 FINAL BHSR-3 - ES VOL 2 APPENDIX 17.2
- PART 4 TILBURY3 V.4 FINAL BHSR-4 - ES VOL 2 APPENDIX 17.
- TILBURY 3 PH COMMENT RESPONSES 25.09.2025
- PUBLIC HEALTH
- SUSTAINABLE TRANSPORT
- NATIONAL HIGHWAYS
- NATIONAL HIGHWAYS
- FLOOD EVACUATION PLAN
- NATIONAL HIGHWAYS 1 OF 2
- NATIONAL HIGHWAYS 1 OF 2
- LOCAL LEAD FLOOD AUTHORITY
- TC HIGHWAYS
- NATURAL ENGLAND
- HISTORIC ENGLAND
- TC PUBLIC HEALTH
- DEVELOPMENT ZONES A AND B
- ESSEX COUNTY COUNCIL
- ESSEX WILDLIFE TRUST
- PORT OF LONDON AUTHORITY
- BUGLIFE
- RSPB
- 2, POST HORN CLOSE
- ANGLIAN WATER
- ENVIRONMENTAL HEALTH
- THAMES ENTERPRISE PARK LAND LIMITED
- ESSEX FIELD CLUB
- ESSEX COUNTY COUNCIL ARCHAEOLOGICAL SECTION.
- GRAVESHAM BOROUGH COUNCIL
- PUBLIC FOOTPATH
- NATURAL ENGLAND
- NATIONAL HIGHWAYS 1 OF 2
- NATIONAL HIGHWAYS 2 OF 2
- ENVIRONMENT AGENCY
- KIMBERLEY SANDHURST ROAD TILBURY ESSEX(FULL)
- EMERGENCY PLANNING
- ESSEX POLICE
- ESSEX POLICE
- ESSEX CO. FIRE/RESCUE CONSULTATION GRAYS.
- NATIONAL GRID
- ARQIVA LTD, BOROUGH HILL, DAVENTRY, NORTHANTS NN11 4NB(FULL)
- ACTIVE TRAVEL ENGLAND
- MARINE MANAGEMENT ORGANISATION, LANCASTER HOUSE, HAMPSHIRE COURT, NEWCASTLE BUSI
- ES VOL 2 - FRONT COVER AND CONTENTS
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART2 OF 19
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART4 OF 19
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART 5 OF 19 (1)
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART6 OF 19
- ES VOL 2 - APPENDIX 10.1 PHASE 1 DESKTOP STUDY AND GROUND CONDITIONS REVIEW PART
- ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS
- ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS
- ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS
- ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART1 OF 19
- ES VOL 2 - APPENDIX 11.1 - FRA PART 1 OF 4 1
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART10 OF 19
- ES VOL 2 - APPENDIX 11.1 - FRA PART 2 OF 4 1
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART11 OF 19
- ES VOL 2 - APPENDIX 11.1 - FRA PART 3 OF 4 1
- ES VOL 2 - APPENDIX 11.1 - FRA PART 4 OF 4 1
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART12 OF 19
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART13 OF 19
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART14 OF 19.
- ES VOL 1 - CHAPTER 3 - EXISTING LAND USERS AND ACTIVITIES
- ES VOL 1 - CHAPTER 2 - EIA METHODOLOGY
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART16 OF 19
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART 7 OF 19
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART 8 OF 19
- ES VOL 1 - CHAPTER 1 - INTRODUCTION
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART 9 OF 19
- ES VOL 2 - APPENDIX 17.2 BUILT HERITAGE STATEMENT PART 1 OF 4
- ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 1 OF 5
- ES VOL 2 - APPENDIX 17.2 BUILT HERITAGE STATEMENT PART 2 OF 4
- ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 2 OF 5 1
- ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 3 OF 5 1
- ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 4 OF 5 1
- ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 5 OF 5
- ES VOL 2 - APPENDIX 12.1 AIR QUALITY LEGISLATION AND GUIDANCE
- ES VOL 2 - APPENDIX 17.2 BUILT HERITAGE STATEMENT PART 3 OF 4
- ES VOL 2 - APPENDIX 12.2 ASSESSMENT METHODOLOGY
- ES VOL 2 - APPENDIX 12.3 AIR QUALITY ASSESSMENT RESULTS
- ES VOL 2 - APPENDIX 13.1 ACOUSTICS GLOSSARY.
- ES VOL 2 - APPENDIX 13.2 NOISE AND VIBRATION PLANNING POLICY AND GUIDANCE
- ES VOL 2 - APPENDIX 13.3 CONSTRUCTION ASSUMPTIONS
- ES VOL 2 - APPENDIX 13.4 OPERATIONAL ROAD TRAFFIC BASIC NOISE LEVELS
- ES VOL 2 - APPENDIX 13.5 CONSTRUCTION ROAD TRAFFIC BASIC NOISE LEVELS.
- PLNG STAT.APPENDIX3_5324-VGPA-TIL3-XX-DR-PL-0006-P02-CONSTRAINTS PLAN-EMERGING L
- ES VOL 2 - APPENDIX 13.6 OPERATION ASSUMPTIONS.
