Applications in IP16
Newest first · page 4 of 7
-
DC/25/4488/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 18(1)(2) (Contaminated Land Mitigation Scheme) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4478/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 28(1)(a) (Construction Traffic Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4474/CON Granted
East Anglia TWO Offshore Wind Farm Suffolk
Consultation - This document consultation consists of the Horizontal Directional Drilling (HDD) Discharge Documents for you to review. The HDD Discharge Documents contain pre-construction plans covering construction works from Mean High Water Springs (MHWS) to the HDD punchout area only.
-
DC/25/4477/CCC Granted
East Anglia ONE North Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 28(1)(a) (Construction Traffic Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4446/DRR28 Granted
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Bespoke Mitigation Plan (Noise and Vibration) Temporary Construction Area (TCA) Works (MDS BMP 7 Rev 4), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/25/4456/FUL Awaiting decision
1 Pilgrims Way Thorpeness Aldringham Cum Thorpe Leiston Suffolk IP16 4LZ
Demolition of rooms to the rear of existing dwelling and construction of 2 storey rear and side extension, front porch and garden shed.
-
DC/25/4447/DRR28 Granted
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Bespoke Mitigation Plan (Noise and Vibration) Main Development Site (MDS) Road Works (MDS BMP 5 Rev 4), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/25/4432/FUL Awaiting decision
Land East Of Sizewell Halt King Georges Avenue Leiston Suffolk
Hybrid planning application comprising: (a) in Full, for a Further Education College and an Apprentice Hub (Use Class F1(a)); and (b) in Outline, with all matters reserved except access, for a Construction Skills Centre and flexible external training space (Use Class F1(a)); together with associated works including access, internal routes, parking, public realm, landscaping, earthworks and other infrastructure.
-
DC/25/4403/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(k) (Watercourse Crossing Method Statement) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4398/DRR Granted
East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(f) (Air Quality Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4410/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 22 (2)(b) Flood Management Plan Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4412/DRR Awaiting decision
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22 (2)(j) (Construction Artificial Light Emissions Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4409/CCC Granted
East Anglia ONE North Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 22 (2)(b) (Flood Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4411/DRR Awaiting decision
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 22 (2)(j) (Construction Artificial Light Emissions Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4404/DRR Granted
East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(k) (Watercourse Crossing Method Statement) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4387/FUL Awaiting decision
Maple Tree Lodge Aldeburgh Road Aldringham Cum Thorpe Leiston Suffolk IP16 4PU
Construction of self contained lodge for letting to Sizewell C workers. This cannot be constructed via an extension to the main building
-
DC/25/4388/DRR Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Requirement 21 (Main Development Site: Sizewell Marshes SSSI Method Statement) of the Sizewell C Development Consent Order
-
DC/25/4399/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(f) (Air Quality Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4373/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 22 (2)(h) (Pollution Prevention and Response Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4359/FUL Granted
Beach View Holiday Park Sizewell Common Leiston Suffolk IP16 4TU
Dual use of land for agricultural use and for the installation of 5 mounted solar panel arrays providing 300 solar panels and kiosk and associated development to generate electricity of Beach View Holiday Park.
-
DC/25/4366/DRR Granted
East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Discharge of Requirement 22 (2)(d) (Site Waste Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4374/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22 (2)(h) (Pollution Prevention and Response Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4326/VOC Refused
Land At Eastlands Industrial Estate Leiston Suffolk IP16 4US
Variation of condition No. 4 of DC/23/4099/FUL - Use of land for B2/B8 use. Provision of hardstanding. Construction of aggregate bays and siting of concrete batching plant. -To increase working hours
-
DC/25/4283/CCC Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
County Council Consultation - Discharge of Requirement 10 project wide: Public Rights Of Way implementation plan for coast path (MBIF) in respect of SZC Co. Sizewell C Nuclear Power Station
-
DC/25/4262/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 13(1) (Landfall Construction Method Statement and Monitoring Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4263/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 13(1) (Landfall Construction Method Statement and Monitoring Plan) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4239/DRC Granted
Leiston And District Constitutional Club Ltd Waterloo Avenue Leiston Suffolk IP16 4HE
Discharge of Condition No 11 of DC/19/2040/FUL - Redevelopment of the site for 15 dwellings comprising of conversion of the club house into 12 apartments and redevelopment of the former bowling green for three bungalows with associated access and landscaping - Landscaping Plan & Cycle Locker Details
-
DC/25/4281/DRR28 Granted
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Bespoke Mitigation Plan (Noise and Vibration) Ancillary Construction Area (ACA) Works (MDS BMP 6 Rev 3), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/25/4267/DRR42 Withdrawn
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Discharge of Requirement 13 (Main development site: Temporary construction-related development) of the Sizewell C Development Consent Order - LEEIE Revised Construction Use
-
DC/25/4216/DRR Granted
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Discharge of Requirement 5 (Project Wide: Surface and Foul Water Drainage) - Various Main Development Site Works, Phase 9
-
DC/25/4209/DRC Granted
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Discharge of Condition No. 5 of DC/24/4158/FUL - Excavation to create five ponds within a basin and creation of an earth bund in connection with natterjack toad habitat enhancement. - WSI submission
-
DC/25/4191/FUL Awaiting decision
Clover Lea Leiston Road Aldeburgh Suffolk IP16 4QW
Conversion of existing buildings to residential, including demolition.
-
DC/25/4121/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm
-
DC/25/4120/CCC Granted
East Anglia ONE North Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm
-
DC/25/4098/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(l) (Sizewell Gap Construction Method Statement) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4101/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 14(1) (Landscape Management Plan) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4097/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(l) (Sizewell Gap Construction Method Statement) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4100/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 14(1) (Landscape Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4046/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(g) (Materials Management Plan) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4045/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(g) (Materials Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4032/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
Consultation by County Council - Discharge of Requirement 28(1)(a) Construction Traffic Management Plan for the Onshore Cable Stage, in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm
-
DC/25/4044/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
Consultation by County Council - Discharge of Requirement 32 Public Rights of Way Strategy for the Onshore Cable Stage, in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm
-
DC/25/4031/CCC Granted
East Anglia ONE North Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 28(1)(a) Construction Traffic Management Plan for the Onshore Cable Duct Installation Stage, in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm
-
DC/25/4043/CCC Granted
East Anglia ONE North Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 32 Public Rights of Way Strategy for the Onshore Cable Duct Installation Stage in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm
-
DC/25/4027/FUL Granted
Laurestina 7 Kitchener Road Leiston Suffolk IP16 4EY
Change of use of existing dwelling to form house in multiple occupation including two storey side extension, amendments to access, external works, and external and internal alterations
-
DC/25/4010/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 16(1) Access Management Plan for the Onshore Cable Stage, in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm
-
DC/25/4007/CCC Granted
East Anglia ONE North Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 22(2)(a) Surface Water Drainage and Management Plan for the Onshore Cable Duct Installation Stage, in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm
-
DC/25/4008/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 22(2)(a) Surface Water Drainage and Management Plan for the Onshore Cable Stage, in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm
-
DC/25/4009/CCC Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 16(1) Access Management Plan for the Onshore Cable Duct Installation Stage, in respect of County Council Consultation - Scottish Power Renewables East Anglia ONE North Offshore Wind Farm
-
DC/25/3935/CCC Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 28(1)(b) Travel Plan for the Onshore Cable Duct Installation Stage, in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm