Planning application

East Anglia ONE North Offshore Wind Farm Suffolk

Awaiting decision East Suffolk DC/25/4487/DRR Discharge of Requirements (56 days)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Requirement 18(1)(2) (Contaminated Land Mitigation Scheme) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

As published by the council, reference DC/25/4487/DRR

Application record

Reference
DC/25/4487/DRR
Type
Discharge of Requirements (56 days)
Status
Awaiting decision
Received
20 Nov 2025
Validated
20 Nov 2025
Ward
Woodbridge
Parish
Woodbridge

Site history

Applications at this address on the East Suffolk register

This site has had 44 applications since 2025: 39 approved, 0 refused.

  • DC/26/2999/DRR Awaiting decision

    East Anglia ONE North Offshore Wind Farm Suffolk

    Discharge of Requirement 40 (Amendments to approved details - Amendment to Approved Landscape Masterplan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Submitted 24 Aug 2026 Conditions
  • DC/26/2306/CON Granted

    East Anglia ONE North Offshore Wind Farm Suffolk

    Consultation - Pre-construction Monitoring Plan for East Anglia One North

    Decided 9 Jul 2026 Outline
  • DC/26/1958/DRR Granted

    East Anglia ONE North Offshore Wind Farm Suffolk

    Discharge of Requirement 40 (Amendments to approved details - Use of Tower Cranes during the Construction of Kiln Lane Substation) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 29 Jul 2026 Conditions
  • DC/26/1172/CON Granted

    East Anglia ONE North Offshore Wind Farm Suffolk

    Consultation - East Anglia TWO Limited (EATL) and East Anglia ONE North Limited (EAONL) are writing to the MMO to formally respond to a request for further information received on the 9th February 2026 in relation to the EA TWO and EA ONE North HDD Discharge Documents (EA2-LDF-CNS-REP-IBR-000119 and EA1N-LDF-CNS-REP-IBR-000058).

    Decided 13 Apr 2026 Outline
  • DC/25/4823/CCC Granted

    East Anglia ONE North Offshore Wind Farm Suffolk

    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 11 Feb 2026 Outline
  • DC/25/4823/DRR Awaiting decision

    East Anglia ONE North Offshore Wind Farm Suffolk

    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Submitted 12 Dec 2025 Outline
  • DC/25/4822/DRR Granted

    East Anglia ONE North Offshore Wind Farm Suffolk

    Discharge of Requirement 12 (1) to (16) (Detailed Design Report) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 20 Feb 2026 Conditions
  • DC/25/4821/DRR Granted

    East Anglia ONE North Offshore Wind Farm Suffolk

    Discharge of Requirement 14(1) (Landscape Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 18 Feb 2026 Conditions
  • DC/25/4700/DRR Granted

    East Anglia ONE North Offshore Wind Farm Suffolk

    Discharge of Requirement 40 (Amendments to Approved Details - Vegetation Clearance) Cable Enabling Works - Early Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 8 Jan 2026 Conditions
  • DC/25/4703/DRR Granted

    East Anglia ONE North Offshore Wind Farm Suffolk

    Discharge of Requirement 12 (2) and 27 (2) (Operational Phase Noise Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Decided 11 Feb 2026 Conditions

Timeline

Dates from the published record

  1. 20 Nov 2025

    Received by East Suffolk

  2. 9 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 15 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 54 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided condition discharge and variation applications in a median of 51 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4120/CCC Submitted 24 Oct 2025 0m away

    County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm

    Granted Outline 6 docs
  • East Anglia TWO Offshore Wind Farm Suffolk

    DC/25/4121/CCC Submitted 24 Oct 2025 0m away

    County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm

    Granted Outline 6 docs
  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4515/DRR Submitted 21 Nov 2025 0m away

    Discharge of Requirement 22(2)(c) (Construction Phase Noise and Vibration Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Granted Conditions 6 docs
  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4823/CCC Submitted 12 Dec 2025 0m away

    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Granted Outline 7 docs
  • East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    DC/25/4827/DRR Submitted 12 Dec 2025 0m away

    99% historically approved · decision due ~6 Feb

    Discharge of Requirement 12 (1) to (16) (Detailed Design) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Awaiting decision Conditions 10 docs
  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4100/DRR Submitted 22 Oct 2025 0m away

    Discharge of Requirement 14(1) (Landscape Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Granted Conditions 7 docs

In East Suffolk

  • DC/26/2035/DRC Split decision

    The Old Rectory The Street South Elmham St Margaret Harleston Suffolk IP20 0PJ

    Discharge of Condition Nos. 4, 5, 6, 7, 10, 11, 12, 13, 14, 16, 17, 18, 19, 20, 21, 22, 23, 24, 27, 28 and 30 of DC/24/4379/LBC - Listed Building Consent - Partial Demolition, extension and internal reordering, plus conversion and repair of outbuildings - Supporting Statement and Drawings submitted

    2 Jun 2026 Conditions
  • DC/26/2017/DRC Granted

    Hand Car Wash Montrose Service Garage London Road Beccles Suffolk NR34 9YU

    Discharge of Condition No. 3 of DC/25/3495/FUL - Erection of a two-storey, 66-bed care home for the elderly with associated access, parking, landscaping, and ancillary buildings, following the demolition of existing garages and associated structures - Fuel Tank and Canopy Removal

    1 Jun 2026 Conditions
  • DC/26/3060/DRC Awaiting decision

    25 Cotmer Road Lowestoft Suffolk NR33 9PN

    Discharge of Condition No. 14 of DC/24/1151/FUL - Sub division of gardens to create 2 plots and construction of 2 detached bungalows with integral garages - Water Calculations

    28 Aug 2026 Conditions
  • DC/26/2904/DRC Granted

    North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY

    Discharge of Condition No. 3 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south - Demolition and Construction Management Strategy

    14 Aug 2026 Conditions
  • DC/26/3028/DRR42 Awaiting decision

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Development Consent Order Requirement 9 - Main Development Site: Site Clearance of the Sizewell C Development Consent Order

    26 Aug 2026 Conditions