Proposal

Construction and operation of a 50MW Battery Energy Storage System (BESS) facility including the erection of battery container units, inverters, 132kV substation, 33kV customer switchgear, storage container and welfare container, water tank, new internal access roads, resurfaced compound, installation of perimeter fencing and access gate, associated works; and landscaping.

As published by the council, reference 2025/0361/FUL

Timeline

Dates from the published record

  1. 14 Apr 2025

    Received by Sefton

  2. 29 Apr 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Sefton for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/0361/FUL Awaiting decision

    Land South West Of New Fold Orrell Lancashire

    Construction and operation of a 50MW Battery Energy Storage System (BESS) facility including the erection of battery container units, inverters, 132kV substation, 33kV customer switchgear, storage container and welfare container, water tank, new internal access roads, resurfaced compound, installation of perimeter fencing and access gate, associated works; and landscaping.

    14 Apr 2025 0m away Full applications
  • 2026/0172/LBC Awaiting decision

    Up Holland High School Sandbrook Road Orrell Wigan Lancashire WN5 7AL

    Listed Building Consent - Install an access panel in corridor floor to enable access to service duct to repair a leak to the hot water system

    4 Mar 2026 236m away Heritage and listed buildings
  • 2026/0172/LBC Awaiting decision

    Up Holland High School Sandbrook Road Orrell Wigan Lancashire WN5 7AL

    Listed Building Consent - Install an access panel in corridor floor to enable access to service duct to repair a leak to the hot water system

    4 Mar 2026 236m away Heritage and listed buildings
  • A/26/101038/HH Awaiting decision

    1C Oxhouse Road Orrell Wigan WN5 7AN

    Single storey rear extension together with replacement window to rear following demolition of existing rear extension and wall

    5 Jun 2026 236m away Householder
  • 2021/0583/CON Refused

    Sandcross House Sandcross Close Orrell Lancashire

    Approval of Details Reserved by Condition Nos. 4, 5, 6, 7 and 8 of planning permission 2019/0342/FUL relating to installation of obscure glass to the first floor windows on the east elevation; a scheme for protection of the proposed dwellings and gardens from noise from the railway and road traffic noise; installation of parking spaces prior to first occupation of the dwellings; full details of hard and soft landscaping and a scheme for the provision of an electric vehicle charging point to serve that dwelling.

    5 May 2021 408m away Conditions
  • 2021/0583/CON Refused

    Sandcross House Sandcross Close Orrell Lancashire

    Approval of Details Reserved by Condition Nos. 4, 5, 6, 7 and 8 of planning permission 2019/0342/FUL relating to installation of obscure glass to the first floor windows on the east elevation; a scheme for protection of the proposed dwellings and gardens from noise from the railway and road traffic noise; installation of parking spaces prior to first occupation of the dwellings; full details of hard and soft landscaping and a scheme for the provision of an electric vehicle charging point to serve that dwelling.

    5 May 2021 408m away Conditions

In Sefton

  • 2025/1016/FUL Decided

    Rowan Holmeswood Road Rufford Ormskirk Lancashire L40 1TX

    Planning application for the erection of single storey side, rear extension, rear dormer, and alterations to a bay window.

    28 Nov 2025 Full applications
  • 2026/0438/FUL Granted

    2 Gaw Hill View Aughton Ormskirk Lancashire L39 3QX

    Proposed rear 2 storey extension, single storey side and rear extension

    28 May 2026 Full applications
  • 2026/0248/FUL Withdrawn

    Land North East Of Lees Lane Dalton Lancashire WN8 7RB

    Construction of a general purpose agricultural building (18m x 12m) on farmland using existing access

    26 Mar 2026 Full applications
  • 2026/0419/FUL Granted

    4 Bebles Road Ormskirk Lancashire L39 4SZ

    Proposed conversion of garage into utility and shower room, and formation of passageway to kitchen/ rear lounge including internal and external alterations.

    20 May 2026 Full applications
  • 2026/0410/FUL Granted

    Tunley Brook Barn Mossy Lea Road Wrightington Wigan Lancashire WN6 9RL

    Erection of 2 no. stables, menage and gravel track (retrospective)

    15 May 2026 Full applications