Feckenham Sub Station The Saltway Feckenham Worcestershire B96 6JR

Awaiting decision Redditch 26/01127/NSIP Nat Sig Inf Project

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

(CONSULTATION COMMENTS SHOULD BE MADE DIRECTLY TO ARROW VALLEY SOLAR ON THEIR WEBSITE https://arrowvalleysolar.co.uk/) Pre-application stage (prior to Development Consent Order) consultation relating to Arrow Valley Solar, a proposed solar and energy storage scheme. Further information and consultation materials along with details on how to submit representations are available at: https://arrowvalleysolar.co.uk/ The consultation relates to the construction and operation of an electricity generating station with associated battery energy storage, substations, ancillary infrastructure and grid connection infrastructure connecting into the National Electricity Transmission System (NETS) with the point of connection at the Feckenham 400kV substation

As published by the council, reference 26/01127/NSIP

Application record

Reference
26/01127/NSIP
Type
Nat Sig Inf Project
Status
Pending Consideration
Received
28 Sep 2026
Validated
28 Sep 2026
Ward
Astwood Bank And Feckenham Ward
Parish
Non-Civil Parish Or Community
Postcode
B96 6JR

Site history

Applications at this address on the Redditch register

This site has had 2 applications since 2026.

  • 26/00383/EOR Decided

    Feckenham Sub Station The Saltway Feckenham Worcestershire B96 6JR

    (THIS IS NOT A PLANNING APPLICATION) This is an Environmental Impact Assessment (EIA) Scoping Report on behalf of Arrow Valley Solar Limited for a solar photovoltaic (PV) electricity generating station, and associated development including Battery Energy Storage System (BESS), Ancillary Infrastructure, a Customer Substation and Grid Connection Infrastructure. This is part of the Nationally Significant Infrastructure Project (NSIP). *Please see documents for extent of site*

    Decided 21 Apr 2026 Outline

Timeline

Dates from the published record

  1. 28 Sep 2026

    Received by Redditch

  2. 4 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 23 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Redditch took a median of 58 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Redditch for determination, against a statutory target of eight weeks. Over the last year Redditch's median decision took 58 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Redditch's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Feckenham Sub Station The Saltway Feckenham Worcestershire B96 6JR

    26/00383/EOR Submitted 30 Mar 2026 50 yards away

    (THIS IS NOT A PLANNING APPLICATION) This is an Environmental Impact Assessment (EIA) Scoping Report on behalf of Arrow Valley Solar Limited for a solar photovoltaic (PV) electricity generating station, and associated development including Battery Energy Storage System (BESS), Ancillary Infrastructure, a Customer Substation and Grid Connection Infrastructure. This is part of the Nationally Significant Infrastructure Project (NSIP). *Please see documents for extent of site*

    Decided Outline 22 docs
  • Feckenham Sub Station The Saltway Feckenham Worcestershire B96 6JR

    26/00383/EOR Submitted 30 Mar 2026 50 yards away

    (THIS IS NOT A PLANNING APPLICATION) This is an Environmental Impact Assessment (EIA) Scoping Report on behalf of Arrow Valley Solar Limited for a solar photovoltaic (PV) electricity generating station, and associated development including Battery Energy Storage System (BESS), Ancillary Infrastructure, a Customer Substation and Grid Connection Infrastructure. This is part of the Nationally Significant Infrastructure Project (NSIP). *Please see documents for extent of site*

    Decided Outline 22 docs
  • Land South Of Salt Way The Saltway Feckenham Worcestershire

    25/00628/FUL Submitted 27 May 2025 400 yards away

    94% historically approved · decision due ~22 Jul

    Battery Energy Storage System with access and associated infrastructure

    Awaiting decision Full applications 76 docs
  • Land South Of Salt Way The Saltway Feckenham Worcestershire

    25/00628/FUL Submitted 27 May 2025 400 yards away

    95% historically approved · decision due ~22 Jul

    Battery Energy Storage System with access and associated infrastructure