East Anglia TWO Offshore Wind Farm Suffolk
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
County Council Consultation - Discharge of Requirement 22(2)(a) (Surface Water and Drainage Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
As published by the council, reference DC/25/4619/CCC
Application record
- Reference
- DC/25/4619/CCC
- Type
- Consultation by County Council
- Status
- Awaiting decision
- Received
- 26 Nov 2025
- Validated
- 26 Nov 2025
- Ward
- Aldeburgh And Leiston
- Parish
- Aldringham Cum Thorpe
Site history
Applications at this address on the East Suffolk register
This site has had 39 applications since 2025: 33 approved, 0 refused.
-
DC/26/3000/DRR Awaiting decision
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 40 (Amendments to approved details - Amendment to Approved Landscape Masterplan) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/26/1959/DRR Awaiting decision
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 40 (Amendments to approved details - Use of Tower Cranes during the Construction of Kiln Lane Substation) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/26/1173/CON Granted
East Anglia TWO Offshore Wind Farm Suffolk
Consultation - East Anglia TWO Limited (EATL) and East Anglia ONE North Limited (EAONL) are writing to the MMO to formally respond to a request for further information received on the 9th February 2026 in relation to the EA TWO and EA ONE North HDD Discharge Documents (EA2-LDF-CNS-REP-IBR-000119 and EA1N-LDF-CNS-REP-IBR-000058).
-
DC/25/4701/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 40 (Amendments to Approved Details - Vegetation Clearance) Cable Enabling - Early Substations Stage Works of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4704/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 12 (2) and 27 (2) (Operational Phase Noise Management Plan) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4599/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 17(1) (Fencing and other means of enclosure) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4600/DRR Awaiting decision
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 21 (1) (Ecological Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4592/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22 (Code of Construction Practice) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4578/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(e) (Soils Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4615/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(g) (Materials Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
Timeline
Dates from the published record
-
26 Nov 2025
Received by East Suffolk
-
9 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Suffolk took a median of 54 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided outline applications in a median of 17 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
East Anglia ONE North Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm
Granted Outline 6 docs -
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm
Granted Outline 6 docs -
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(c) (Construction Phase Noise and Vibration Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 6 docs -
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Outline 7 docs -
East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
99% historically approved · decision due ~6 Feb
Discharge of Requirement 12 (1) to (16) (Detailed Design) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
Awaiting decision Conditions 10 docs -
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 14(1) (Landscape Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 7 docs
Other outline applications
In East Suffolk
-
DC/26/2769/EIA Decided
Land Off Ringsfield Road Beccles Suffolk
EIA Screening Opinion - Residential development of up to 270 dwellings, together with public open space, suitable alternative natural greenspace (SANG) and associated infrastructure.
-
DC/26/2834/CON Granted
Land To South Of Railway Line Westerfield Road Ipswich Suffolk
Consultation - Part discharge of condition 28 of outline planning permission IP/14/00638/OUTFL in relation to the Community Development Strategy and the full details of projects and measures for the pre-occupancy and early occupancy phase.
-
DC/26/3025/CON Awaiting decision
The Crown Hotel Market Hill Framlingham Woodbridge Suffolk IP13 9AP
Consultation - Renewal of pavement licence for 4 tables each with 3 chairs at the front of the premises, covering an area of left of the door (when facing premises) 11m in length & 1.5m wide and right of the door 8m in length & 1.5m wide. Between the hours of 07:30-23:00 Monday to Saturday and 8:00 to 18:00 Sunday.
-
DC/26/3031/CON Awaiting decision
79 Hamilton Road Felixstowe Suffolk IP11 7BE
Consultation - Renewal of pavement licence: 6 tables and 12 chairs Area in front of premises - 6m x 3.4m Tables 1 to 4 (located on pavement) - Monday to Sunday 08:00 to 16:00 Tables 5 and 6 (located on Hamilton Road) - Monday to Sunday 10:00 to 16:00
-
DC/26/2758/CON Granted
Garland Park Garland Park Avenue Rendlesham Woodbridge Suffolk
Consultation - Variation to Advanced Water Infrastructure Networks Limited, to allow it to supply Water and Sewerage services to a site called Garland Park, Woodbridge.