Skip to content
PlanIndex Get alerts
Menu

Planning application

Stroudwater Canal Phase 1B Eastington Gloucestershire

Granted Stroud S.21/1965/TCA Trees in a Conservation Area

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

T1 and T3 - 9x Crack Willow, Fell

As published by the council, reference S.21/1965/TCA

Application record

Reference
S.21/1965/TCA
Type
Trees in a Conservation Area
Status
Application Approved
Decision
Granted As published: Consent
Received
10 Aug 2021
Validated
10 Aug 2021
Decided
13 Sep 2021
Ward
Severn Ward
Parish
Eastington Parish Council
Decision by
Prior Notification / CLDS

Site history

Applications at this address on the Stroud register

This site has had 15 applications since 2021: 14 approved, 0 refused.

  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR.

    Decided 22 Apr 2026 Conditions
  • S.26/0143/VAR Granted

    Stroudwater Canal Phase 1B Eastington Gloucestershire

    Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.

    Decided 15 Jun 2026 Amendments
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 19 (M5 detailed design) for Phase 10 from S.24/2311/VAR.

    Decided 13 May 2026 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).

    Decided 10 Apr 2026 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phases 1c, 3, 4a, 4b, 5, 7, 8 and 12 from S.24/2311/VAR.

    Decided 22 Apr 2026 Conditions
  • S.25/2109/TCA Granted

    Stroudwater Canal Phase 1B Eastington Gloucestershire

    Trees to be felled: T1 - 2 x 15m crack willow & 1 x 12m crack willow - bramble scrub. T2 - 2 x 12m crack willow & bramble scrub. T3 - 3 x 10m & 4 x 8m crack willow & scrub. T4 - 12m crack willow 4 trunks from one base.

    Decided 3 Dec 2025 Trees
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 1a from S.24/2311/VAR.

    Decided 22 Apr 2026 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.

    Decided 1 Jul 2026 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application S.19/0291/FUL.

    Decided 8 Nov 2024 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 11 (ecology mitigation) from S.19/0291/FUL. (Site wide).

    Decided 19 Dec 2024 Conditions

Timeline

Dates from the published record

  1. 10 Aug 2021

    Received by Stroud

  2. 13 Sep 2021

    Decision issued: Consent

  3. 10 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Stroud granted permission on 13 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About tree works applications

Applications for works to trees cover protected trees: consent under a tree preservation order, or six weeks notice for trees in a conservation area. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.25/2109/TCA Submitted 31 Oct 2025 131m away

    Trees to be felled: T1 - 2 x 15m crack willow & 1 x 12m crack willow - bramble scrub. T2 - 2 x 12m crack willow & bramble scrub. T3 - 3 x 10m & 4 x 8m crack willow & scrub. T4 - 12m crack willow 4 trunks from one base.

    Granted Trees 5 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.24/1595/VAR Submitted 27 Aug 2024 215m away

    Removal of Conditions 24 & 25 (TTRO Required) from permitted application S.19/0291/FUL - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manage

    Granted Amendments 10 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.24/1129/DISCON Submitted 19 Jun 2024 220m away

    Discharge of condition 30 (construction management plan) for Phase 2 from S.19/0291/FUL.

    Granted Conditions 6 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.25/2466/DISCON Submitted 15 Dec 2025 224m away

    Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).

    Granted Conditions 9 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.25/0252/DISCON Submitted 10 Feb 2025 224m away

    Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.

    Granted Conditions 8 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.25/2078/DISCON Submitted 24 Oct 2025 224m away

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 1a from S.24/2311/VAR.

    Granted Conditions 4 docs

In Stroud

  • S.26/1656/TCA Awaiting decision

    1 Charfield Road Kingswood Wotton-Under-Edge Gloucestershire GL12 8SL

    SP1 - Scots Pine - Reduce height by approximately 2.5m - 3m & reduce lateral spread by approximately 1.5m to remove obstruction to pavement and road traffic.

    Received 17 Sep, published by the council 18 Sep 2026 Trees
  • S.26/1635/TCA Awaiting decision

    Dunkirk Manor Theescombe Amberley Stroud Gloucestershire GL5 5AU

    T1 Cedar - prune overhang back from neighbouring roof by approx 2 meters. T2 Pine - prune overhang back from neighbouring roof by approx 2 meters.

    Received 15 Sep, published by the council 16 Sep 2026 Trees
  • S.26/1636/TPO Awaiting decision

    Beechgrove Upton Hill Upton St Leonards Gloucester Gloucestershire GL4 8DE

    European Beech tree x 1 - Limb removal and fell.

    Trees
  • S.26/1631/TCA Awaiting decision

    Hillbrook House Watledge Road Nailsworth Stroud Gloucestershire GL6 0AZ

    Copper beech - reduce back by 3m.

    Received 11 Sep, published by the council 15 Sep 2026 Trees
  • S.26/1623/TCA Awaiting decision

    1 Yew Tree Cottages The Lagger Randwick Stroud Gloucestershire GL6 6HP

    Yew tree - Cut back by up to 1.5m. Trim remainder to tidy and contain.

    Received 11 Sep, published by the council 14 Sep 2026 Trees