Planning application
Binn Farm Glenfarg Perth PH2 9PX
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Formation of an eco park
As published by the council, reference 09/00008/PAN
Application record
- Reference
- 09/00008/PAN
- Type
- Proposal of Application Notice
- Status
- Withdrawn
- Decision
- Withdrawn
- Received
- 21 Sep 2009
- Validated
- 21 Dec 2009
- Decided
- 21 Dec 2009
- Ward
- Almond And Earn
- Parish
- Abernethy
- Decision by
- Delegated Decision
- Postcode
- PH2 9PX
Timeline
Dates from the published record
-
21 Sep 2009
Received by Perth and Kinross
-
21 Dec 2009
Validated
Checked as complete and ready for consideration.
-
21 Dec 2009
Decision issued: Withdrawn
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Perth and Kinross decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Perth and Kinross's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Binn Skips Binn Farm Glenfarg Perth PH2 9PX
Installation of 990KW biomass boiler and flue (in retrospect)
Granted Full applications 21 docs -
Binn Eco Park Wind Farm Glenfarg
Formation of a 10MW energy storage facility comprising 8 battery storage containers, control building, ancillary equipment and associated works
Granted Full applications 29 docs -
Binn Eco Park Wind Farm Glenfarg
Formation of two landscape bunds and associated access track
Refused Full applications 33 docs -
Binn Farm Glenfarg
Proposed solar development incorporating installation of solar panels and associated infrastructure with a generating capacity of more than 20megawatts (MW) but less than 50MW
Decided Outline -
Land 150 Metres North East Of Binn Hill Transmitting Station Glenfarg
Installation of photovoltaic solar farm and ancillary works
Granted Full applications 44 docs -
Binn Skips Binn Farm Glenfarg Perth PH2 9PX
Erection of replacement storage shed
Granted Full applications 11 docsSmall domestic