Planning application

Former Coal Terminal Hunterston West Kilbride Ayrshire

Granted North Ayrshire 22/00712/MSCM Matters Specified in Conditions (Major)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Submission of details pertaining to pre-commencement conditions relating to erection of a high voltage cable manufacturing facility

As published by the council, reference 22/00712/MSCM

Application record

Reference
22/00712/MSCM
Type
Matters Specified in Conditions (Major)
Status
Approved subject to Conditions
Decision
Granted As published: Approved subject to Conditions
Received
20 Sep 2022
Validated
25 Oct 2022
Decided
24 May 2023
Ward
North Coast
Parish
Fairlie Community Council
Decision by
Committee

Site history

Applications at this address on the North Ayrshire register

This site has had 7 applications since 2021: 5 approved, 0 refused.

  • 23/00744/PP Granted

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Development and operation of a grid stability facility

    Decided 4 Dec 2023 Full applications
  • 23/00131/PP Granted

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Variation of condition 11 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Decided 24 May 2023 Full applications
  • 23/00070/PP Granted

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Variation of conditions 9 and 18 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Decided 23 Mar 2023 Full applications
  • 22/00759/PP Withdrawn

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Variation of conditions 11 and 12 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Decided 22 Feb 2023 Full applications
  • 22/00133/PPPM Granted

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Planning permission in principle for the erection of a high voltage cable manufacturing facility, including detailed planning permission for the construction of a 185m high extrusion tower with associated factories, research and testing laboratories, offices with associated stores, transport, access, parking and landscaping with on-site generation and electrical infrastructure and cable delivery system

    Decided 29 Jun 2022 Outline
  • 21/00480/EIA Decided

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    EIA screening request for proposed synchronous compensator

    Decided 1 Jun 2021 Outline

Timeline

Dates from the published record

  1. 20 Sep 2022

    Received by North Ayrshire

  2. 25 Oct 2022

    Validated

    Checked as complete and ready for consideration.