- PLNG STAT.APPENDIX3_5324-VGPA-TIL3-XX-DR-PL-0008-P01-CONSTRAINTS PLAN-INDICATIVE
- ES VOL 2 - APPENDIX 13.7 OPERATIONAL NOISE CONTOURS
- PLNG STAT.APPENDIX 4_DRAFT OF CONDITIONS
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE FIGURE 3 (CONFIDENTIAL)
- PLNG STAT.APPENDIX5_5324-VGPA-TIL3-XX-DR-PL-0009-P01-EMCP DEVELOPMENT ZONES A AN
- ES VOL 1 - CHAPTER 4 - ALTERNATIVES & DESIGN EVOLUTION
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 1 OF 15
- PLNG.STAT.APPENDIX6_TILBURY3 - S106 DRAFT HOTS
- ES VOL 2 - APPENDIX 18.4 OUTLINE CWTP.
- PLANNING STATEMENT APPENDIX 2_TILBURY 3 PLANNING HISTORY TABLE V6
- PLANNING STATEMENT APPENDIX 6_TILBURY3 - S106 DRAFT HOTS
- ES VOL 1 - CHAPTER 5 - THE DEVELOPMENT
- PLNG STAT.APPENDIX 1_5324-VGPA-TIL3-XX-DR-PL-0003-P03-POTLL AND FREEPORT AREA PL
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 2 OF 15
- EQUALITY IMPACT ASSESSMENT
- HEALTH IMPACT ASSESSMENT
- TILBURY3 SEQUENTIAL SITE ASSESSMENT_14.05.25_FV_V2_PART 1
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 3 OF 15
- ECONOMIC IMPACT ASSESSMENT
- ES VOL 1 - CHAPTER 6 - THE WORKS
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 4 OF 15
- TILBURY3_WFD_SCOPING_ISSUE_REV R01
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 5 OF 15
- ES VOL 2 - APPENDIX 17.2 BUILT HERITAGE STATEMENT PART 4 OF 4
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 6 OF 15
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 7 OF 15
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 8 OF 15.
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 9 OF 15
- ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 1 OF 6
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 10 OF 15
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART17 OF 19
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART18 OF 19
- ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 1
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART19 OF 19
- TILBURY3, PORT OF TILBURY I DESIGN AND ACCESS STATEMENT
- ES VOL 2 - APPENDIX 16.1 TILBURY2 CARBON AND ENERGY REPORT
- ES VOL 2 - APPENDIX 17.1 ARCHAEOLOGICAL DESK BASED ASSESSMENT
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 11 OF 15
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 12 OF 15
- ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 5 OF 6
- ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 6 OF 6
- ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 2 OF 8
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 13 OF 15
- ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 3 OF 8
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 14 OF 15
- ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 15 OF 15
- ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS
- ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 4 OF 8
- PAGES FROM TILBURY3 SEQUENTIAL SITE ASSESSMENT_14.05.25_FV_V2_PART 2 APPENDICES
- ES VOL 1 - CHAPTER 8 - SOCIO-ECONOMICS
- ES VOL 3 - NON-TECHNICAL SUMMARY
- ES VOL 1 - CHAPTER 9 - HEALTH
- ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 2 OF 6
- ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 3 OF 6.PDF
- ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 4 OF 6
- ES VOL 1 - CHAPTER 10 - GROUND CONDITIONS AND CONTAMINATION
- ES VOL 1 - CHAPTER 11 - WATER RESOURCES AND FLOOD RISK
- ES VOL 1 - CHAPTER 12 - AIR QUALITY
- ES VOL 1 - CHAPTER 13 - NOISE AND VIBRATION
- ES VOL 1 - CHAPTER 14 - ECOLOGY
- PHASE 1 - HIGHWAY LAYOUT CROSS SECTIONS (ALIGNMENT RD-002) SHEET 2
- ES VOL 1 - CHAPTER 15 - CLIMATE VULNERABILITY
- ES VOL 1 - CHAPTER 16 - CLIMATE CHANGE
- ES VOL 1 - CHAPTER 17 - BUILT HERITAGE AND ARCHAEOLOGY
- TOPOGRAPHICAL SURVEY
- ES VOL 1 - CHAPTER 18 - TRANSPORT AND ACCESS
- ES VOL 1 - CHAPTER 19 - EFFECT INTERACTIONS
- ES VOL 1 - CHAPTER 20 - SCHEDULE OF ENVIRONMENTAL COMMITMENTS
- ES VOL 2 - APPENDIX 2.1 EIA SCOPING REPORT PART 1 OF 3
- ES VOL 2 - APPENDIX 2.1 EIA SCOPING REPORT PART 2 OF 3
- ES VOL 2 - APPENDIX 2.1 EIA SCOPING REPORT PART 3 OF 3
- ES VOL 2 - APPENDIX 2.2 EIA SCOPING OPINION AND CORRESPONDENCE
