Skip to content
PlanIndex Get alerts
Menu

Planning application

Barrow Hill Railway Centre Campbell Drive Barrow Hill Chesterfield Derbyshire S43 2PR

Awaiting decision North East Derbyshire CHE/26/00749/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Alterations to roofing and walling, with repairs to surface water drainage system

As published by the council, reference CHE/26/00749/FUL

Application record

Reference
CHE/26/00749/FUL
Type
Full Application
Status
Awaiting decision
Received
24 Aug 2026
Validated
26 Aug 2026
Ward
Staveley North
Parish
Staveley Town Council
Postcode
S43 2PR

Timeline

Dates from the published record

  1. 24 Aug 2026

    Received by North East Derbyshire

  2. 26 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    North East Derbyshire took a median of 62 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with North East Derbyshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In North East Derbyshire

  • CHE/26/00522/FUL Withdrawn

    468 Sheffield Road Whittington Moor Chesterfield Derbyshire S41 8LP

    Change of use of existing car sales pitch to car wash with new metal frame, fabric canopy

    1 Jul 2026 Full applications
  • 15 High Street Brimington Chesterfield Derbyshire S43 1DE

    Retrospective application for wooden shelter

    22 May 2026 Full applications
  • CHE/26/00769/FUL Awaiting decision

    Cannon Mill Dock Walk Chesterfield Derbyshire S40 2AB

    Change of use to office accommodation, external alterations and associated works

    1 Sep 2026 Full applications
  • 4 Station Road Barrow Hill Chesterfield Derbyshire S43 2NL

    Erection of a rear dormer roof and further works to the rear, to facilitate change of use to form a separate ground floor shop and 2 upper floor flats

    17 Oct 2025 Full applications
  • 16 The Green Hasland Chesterfield Derbyshire S41 0LJ

    Change of use from a dwelling to a massage/wellness therapy service/business (Use Class E)

    6 Jul 2026 Full applications