Planning application
Perth Leisure Pool Glasgow Road Perth PH2 0HZ
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Residential development comprising flatted blocks, installation of SUDS, landscaping and associated works (in principle)
As published by the council, reference 26/00449/IPM
Application record
- Reference
- 26/00449/IPM
- Type
- planning permission in principle major
- Status
- Awaiting decision
- Received
- 31 Mar 2026
- Validated
- 9 Jun 2026
- Ward
- Perth City South
- Parish
- City South
- Postcode
- PH2 0HZ
Site history
Applications at this address on the Perth and Kinross register
This site has had 3 applications since 2025.
-
26/00215/SCRN Decided
Perth Leisure Pool Glasgow Road Perth PH2 0HZ
Residential development
-
25/00016/PAN Decided
Perth Leisure Pool Glasgow Road Perth PH2 0HZ
Residential development comprising 6 blocks of flats, installation of SUDS, landscaping and associated works
Timeline
Dates from the published record
-
31 Mar 2026
Received by Perth and Kinross
-
9 Jun 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 September 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
Perth and Kinross took a median of 59 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
129 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Perth and Kinross for determination, against a statutory target of thirteen weeks. Over the last year Perth and Kinross decided outline applications in a median of 61 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Perth Leisure Pool Glasgow Road Perth PH2 0HZ
Residential development comprising 6 blocks of flats, installation of SUDS, landscaping and associated works
Decided New dwelling 2 docs -
Perth Leisure Pool Glasgow Road Perth PH2 0HZ
Residential development
Decided Outline New dwelling 3 docs -
Dewar's Centre Glover Street Perth PH2 0TH
Installation of a dehumidification system boiler flue and associated works
Withdrawn Full applications 14 docs -
Play Area Perth Leisure Pool Glover Street Perth
92% historically approved · decision due ~28 Aug
Erection of residential care home, community hub, staff facilities, associated parking and landscaped areas
Awaiting decision Full applications 108 docsMajor scheme -
Play Area Perth Leisure Pool Glover Street Perth
Erection of residential care facility, community hub, staff facilities and associated works
Decided 3 docs -
10 - 16 York Place Ground Floor Perth PH2 8EP
Change of use and alterations to retail unit (Class 1) to form office (class 4) and storage/distribution unit (class 6)
Granted Full applications 15 docs
Other outline applications
In Perth and Kinross
-
26/00684/IPL Granted
Land 25 Metres South Of Davaar Main Street Glenfarg Perth PH2 9NY
Erection of dwellinghouse (in principle)
-
26/00053/IPL Refused
Land 40 Metres West Of Levenmouth Farmhouse Scotlandwell
Residential development (in principle)
-
26/01269/IPL Awaiting decision
Monzievaird And Strowan Hall Monzievaird Crieff
Erection of a dwellinghouse (in principle)
-
26/01230/SCOP Decided
Land 120 Metres South East Of Wardheads Farm Errol Perth PH2 7SW
The construction and operation of up to 500MW ground-mounted solar PV farm together with up to 100MW co-located BESS and associated infrastructure including inverter/transformer stations, substations (including Site substation and Transmission Operator Grid substation), underground cabling, access tracks, temporary construction compounds, security fencing, CCTV, landscaping, and biodiversity enhancements
-
26/00755/IPL Granted
Hamilton Bank Craigie Road Perth PH2 0BQ
Erection of a dwellinghouse (in principle)