- ES VOL 2 - APPENDIX 5.1 PRELIMINARY LIGHTING STRATEGY AND IMPACT ASSESSMENT
- ES VOL 2 - APPENDIX 7.1 THURROCK LCA EXTRACT
- ES VOL 2 - APPENDIX 7.2 PHOTOGRAPHIC FIELD SURVEY RECORD
- ES VOL 2 - APPENDIX 8.1 LEGISLATION, POLICY AND GUIDANCE
- ES VOL 2 - APPENDIX 9.1 TILBURY3 HEALTH DATA
- ES VOL 2 - APPENDIX 10.1 PHASE 1 DESKTOP STUDY AND GROUND CONDITIONS REVIEW PART
- ES VOL 2 - APPENDIX 10.1 PHASE 1 DESKTOP STUDY AND GROUND CONDITIONS REVIEW PART
- ES VOL 2 - APPENDIX 10.1 PHASE 1 DESKTOP STUDY AND GROUND CONDITIONS REVIEW PART
- PLANNING STATEMENT
- ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 5 OF 8
- ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 8 OF 8
- ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 7 OF 8
- ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 6 OF 8
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART3 OF 19
- ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART15 OF 19
- APPLICATIONFORMREDACTED
- COVERING LETTER
- THE SITE AND SURROUNDING LAND PARCELS PLAN
- DESIGN PRINCIPLES
- LANDSCAPE STRATEGY PLAN: DJA DRAWING
- SITE SECTIONS PLAN 1&2
- EXTERNAL LIGHTING ISOLUX CONTOR LAYOUT DRAWING AND DESIGN INFORMATION TABLES SHE
- LOCATION PLAN
- LAND USE
- DEVELOPMENT ZONES
- SITE LOCATION PLAN
- ACCESS
- BUILDING HEIGHTS
- DEVELOPMENT INFRASTRUCTURE
- HIGHWAY LAYOUT CROSS SECTIONS SHEET 1
- HIGHWAY LAYOUT LONG SECTIONS SHEET 3
- HIGHWAY LAYOUT LONG SECTIONS SHEET 2
- HIGHWAY LAYOUT CROSS SECTIONS SHEET 4
- HIGHWAY LAYOUT CROSS SECTIONS SHEET 3
- HIGHWAY LAYOUT CROSS SECTIONS SHEET 2
- HIGHWAY LAYOUT LONG SECTIONS SHEET 1
- HIGHWAY LAYOUT ALIGNMENT & CHAINAGE PLAN
- HIGHWAY LAYOUT TYPICAL CROSS SECTION
- HIGHWAY LAYOUT VISIBILITY
- INDICATIVE DRAINAGE STRATEGY
- HIGHWAY LAYOUT SWEPT PATHS
- HIGHWAY LAYOUT GENERAL ENGINEERING SHEET 1
- CUT AND FILL SCENARIO 4
- HIGHWAY LAYOUT GENERAL ENGINEERING SHEET 2
- CONSTRAINTS PLAN
- EXISTING SITE CONTOURS
- LONG SECTIONS SHEET 1&2
- PROPOSED SITE PLAN AND SECTIONS - SHEET 2
- PROPOSED SECTIONS - SHEET 3
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Thurrock for determination, against a statutory target of eight weeks. Over the last year Thurrock decided full applications in a median of 85 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex
Request for Scoping Opinion - Regulation 15 Of The Town And Country Planning (Environmental Impact Assessment) Regulations 2017 (As Amended) at Land At Tilbury3, Port Of Tilbury London Limited (Potll)
Decided Outline 11 docs -
Land To The South Of National Grids Electrical Substation For New Cable Tunnel Fort Road Tilbury Essex
Application for the approval of details reserved by condition no. 16 (Barge Movements) of planning permission ref 25/01480/CV (Application for the variation of condition no. 16 (Barge Movements) of planning permission ref. 25/00746/CV (Application for the variation of condition nos. 16 (Spoil Removal) and 17 (Barge Movements) of planning permission ref. 23/01502/FUL.)
Granted Conditions 4 docs
Other full applications
In Thurrock
-
26/01062/FUL Awaiting decision
Partyman World Unit 9 The Boardwalk Lakeside Shopping Centre West Thurrock Way West Thurrock Essex RM20 2ZN
External Building Alterations Comprising Replacement Windows
-
26/00765/FUL Granted
133 Dock Road Tilbury Essex RM18 7BT
Change of use from a 6 occupant HMO (use class C4) to a House of Multiple Occupancy for 7 occupants (Sui Generis).
-
26/00657/FUL Granted
Bannatyne's Health Club And Spa Howard Road Chafford Hundred Grays Essex RM16 6YJ
Installation of two additional rapid electric vehicle (EV) charging stations, together with associated CCTV infrastructure, reconfiguration of existing kerbing, and the creation of five car parking spaces
-
26/00799/FUL Refused
2 First Avenue West Thurrock Essex RM20 3JR
Demolition of the existing outbuilding(s) and erection of a detached three-bedroom dwelling to the rear of 2 First Avenue, with associated access, landscaping and ancillary works.
-
26/00404/FUL Granted
ISO Tank Oliver Close West Thurrock Essex RM20 3EE
Improved cleaning facilities and water filtration system(s) and minor internal alterations.