Proposal

Hybrid planning application, comprising (1) in the Outline element the following phased development: B2 General Industrial and B8 Storage & Distribution including external storage and ancillary offices, Port-related uses including general haulier parking and a CMAT (Construction Materials and Aggregates Terminal); AND (2) in the Full element the following enabling infrastructure and other works: access and Port estate roads, a rail terminal connecting to the Tilbury2 railway siding, land re-grading and development platforms, utilities, drainage and ecological mitigation.

As published by the council, reference 25/00598/FUL

Application record

Reference
25/00598/FUL
Type
Full Planning Permission Application
Status
Awaiting decision
Received
19 May 2025
Validated
30 May 2025
Ward
OLD Tilbury Riverside And Thurrock Park

Site history

Applications at this address on the Thurrock register

This site has had 2 applications since 2024.

  • 24/01023/SCO Decided

    Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex

    Request for Scoping Opinion - Regulation 15 Of The Town And Country Planning (Environmental Impact Assessment) Regulations 2017 (As Amended) at Land At Tilbury3, Port Of Tilbury London Limited (Potll)

    Decided 5 Nov 2024 Outline

Timeline

Dates from the published record

  1. 19 May 2025

    Received by Thurrock

  2. 30 May 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 25 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Thurrock took a median of 57 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Vincent and Gorbing Limited Agent, registered in Stevenage

Active · incorporated 1985 · Stevenage

60 applications on PlanIndex · across 17 councils · 93% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