  3. 24 May 2023

    Decision issued: Approved subject to Conditions

  4. 25 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

RPS Group Fao Jim Bailey Agent

4 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

173 documents on file for this application

  • Decision notice Decision · 09 Jun 2023
  • Surface water drainage sheet 7 Approved Drawing · 09 May 2023
  • Surface water drainage sheet 4 Approved Drawing · 09 May 2023
  • Surface water drainage sheet 1 Approved Drawing · 09 May 2023
  • Revised environmental health response Consultation Response · 14 Apr 2023
  • Drainage strategy report Report · 03 Apr 2023
  • Acoustic assessment Report · 03 Apr 2023
  • Cable pathway - typical details Approved Drawing · 21 Mar 2023
  • Cable pathway - key plan Approved Drawing · 21 Mar 2023
  • Hunterston quay layout - no vessel Approved Drawing · 21 Mar 2023
  • Grosvenor consultancy for fairlie cc Consultation Response · 10 Feb 2023
  • Additional fairlie cc response Other · 03 Feb 2023
  • Further cumbrae cc response Consultation Response · 29 Jan 2023
  • Environmental health response Consultation Response · 10 Jan 2023
  • Tr/npa/2 Consultation Response · 04 Jan 2023
  • Fairlie cc response Consultation Response · 04 Jan 2023
  • Network rail response Consultation Response · 22 Dec 2022
  • Traffic management plan Report · 15 Dec 2022
  • Comments Objection Comment · 01 Dec 2022
  • Transport scotland response Consultation Response · 29 Nov 2022
  • Flooding response Consultation Response · 29 Nov 2022
  • Comments Objection Comment · 28 Nov 2022
  • Comments Objection Comment · 23 Nov 2022
  • Cumbrae cc response Consultation Response · 21 Nov 2022
  • Trnpa1 Other · 14 Nov 2022
  • Roads response Consultation Response · 01 Nov 2022
  • Trnpa1 BackGround Papers · 25 Oct 2022
  • Noise report Report · 13 Oct 2022
  • Masterplan Approved Drawing · 10 Oct 2022
  • Masterplan location plan Approved Drawing · 10 Oct 2022
  • Overview of possible renewable energy sources for xlcc hunterston Report · 10 Oct 2022
  • Condition 3 Report · 22 Sep 2022
  • Illustrative masterplan Approved Drawing · 22 Sep 2022
  • Master plan manufacturing process Approved Drawing · 22 Sep 2022
  • Master plan servicing strategy Approved Drawing · 22 Sep 2022
  • Master plan staff access strategy Approved Drawing · 22 Sep 2022
  • Master plan emergency access strategy Approved Drawing · 22 Sep 2022
  • Master plan outline security strategy Approved Drawing · 22 Sep 2022
  • Master plan waste management Approved Drawing · 22 Sep 2022
  • External lighting layout indicative sheet 2 of 2 Approved Drawing · 22 Sep 2022
  • External lighting layout indicative sheet 1 of 2 Approved Drawing · 22 Sep 2022
  • Stage 3 comprehensive landscape masterplan Approved Drawing · 22 Sep 2022
  • Stage 3 soft landscape proposals sheet 01 Approved Drawing · 22 Sep 2022
  • Stage 3 soft landscape proposals sheet 02 Approved Drawing · 22 Sep 2022
  • Stage 3 soft landscape proposals sheet 03 Approved Drawing · 22 Sep 2022
  • Stage 3 soft landscape proposals sheet 04 Approved Drawing · 22 Sep 2022
  • Stage 3 soft landscape proposals sheet 05 Approved Drawing · 22 Sep 2022
  • Stage 3 soft landscape proposals sheet 06 Approved Drawing · 22 Sep 2022
  • Typical tree pit details Approved Drawing · 22 Sep 2022
  • Stage 3 schedule of soft landscape components Report · 22 Sep 2022
  • Plan-ga-00(ground) - main factory - full building. Approved Drawing · 22 Sep 2022
  • Proposed elevations - main factory Approved Drawing · 22 Sep 2022
  • Elevations as proposed (tower) - main factory Approved Drawing · 22 Sep 2022
  • Proposed elevations (tower) Approved Drawing · 22 Sep 2022
  • Level b1 ga plan (tower) Approved Drawing · 22 Sep 2022
  • Level 26 ga plan (tower) Approved Drawing · 22 Sep 2022
  • Level 22 ga plan (tower) Approved Drawing · 22 Sep 2022
  • Level 21 ga plan (tower) Approved Drawing · 22 Sep 2022
  • Level 00 ga plan (tower) Approved Drawing · 22 Sep 2022
  • Full building proposed elevations (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed south & west elevations (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed north & east elevations (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Full building ga plans (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - roof (c4) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - mezzanine (c4) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - ground floor (c4) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - roof (c3) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - mezzanine (c3) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - ground floor (c3) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - roof (c2 (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - mezzanine (c2) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - ground floor (c2) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - roof (c1) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - mezzanine (c1) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Proposed ga plan - ground floor (c1) (conductor manufacture) Approved Drawing · 22 Sep 2022
  • Canteen proposed elevations Approved Drawing · 22 Sep 2022
  • Canteen proposed floor plan Approved Drawing · 22 Sep 2022
  • Cable rewinding ground floor plan Approved Drawing · 22 Sep 2022
  • Cable rewinding elevations Approved Drawing · 22 Sep 2022
  • Pq testing elevations Approved Drawing · 22 Sep 2022
  • Pq testing floor plans Approved Drawing · 22 Sep 2022
  • Full building ga plans (factory joints) Approved Drawing · 22 Sep 2022
  • Full building proposed elevations (factory joints) Approved Drawing · 22 Sep 2022
  • General arrangement - gatehouse (office) Approved Drawing · 22 Sep 2022
  • Elevations (office) Approved Drawing · 22 Sep 2022
