Planning application
Binn Eco Park Wind Farm Glenfarg
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Formation of two landscape bunds and associated access track
As published by the council, reference 21/00550/FLL
Application record
- Reference
- 21/00550/FLL
- Type
- planning permission local
- Status
- Refused
- Decision
- Refused As published: refuse the application
- Received
- 1 Apr 2021
- Validated
- 28 Apr 2021
- Decided
- 14 Jul 2021
- Ward
- Almond And Earn
- Parish
- Abernethy
- Decision by
- Delegated Decision
Site history
Applications at this address on the Perth and Kinross register
This site has had 2 applications since 2021: 1 approved, 1 refused.
-
21/00834/FLL Granted
Binn Eco Park Wind Farm Glenfarg
Formation of a 10MW energy storage facility comprising 8 battery storage containers, control building, ancillary equipment and associated works
Timeline
Dates from the published record
-
1 Apr 2021
Received by Perth and Kinross
-
28 Apr 2021
Validated
Checked as complete and ready for consideration.
-
14 Jul 2021
Decision issued: refuse the application
-
16 Sep 2026
Added to PlanIndex
Documents
33 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this refusal means
Perth and Kinross refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Binn Skips Binn Farm Glenfarg Perth PH2 9PX
Installation of 990KW biomass boiler and flue (in retrospect)
Granted Full applications 21 docs -
Binn Eco Park Wind Farm Glenfarg
Formation of a 10MW energy storage facility comprising 8 battery storage containers, control building, ancillary equipment and associated works
Granted Full applications 29 docs -
-
Binn Farm Glenfarg
Proposed solar development incorporating installation of solar panels and associated infrastructure with a generating capacity of more than 20megawatts (MW) but less than 50MW
Decided Outline -
Land 115 Metres West Of Catochil Farm Strathmiglo Perth PH2 9PX
92% historically approved · decision due ~25 Nov
Installation of underground cabling and associated works
Awaiting decision Full applications 18 docs -
Land 150 Metres North East Of Binn Hill Transmitting Station Glenfarg
Installation of photovoltaic solar farm and ancillary works
Granted Full applications 44 docs
Other full applications
In Perth and Kinross
-
26/00875/FLL Granted
Long Distance Path From Comrie To Crieff Comrie
Formation of multi-use path, alterations to bridges and associated works
-
26/00270/FLL Withdrawn
Land 30 Metres West Of Exton House Inchture
Erection of dwellinghouse
-
26/01432/FLL Granted
Apafc Pavilion Public Park Western Road Auchterarder PH3 1JH
Installation of 2 shipping containers for storage (in part retrospect)
-
26/00998/FLL Granted
Lyon Cottage Strathtay Pitlochry PH9 0PG
Alterations and extensions to dwellinghouse and formation of dormer window
-
26/01631/FLL Awaiting decision
Old Bank Court Lower Granco Street Dunning Perth PH2 0SQ
Installation of solar panels