245 documents on file for this application

  • RESPONSE TO NON STAT CONSULTEES Studies and Reports · 23 Feb 2026
  • RESPONSE TO NATURAL ENGLAND Studies and Reports · 23 Feb 2026
  • BUGLIFE Consultee Comment · 18 Feb 2026
  • ESSEX FIELD CLUB Consultee Comment · 09 Feb 2026
  • NATIONAL HIGHWAYS Consultee Comment · 22 Jan 2026
  • ADDITIONAL DRAINAGE INFORMATION Studies and Reports · 21 Jan 2026
  • ADDITIONAL DRAINAGE INFORMATION Studies and Reports · 21 Jan 2026
  • ES VOL 2 - APPENDIX 18.3 OUTLINE CTMP - REV D Studies and Reports · 21 Jan 2026
  • ES VOL 2 - APPENDIX 18.2 FRAMEWORK CTSDP - REV D Studies and Reports · 21 Jan 2026
  • ENVIRONMENT AGENCY FEEDBACK RESPONSES Studies and Reports · 21 Jan 2026
  • POSITION STATEMENT WITH APPENDICES Studies and Reports · 21 Jan 2026
  • POSITION STATEMENT WITHOUT APPENDICES Studies and Reports · 21 Jan 2026
  • ES VOL 2 - APPENDIX 18.2 FRAMEWORK CTSDP - REV D - TRACKED Studies and Reports · 21 Jan 2026
  • UPDATED_POTLL RESPONSE TO LLFA - 18TH DEC Studies and Reports · 19 Dec 2025
  • APPENDIX 1 - 03.04.04 SURROUNDING DRAINAGE FEATURES Other · 19 Dec 2025
  • PROPOSED SITE PLAN Current Plan · 17 Dec 2025
  • PORT OF LONDON AUTHORITY Consultee Comment · 01 Dec 2025
  • LOCAL LEAD FLOOD AUTHORITY Consultee Comment · 01 Dec 2025
  • EMERGENCY PLANNING Consultee Comment · 26 Nov 2025
  • NATURAL ENGLAND Consultee Comment · 25 Nov 2025
  • NATIONAL HIGHWAYS CONSULTATION RESPONSE 2 Studies and Reports · 25 Nov 2025
  • LISTED BUILDINGS Consultee Comment · 21 Nov 2025
  • HISTORIC ENGLAND Consultee Comment · 20 Nov 2025
  • ENVIRONMENTAL HEALTH Consultee Comment · 19 Nov 2025
  • NATIONAL HIGHWAYS Consultee Comment · 19 Nov 2025
  • ES VOL 2 11.2 DRAINAGE STRATEGY Studies and Reports · 18 Nov 2025
  • APPLICANT RESPONSE TO LLFA Studies and Reports · 18 Nov 2025
  • WATER FRAMEWORK DIRECTIVE REPORT Studies and Reports · 18 Nov 2025
  • ESSEX COUNTY FIRE AND RESCUE Consultee Comment · 18 Nov 2025
  • ENVIRONMENT AGENCY Consultee Comment · 12 Nov 2025
  • FRAMEWORK COMBINED TRAVEL AND SUSTAINABLE DISTRIBUTION PLAN Studies and Reports · 11 Nov 2025
  • GRAVESHAM BOROUGH COUNCIL Consultee Comment · 10 Nov 2025
  • ESSEX POLICE Consultee Comment · 06 Nov 2025
  • STATEMENT OF COMMUNITY ENGAGEMENT Report · 05 Nov 2025
  • 2500598FUL TILBURY3 ENVIRONMENTAL PROTECTION OFFICER CONSULTEE COMMENT CLARIFICA Studies and Reports · 31 Oct 2025
  • PART 1 TILBURY3 V.4 FINAL BHSR - ES VOL 2 APPENDIX 17.2. Studies and Reports · 31 Oct 2025
  • PART 2 TILBURY3 V.4 FINAL BHSR-2 - ES VOL 2 APPENDIX 17.2 Studies and Reports · 31 Oct 2025
  • PART 3 TILBURY3 V.4 FINAL BHSR-3 - ES VOL 2 APPENDIX 17.2 Studies and Reports · 31 Oct 2025
  • PART 4 TILBURY3 V.4 FINAL BHSR-4 - ES VOL 2 APPENDIX 17. Studies and Reports · 31 Oct 2025
  • TILBURY 3 PH COMMENT RESPONSES 25.09.2025 Studies and Reports · 31 Oct 2025
  • PUBLIC HEALTH Consultee Comment · 30 Oct 2025
  • SUSTAINABLE TRANSPORT Consultee Comment · 29 Oct 2025
  • NATIONAL HIGHWAYS Consultee Comment · 27 Oct 2025
  • NATIONAL HIGHWAYS Consultee Comment · 10 Oct 2025
  • FLOOD EVACUATION PLAN Report · 25 Sep 2025
  • NATIONAL HIGHWAYS 1 OF 2 Consultee Comment · 27 Aug 2025
  • NATIONAL HIGHWAYS 1 OF 2 Consultee Comment · 27 Aug 2025
  • LOCAL LEAD FLOOD AUTHORITY Consultee Comment · 21 Aug 2025
  • TC HIGHWAYS Consultee Comment · 18 Aug 2025
  • NATURAL ENGLAND Consultee Comment · 11 Aug 2025
  • HISTORIC ENGLAND Consultee Comment · 11 Aug 2025
  • TC PUBLIC HEALTH Consultee Comment · 31 Jul 2025
  • DEVELOPMENT ZONES A AND B Current Plan · 17 Jul 2025
  • ESSEX COUNTY COUNCIL Consultee Comment · 16 Jul 2025
  • ESSEX WILDLIFE TRUST Consultee Comment · 07 Jul 2025
  • PORT OF LONDON AUTHORITY Consultee Comment · 04 Jul 2025
  • BUGLIFE Consultee Comment · 03 Jul 2025
  • RSPB Consultee Comment · 02 Jul 2025
  • 2, POST HORN CLOSE Neighbour Comment · 02 Jul 2025
  • ANGLIAN WATER Consultee Comment · 02 Jul 2025
  • ENVIRONMENTAL HEALTH Consultee Comment · 01 Jul 2025
  • THAMES ENTERPRISE PARK LAND LIMITED Neighbour Comment · 30 Jun 2025
  • ESSEX FIELD CLUB Consultee Comment · 30 Jun 2025
  • ESSEX COUNTY COUNCIL ARCHAEOLOGICAL SECTION. Consultee Comment · 27 Jun 2025
  • GRAVESHAM BOROUGH COUNCIL Consultee Comment · 26 Jun 2025
  • PUBLIC FOOTPATH Consultee Comment · 26 Jun 2025