  • Proposed plans (office) Approved Drawing · 22 Sep 2022
  • Proposed ground floor plan (utilities) Approved Drawing · 22 Sep 2022
  • Proposed elevations (utilities) Approved Drawing · 22 Sep 2022
  • Kerbing, signs and lines sheet 9 Approved Drawing · 22 Sep 2022
  • Kerbing, signs and lines sheet 8 Approved Drawing · 22 Sep 2022
  • Kerbing, signs and lines sheet 7 Approved Drawing · 22 Sep 2022
  • Kerbing, signs and lines sheet 6 Approved Drawing · 22 Sep 2022
  • Kerbing, signs and lines sheet 5 Approved Drawing · 22 Sep 2022
  • Kerbing, signs and lines sheet 4 Approved Drawing · 22 Sep 2022
  • Kerbing, signs and lines sheet 3 Approved Drawing · 22 Sep 2022
  • Kerbing, signs and lines sheet 2 Approved Drawing · 22 Sep 2022
  • Kerbing, signs and lines sheet 1 Approved Drawing · 22 Sep 2022
  • General arrangement and joint layout sheet 9 Approved Drawing · 22 Sep 2022
  • General arrangement and joint layout sheet 8 Approved Drawing · 22 Sep 2022
  • General arrangement and joint layout sheet 7 Approved Drawing · 22 Sep 2022
  • General arrangement and joint layout sheet 6 Approved Drawing · 22 Sep 2022
  • General arrangement and joint layout sheet 5 Approved Drawing · 22 Sep 2022
  • General arrangement and joint layout sheet 4 Approved Drawing · 22 Sep 2022
  • General arrangement and joint layout sheet 3 Approved Drawing · 22 Sep 2022
  • General arrangement and joint layout sheet 2 Approved Drawing · 22 Sep 2022
  • General arrangement and joint layout sheet 1 Approved Drawing · 22 Sep 2022
  • Management and maintenance Report · 22 Sep 2022
  • Drainage strategy report Report · 22 Sep 2022
  • Proposed finished floor levels Report · 22 Sep 2022
  • Construction details sheet 14 Approved Drawing · 22 Sep 2022
  • Construction details sheet 13 Approved Drawing · 22 Sep 2022
  • Construction details sheet 12 Approved Drawing · 22 Sep 2022
  • Construction details sheet 11 Approved Drawing · 22 Sep 2022
  • Construction details sheet 10 Approved Drawing · 22 Sep 2022
  • Construction details sheet 9 Approved Drawing · 22 Sep 2022
  • Construction details sheet 8 Approved Drawing · 22 Sep 2022
  • Construction details sheet 7 Approved Drawing · 22 Sep 2022
  • Construction details sheet 6 Approved Drawing · 22 Sep 2022
  • Construction details sheet 5 Approved Drawing · 22 Sep 2022
  • Construction details sheet 4 Approved Drawing · 22 Sep 2022
  • Construction details sheet 3 Approved Drawing · 22 Sep 2022
  • Construction details sheet 2 Approved Drawing · 22 Sep 2022
  • Construction details sheet 1 Approved Drawing · 22 Sep 2022
  • Pavement construction sheet 9 Approved Drawing · 22 Sep 2022
  • Pavement construction sheet 8 Approved Drawing · 22 Sep 2022
  • Pavement construction sheet 7 Approved Drawing · 22 Sep 2022
  • Pavement construction sheet 6 Approved Drawing · 22 Sep 2022
  • Pavement construction sheet 5 Approved Drawing · 22 Sep 2022
  • Pavement construction sheet 4 Approved Drawing · 22 Sep 2022
  • Pavement construction sheet 3 Approved Drawing · 22 Sep 2022
  • Pavement construction sheet 2 Approved Drawing · 22 Sep 2022
  • Pavement construction sheet 1 Approved Drawing · 22 Sep 2022
  • Cut and fill Approved Drawing · 22 Sep 2022
  • Contours and levels sheet 9 Approved Drawing · 22 Sep 2022
  • Contours and levels sheet 8 Approved Drawing · 22 Sep 2022
  • Contours and levels sheet 7 Approved Drawing · 22 Sep 2022
  • Contours and levels sheet 6 Approved Drawing · 22 Sep 2022
  • Contours and levels sheet 5 Approved Drawing · 22 Sep 2022
  • Contours and levels sheet 4 Approved Drawing · 22 Sep 2022
  • Contours and levels sheet 3 Approved Drawing · 22 Sep 2022
  • Contours and levels sheet 2 Approved Drawing · 22 Sep 2022
  • Contours and levels sheet 1 Approved Drawing · 22 Sep 2022
  • Surface water drainage overland flow routes Approved Drawing · 22 Sep 2022
  • Surface water drainage contribution areas Approved Drawing · 22 Sep 2022
  • Foul and surface water drainage overlay Approved Drawing · 22 Sep 2022
  • Foul water drainage outfall Approved Drawing · 22 Sep 2022
  • Foul water drainage sheet 9 Approved Drawing · 22 Sep 2022
  • Foul water drainage sheet 8 Approved Drawing · 22 Sep 2022
  • Foul water drainage sheet 7 Approved Drawing · 22 Sep 2022
  • Foul water drainage sheet 6 Approved Drawing · 22 Sep 2022
  • Foul water drainage sheet 5 Approved Drawing · 22 Sep 2022
  • Foul water drainage sheet 4 Approved Drawing · 22 Sep 2022
  • Foul water drainage sheet 3 Approved Drawing · 22 Sep 2022
  • Foul water drainage sheet 2 Approved Drawing · 22 Sep 2022
  • Foul water drainage sheet 1 Approved Drawing · 22 Sep 2022
  • Surface water drainage outfall Approved Drawing · 22 Sep 2022
  • Surface water drainage sheet 9 Approved Drawing · 22 Sep 2022
  • Surface water drainage sheet 8 Approved Drawing · 22 Sep 2022
  • Surface water drainage sheet 7 Approved Drawing · 22 Sep 2022
  • Surface water drainage sheet 6 Approved Drawing · 22 Sep 2022
  • Surface water drainage sheet 5 Approved Drawing · 22 Sep 2022
  • Surface water drainage sheet 4 Approved Drawing · 22 Sep 2022
  • Surface water drainage sheet 3 Approved Drawing · 22 Sep 2022
  • Surface water drainage sheet 2 Approved Drawing · 22 Sep 2022
  • Surface water drainage sheet 1 Approved Drawing · 22 Sep 2022
  • Loading dock general arrangement and sections Approved Drawing · 22 Sep 2022
  • Construction environmental management plan Report · 21 Sep 2022
  • Ecological clerk of works statement Report · 20 Sep 2022
  • Application fees pdf Fees PDF · 20 Sep 2022
  • Habitat survey of factory site Report · 20 Sep 2022
  • Location plan Approved Drawing · 20 Sep 2022
  • Application for matters specified in conditions Application Form · 20 Sep 2022
  • Tp for factory at operational stage Report · 20 Sep 2022

