Planning application
25/00628/FUL
Land South Of Salt Way The Saltway Feckenham Worcestershire
Proposal
Battery Energy Storage System with access and associated infrastructure
As published by the council, reference 25/00628/FUL
Timeline
Dates from the published record
-
27 May 2025
Received by Redditch
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Redditch for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/00628/FUL Awaiting decision
Land South Of Salt Way The Saltway Feckenham Worcestershire
Battery Energy Storage System with access and associated infrastructure
-
21/00789/LBC Granted
Oak Tree Barn 1 Shurnock Barns The Saltway Feckenham Redditch Worcestershire B96 6JT
Replacing the door at the top of the external steps on the south elevation.
-
21/00789/LBC Granted
Oak Tree Barn 1 Shurnock Barns The Saltway Feckenham Redditch Worcestershire B96 6JT
Replacing the door at the top of the external steps on the south elevation.
-
26/00383/EOR Awaiting decision
Feckenham Sub Station The Saltway Feckenham Worcestershire B96 6JR
(THIS IS NOT A PLANNING APPLICATION) This is an Environmental Impact Assessment (EIA) Scoping Report on behalf of Arrow Valley Solar Limited for a solar photovoltaic (PV) electricity generating station, and associated development including Battery Energy Storage System (BESS), Ancillary Infrastructure, a Customer Substation and Grid Connection Infrastructure. This is part of the Nationally Significant Infrastructure Project (NSIP). *Please see documents for extent of site*
-
26/00383/EOR Awaiting decision
Feckenham Sub Station The Saltway Feckenham Worcestershire B96 6JR
(THIS IS NOT A PLANNING APPLICATION) This is an Environmental Impact Assessment (EIA) Scoping Report on behalf of Arrow Valley Solar Limited for a solar photovoltaic (PV) electricity generating station, and associated development including Battery Energy Storage System (BESS), Ancillary Infrastructure, a Customer Substation and Grid Connection Infrastructure. This is part of the Nationally Significant Infrastructure Project (NSIP). *Please see documents for extent of site*
Other full applications applications
In Redditch
-
26/00681/FUL Granted
67 Corbett Road Hollywood Worcestershire B47 5LP
Single Storey Front & Side Extension and Two storey Side Extension.
-
26/00639/FUL Granted
Bordesley Hall The Holloway Alvechurch Worcestershire B48 7QA
Erection of a purpose-built bat house to provide ecological mitigation associated with development
-
26/00675/FUL Granted
7 Kerswell Close Redditch Worcestershire B97 6SU
Removal of conservatory and erection of single storey extension; window changes to front elevation
-
26/00529/FUL Granted
15 Mearse Lane Barnt Green Worcestershire B45 8HG
Two storey side/rear extension, demolish garage and storage areas and construct replacement garage
-
26/00888/FUL Granted
3 The Haven Barnt Green Worcestershire B45 8GA
Domestic Extensions to dwelling house and garage