  • NATURAL ENGLAND Consultee Comment · 26 Jun 2025
  • NATIONAL HIGHWAYS 1 OF 2 Consultee Comment · 26 Jun 2025
  • NATIONAL HIGHWAYS 2 OF 2 Consultee Comment · 26 Jun 2025
  • ENVIRONMENT AGENCY Consultee Comment · 25 Jun 2025
  • KIMBERLEY SANDHURST ROAD TILBURY ESSEX(FULL) Neighbour Comment · 24 Jun 2025
  • EMERGENCY PLANNING Consultee Comment · 23 Jun 2025
  • ESSEX POLICE Consultee Comment · 23 Jun 2025
  • ESSEX POLICE Consultee Comment · 23 Jun 2025
  • ESSEX CO. FIRE/RESCUE CONSULTATION GRAYS. Consultee Comment · 17 Jun 2025
  • NATIONAL GRID Consultee Comment · 10 Jun 2025
  • ARQIVA LTD, BOROUGH HILL, DAVENTRY, NORTHANTS NN11 4NB(FULL) Consultee Comment · 09 Jun 2025
  • ACTIVE TRAVEL ENGLAND Consultee Comment · 06 Jun 2025
  • MARINE MANAGEMENT ORGANISATION, LANCASTER HOUSE, HAMPSHIRE COURT, NEWCASTLE BUSI Consultee Comment · 05 Jun 2025
  • ES VOL 2 - FRONT COVER AND CONTENTS Studies and Reports · 03 Jun 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART2 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART4 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART 5 OF 19 (1) Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART6 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 10.1 PHASE 1 DESKTOP STUDY AND GROUND CONDITIONS REVIEW PART Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART1 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 11.1 - FRA PART 1 OF 4 1 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART10 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 11.1 - FRA PART 2 OF 4 1 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART11 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 11.1 - FRA PART 3 OF 4 1 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 11.1 - FRA PART 4 OF 4 1 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART12 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART13 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART14 OF 19. Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 3 - EXISTING LAND USERS AND ACTIVITIES Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 2 - EIA METHODOLOGY Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART16 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART 7 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART 8 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 1 - INTRODUCTION Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART 9 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 17.2 BUILT HERITAGE STATEMENT PART 1 OF 4 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 1 OF 5 Superseded · 22 May 2025
  • ES VOL 2 - APPENDIX 17.2 BUILT HERITAGE STATEMENT PART 2 OF 4 Superseded · 22 May 2025
  • ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 2 OF 5 1 Superseded · 22 May 2025
  • ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 3 OF 5 1 Superseded · 22 May 2025
  • ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 4 OF 5 1 Superseded · 22 May 2025
  • ES VOL 2 - APPENDIX 11.2 - DRAINAGE STRATEGY PART 5 OF 5 Superseded · 22 May 2025
  • ES VOL 2 - APPENDIX 12.1 AIR QUALITY LEGISLATION AND GUIDANCE Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 17.2 BUILT HERITAGE STATEMENT PART 3 OF 4 Superseded · 22 May 2025
  • ES VOL 2 - APPENDIX 12.2 ASSESSMENT METHODOLOGY Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 12.3 AIR QUALITY ASSESSMENT RESULTS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 13.1 ACOUSTICS GLOSSARY. Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 13.2 NOISE AND VIBRATION PLANNING POLICY AND GUIDANCE Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 13.3 CONSTRUCTION ASSUMPTIONS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 13.4 OPERATIONAL ROAD TRAFFIC BASIC NOISE LEVELS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 13.5 CONSTRUCTION ROAD TRAFFIC BASIC NOISE LEVELS. Studies and Reports · 22 May 2025
  • PLNG STAT.APPENDIX3_5324-VGPA-TIL3-XX-DR-PL-0006-P02-CONSTRAINTS PLAN-EMERGING L Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 13.6 OPERATION ASSUMPTIONS. Studies and Reports · 22 May 2025
  • PLNG STAT.APPENDIX3_5324-VGPA-TIL3-XX-DR-PL-0008-P01-CONSTRAINTS PLAN-INDICATIVE Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 13.7 OPERATIONAL NOISE CONTOURS Studies and Reports · 22 May 2025
