Planning application
Up Holland High School Sandbrook Road Orrell Wigan Lancashire WN5 7AL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Listed Building Consent - Install an access panel in corridor floor to enable access to service duct to repair a leak to the hot water system
As published by the council, reference 2026/0172/LBC
Application record
- Reference
- 2026/0172/LBC
- Type
- Listed Building Consent
- Status
- Registered
- Received
- 4 Mar 2026
- Validated
- 31 Mar 2026
- Ward
- Up Holland Ward
- Parish
- Up Holland
- Postcode
- WN5 7AL
Timeline
Dates from the published record
-
4 Mar 2026
Received by Sefton
-
31 Mar 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Sefton took a median of 62 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Up Holland High School Everyone matters schools Trust Agent
2 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordUp Holland High School John Simpkin Applicant
2 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
- Growth lancashire
- Heritage statement
- Application form - without personal data
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Sefton for determination, against a statutory target of eight weeks. Over the last year Sefton's median decision took 62 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Up Holland High School Sandbrook Road Orrell Wigan Lancashire WN5 7AL
87% historically approved · decision due ~26 May
Listed Building Consent - Install an access panel in corridor floor to enable access to service duct to repair a leak to the hot water system
Awaiting decision Heritage and listed buildings 3 docs -
Up Holland High School Sandbrook Road Orrell Wigan Lancashire WN5 7AL
Lime tree near main entrance to have a 5m crown lift and any dead wood removed.
Granted Trees 2 docs -
1C Oxhouse Road Orrell Wigan WN5 7AN
Single storey rear extension together with replacement window to rear following demolition of existing rear extension and wall
Granted Householder Extension Demolition +1 9 docsSmall domestic -
Sandcross House Sandcross Close Orrell Lancashire
Approval of Details Reserved by Condition Nos. 4, 5, 6, 7 and 8 of planning permission 2019/0342/FUL relating to installation of obscure glass to the first floor windows on the east elevation; a scheme for protection of the proposed dwellings and gardens from noise from the railway and road traffic noise; installation of parking spaces prior to first occupation of the dwellings; full details of hard and soft landscaping and a scheme for the provision of an electric vehicle charging point to serve that dwelling.
Refused Conditions Windows or glazing 2 docsDomestic -
Sandcross House Sandcross Close Orrell Lancashire
Approval of Details Reserved by Condition Nos. 4, 5, 6, 7 and 8 of planning permission 2019/0342/FUL relating to installation of obscure glass to the first floor windows on the east elevation; a scheme for protection of the proposed dwellings and gardens from noise from the railway and road traffic noise; installation of parking spaces prior to first occupation of the dwellings; full details of hard and soft landscaping and a scheme for the provision of an electric vehicle charging point to serve that dwelling.
Refused Conditions Windows or glazing 2 docsDomestic -
Sandcross House Sandcross Close Orrell Lancashire
Variation/Removal of Condition Nos 4;7;2 of Planning Permission 2019/0342/FUL relating to window requirements; parking requirements; building in accordance with approved plans
Granted Full applications Windows or glazing 4 docs
Other heritage and listed building applications
In Sefton
-
2026/0062/LBC Refused
93A - 93F Burscough Street Ormskirk Lancashire L39 2EL
Listed Building Consent -The proposed works involve replacing all external timber doors and windows with like-for-like units, replicating original proportions, detailing, and finishes. Doors will include double-glazed panels and restored ironmongery.
-
2026/0644/LBC Withdrawn
Gatcliffe Farm House 117 Church Road Tarleton Preston Lancashire PR4 6UP
Listed Building Consent - Proposed full house rewire and remedial works to roof, chimneys and external walls.
-
2026/0364/LBC Granted
The Plough And Harrow 174 Ormskirk Road Up Holland Skelmersdale Lancashire WN8 0AA
To replace existing external signs and associated lighting including repainting of the exterior.
-
2026/0459/LBC Granted
Ottershead Farm Barn Dicks Lane Lathom Ormskirk Lancashire L40 6JT
Listed Building Consent - Retention of works including replacement of windows and removal of internal stud walls.
-
2026/0614/LBC Awaiting decision
242 Elmers Green Lane Skelmersdale Lancashire WN8 6SN
Listed Building Consent - Single-storey extension to the rear of Grade II Listed Building following demolition of existing outbuilding / previous extension.