Planning application
Binn Farm Glenfarg
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Proposed solar development incorporating installation of solar panels and associated infrastructure with a generating capacity of more than 20megawatts (MW) but less than 50MW
As published by the council, reference 21/00857/SCRN
Application record
- Reference
- 21/00857/SCRN
- Type
- Screening Opinion
- Status
- Decided
- Decision
- closed
- Received
- 17 May 2021
- Validated
- 17 May 2021
- Decided
- 1 Jul 2021
- Ward
- Almond And Earn
- Parish
- Abernethy
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
17 May 2021
Received by Perth and Kinross
-
1 Jul 2021
Decision issued: closed
-
16 Sep 2026
Added to PlanIndex
After the decision
Perth and Kinross has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Binn Eco Park Wind Farm Glenfarg
Formation of a 10MW energy storage facility comprising 8 battery storage containers, control building, ancillary equipment and associated works
Granted Full applications 29 docs -
Binn Eco Park Wind Farm Glenfarg
Formation of two landscape bunds and associated access track
Refused Full applications 33 docs -
-
Binn Skips Binn Farm Glenfarg Perth PH2 9PX
Installation of 990KW biomass boiler and flue (in retrospect)
Granted Full applications 21 docs -
Binn Skips Binn Farm Glenfarg Perth PH2 9PX
Erection of replacement storage shed
Granted Full applications 11 docsSmall domestic -
Land 200 Metres South East Of Orchard Bungalow Binn Farm Glenfarg
Erection of a hydrogen production facility comprising water storage and purification, electrolysers, compressors, substation, truck filling bays, maintenance building, access, lighting, CCTV, perimeter fencing and associated ancillary works
Granted Full applications 67 docs
Other outline applications
In Perth and Kinross
-
26/00832/IPL Granted
Land 50 Metres North Of Rowanbank Newfargie Glenfarg Perth PH2 9QT
Erection of dwellinghouse (in principle)
-
26/00684/IPL Granted
Land 25 Metres South Of Davaar Main Street Glenfarg Perth PH2 9NY
Erection of dwellinghouse (in principle)
-
26/00053/IPL Refused
Land 40 Metres West Of Levenmouth Farmhouse Scotlandwell
Residential development (in principle)
-
26/01269/IPL Awaiting decision
Monzievaird And Strowan Hall Monzievaird Crieff
Erection of dwellinghouse (in principle)
-
26/01230/SCOP Decided
Land 120 Metres South East Of Wardheads Farm Errol Perth PH2 7SW
The construction and operation of up to 500MW ground-mounted solar PV farm together with up to 100MW co-located BESS and associated infrastructure including inverter/transformer stations, substations (including Site substation and Transmission Operator Grid substation), underground cabling, access tracks, temporary construction compounds, security fencing, CCTV, landscaping, and biodiversity enhancements