  • PLNG STAT.APPENDIX 4_DRAFT OF CONDITIONS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE FIGURE 3 (CONFIDENTIAL) Studies and Reports · 22 May 2025
  • PLNG STAT.APPENDIX5_5324-VGPA-TIL3-XX-DR-PL-0009-P01-EMCP DEVELOPMENT ZONES A AN Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 4 - ALTERNATIVES & DESIGN EVOLUTION Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 1 OF 15 Studies and Reports · 22 May 2025
  • PLNG.STAT.APPENDIX6_TILBURY3 - S106 DRAFT HOTS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 18.4 OUTLINE CWTP. Studies and Reports · 22 May 2025
  • PLANNING STATEMENT APPENDIX 2_TILBURY 3 PLANNING HISTORY TABLE V6 Studies and Reports · 22 May 2025
  • PLANNING STATEMENT APPENDIX 6_TILBURY3 - S106 DRAFT HOTS Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 5 - THE DEVELOPMENT Studies and Reports · 22 May 2025
  • PLNG STAT.APPENDIX 1_5324-VGPA-TIL3-XX-DR-PL-0003-P03-POTLL AND FREEPORT AREA PL Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 2 OF 15 Studies and Reports · 22 May 2025
  • EQUALITY IMPACT ASSESSMENT Studies and Reports · 22 May 2025
  • HEALTH IMPACT ASSESSMENT Studies and Reports · 22 May 2025
  • TILBURY3 SEQUENTIAL SITE ASSESSMENT_14.05.25_FV_V2_PART 1 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 3 OF 15 Studies and Reports · 22 May 2025
  • ECONOMIC IMPACT ASSESSMENT Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 6 - THE WORKS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 4 OF 15 Studies and Reports · 22 May 2025
  • TILBURY3_WFD_SCOPING_ISSUE_REV R01 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 5 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 17.2 BUILT HERITAGE STATEMENT PART 4 OF 4 Superseded · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 6 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 7 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 8 OF 15. Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 9 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 1 OF 6 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 10 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART17 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART18 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 1 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART19 OF 19 Studies and Reports · 22 May 2025
  • TILBURY3, PORT OF TILBURY I DESIGN AND ACCESS STATEMENT Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 16.1 TILBURY2 CARBON AND ENERGY REPORT Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 17.1 ARCHAEOLOGICAL DESK BASED ASSESSMENT Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 11 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 12 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 5 OF 6 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 6 OF 6 Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 2 OF 8 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 13 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 3 OF 8 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 14 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.1 ECOLOGY BASELINE REPORT PART 15 OF 15 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.2 - ECOLOGICAL MITIGATION AND COMPENSATION STRATEGY (EMCS Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 4 OF 8 Studies and Reports · 22 May 2025
  • PAGES FROM TILBURY3 SEQUENTIAL SITE ASSESSMENT_14.05.25_FV_V2_PART 2 APPENDICES Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 8 - SOCIO-ECONOMICS Studies and Reports · 22 May 2025
  • ES VOL 3 - NON-TECHNICAL SUMMARY Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 9 - HEALTH Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 2 OF 6 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 3 OF 6.PDF Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 18.1 TRANSPORT ASSESSMENT PART 4 OF 6 Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 10 - GROUND CONDITIONS AND CONTAMINATION Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 11 - WATER RESOURCES AND FLOOD RISK Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 12 - AIR QUALITY Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 13 - NOISE AND VIBRATION Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 14 - ECOLOGY Studies and Reports · 22 May 2025
  • PHASE 1 - HIGHWAY LAYOUT CROSS SECTIONS (ALIGNMENT RD-002) SHEET 2 Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 15 - CLIMATE VULNERABILITY Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 16 - CLIMATE CHANGE Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 17 - BUILT HERITAGE AND ARCHAEOLOGY Studies and Reports · 22 May 2025
  • TOPOGRAPHICAL SURVEY Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 18 - TRANSPORT AND ACCESS Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 19 - EFFECT INTERACTIONS Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 20 - SCHEDULE OF ENVIRONMENTAL COMMITMENTS Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 2.1 EIA SCOPING REPORT PART 1 OF 3 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 2.1 EIA SCOPING REPORT PART 2 OF 3 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 2.1 EIA SCOPING REPORT PART 3 OF 3 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 2.2 EIA SCOPING OPINION AND CORRESPONDENCE Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 5.1 PRELIMINARY LIGHTING STRATEGY AND IMPACT ASSESSMENT Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 7.1 THURROCK LCA EXTRACT Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 7.2 PHOTOGRAPHIC FIELD SURVEY RECORD Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 8.1 LEGISLATION, POLICY AND GUIDANCE Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 9.1 TILBURY3 HEALTH DATA Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 10.1 PHASE 1 DESKTOP STUDY AND GROUND CONDITIONS REVIEW PART Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 10.1 PHASE 1 DESKTOP STUDY AND GROUND CONDITIONS REVIEW PART Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 10.1 PHASE 1 DESKTOP STUDY AND GROUND CONDITIONS REVIEW PART Studies and Reports · 22 May 2025
  • PLANNING STATEMENT Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 5 OF 8 Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 8 OF 8 Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 7 OF 8 Studies and Reports · 22 May 2025
  • ES VOL 1 - CHAPTER 7 - LANDSCAPE AND VISUAL PART 6 OF 8 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART3 OF 19 Studies and Reports · 22 May 2025
  • ES VOL 2 - APPENDIX 14.3 - TILBURY3 SHADOW HRA_PART15 OF 19 Studies and Reports · 22 May 2025
  • APPLICATIONFORMREDACTED Application Form · 19 May 2025
  • COVERING LETTER Cover Letter · 19 May 2025
  • THE SITE AND SURROUNDING LAND PARCELS PLAN Current Plan · 14 May 2025
  • DESIGN PRINCIPLES Studies and Reports · 14 May 2025
  • LANDSCAPE STRATEGY PLAN: DJA DRAWING Current Plan · 06 May 2025
  • SITE SECTIONS PLAN 1&2 Current Plan · 22 Apr 2025
  • EXTERNAL LIGHTING ISOLUX CONTOR LAYOUT DRAWING AND DESIGN INFORMATION TABLES SHE Current Plan · 15 Apr 2025
  • LOCATION PLAN Current Plan · 09 Apr 2025
  • LAND USE Current Plan · 09 Apr 2025
  • DEVELOPMENT ZONES Current Plan · 09 Apr 2025
  • SITE LOCATION PLAN Current Plan · 09 Apr 2025
  • ACCESS Current Plan · 09 Apr 2025
  • BUILDING HEIGHTS Current Plan · 09 Apr 2025
  • DEVELOPMENT INFRASTRUCTURE Current Plan · 09 Apr 2025
  • HIGHWAY LAYOUT CROSS SECTIONS SHEET 1 Current Plan · 12 Mar 2025
  • HIGHWAY LAYOUT LONG SECTIONS SHEET 3 Current Plan · 12 Mar 2025
  • HIGHWAY LAYOUT LONG SECTIONS SHEET 2 Current Plan · 12 Mar 2025
  • HIGHWAY LAYOUT CROSS SECTIONS SHEET 4 Current Plan · 12 Mar 2025
  • HIGHWAY LAYOUT CROSS SECTIONS SHEET 3 Current Plan · 12 Mar 2025
  • HIGHWAY LAYOUT CROSS SECTIONS SHEET 2 Current Plan · 12 Mar 2025
  • HIGHWAY LAYOUT LONG SECTIONS SHEET 1 Current Plan · 12 Mar 2025
  • HIGHWAY LAYOUT ALIGNMENT & CHAINAGE PLAN Current Plan · 12 Mar 2025
  • HIGHWAY LAYOUT TYPICAL CROSS SECTION Current Plan · 10 Mar 2025
  • HIGHWAY LAYOUT VISIBILITY Current Plan · 10 Mar 2025
  • INDICATIVE DRAINAGE STRATEGY Current Plan · 07 Mar 2025
  • HIGHWAY LAYOUT SWEPT PATHS Current Plan · 06 Mar 2025
  • HIGHWAY LAYOUT GENERAL ENGINEERING SHEET 1 Current Plan · 06 Mar 2025
  • CUT AND FILL SCENARIO 4 Current Plan · 04 Mar 2025
  • HIGHWAY LAYOUT GENERAL ENGINEERING SHEET 2 Current Plan · 04 Mar 2025
  • CONSTRAINTS PLAN Current Plan · 05 Feb 2025
  • EXISTING SITE CONTOURS Current Plan · 02 Feb 2025
  • LONG SECTIONS SHEET 1&2 Current Plan · 13 Jan 2025
  • PROPOSED SITE PLAN AND SECTIONS - SHEET 2 Current Plan · 13 Dec 2024
  • PROPOSED SECTIONS - SHEET 3 Current Plan · 13 Dec 2024

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Thurrock for determination, against a statutory target of eight weeks. Over the last year Thurrock decided full applications in a median of 85 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex

    24/01023/SCO Submitted 25 Sep 2024 0m away

    Request for Scoping Opinion - Regulation 15 Of The Town And Country Planning (Environmental Impact Assessment) Regulations 2017 (As Amended) at Land At Tilbury3, Port Of Tilbury London Limited (Potll)

    Decided Outline 11 docs
  • Land To The South Of National Grids Electrical Substation For New Cable Tunnel Fort Road Tilbury Essex

    26/00509/CONDC Submitted 11 May 2026 197m away

    Application for the approval of details reserved by condition no. 16 (Barge Movements) of planning permission ref 25/01480/CV (Application for the variation of condition no. 16 (Barge Movements) of planning permission ref. 25/00746/CV (Application for the variation of condition nos. 16 (Spoil Removal) and 17 (Barge Movements) of planning permission ref. 23/01502/FUL.)

    Granted Conditions 4 docs

In Thurrock

  • 26/01062/FUL Awaiting decision

    Partyman World Unit 9 The Boardwalk Lakeside Shopping Centre West Thurrock Way West Thurrock Essex RM20 2ZN

    External Building Alterations Comprising Replacement Windows

    11 Sep 2026 Full applications
  • 26/00765/FUL Granted

    133 Dock Road Tilbury Essex RM18 7BT

    Change of use from a 6 occupant HMO (use class C4) to a House of Multiple Occupancy for 7 occupants (Sui Generis).

    2 Jul 2026 Full applications
  • 26/00657/FUL Granted

    Bannatyne's Health Club And Spa Howard Road Chafford Hundred Grays Essex RM16 6YJ

    Installation of two additional rapid electric vehicle (EV) charging stations, together with associated CCTV infrastructure, reconfiguration of existing kerbing, and the creation of five car parking spaces

    12 Jun 2026 Full applications
  • 26/00799/FUL Refused

    2 First Avenue West Thurrock Essex RM20 3JR

    Demolition of the existing outbuilding(s) and erection of a detached three-bedroom dwelling to the rear of 2 First Avenue, with associated access, landscaping and ancillary works.

    9 Jul 2026 Full applications
  • 26/00404/FUL Granted

    ISO Tank Oliver Close West Thurrock Essex RM20 3EE

    Improved cleaning facilities and water filtration system(s) and minor internal alterations.

    10 Apr 2026 Full applications