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

North Ayrshire granted permission on 24 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Former Coal Terminal Hunterston West Kilbride Ayrshire

    22/00133/PPPM Submitted 18 Feb 2022 50 yards away

    Planning permission in principle for the erection of a high voltage cable manufacturing facility, including detailed planning permission for the construction of a 185m high extrusion tower with associated factories, research and testing laboratories, offices with associated stores, transport, access, parking and landscaping with on-site generation and electrical infrastructure and cable delivery system

    Granted Outline 114 docs
    Major scheme
  • Former Coal Terminal Hunterston West Kilbride Ayrshire

    23/00070/PP Submitted 30 Jan 2023 50 yards away

    Variation of conditions 9 and 18 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Granted Full applications 9 docs
  • Former Coal Terminal Hunterston West Kilbride Ayrshire

    23/00131/PP Submitted 22 Feb 2023 50 yards away

    Variation of condition 11 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Granted Full applications 7 docs
  • Former Coal Terminal Hunterston West Kilbride Ayrshire

    22/00759/PP Submitted 4 Oct 2022 50 yards away

    Variation of conditions 11 and 12 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Withdrawn Full applications 5 docs
  • Clydeport Authority Fairlie Largs North Ayrshire KA29 0AZ

    26/00007/PP Submitted 7 Jan 2026 400 yards away

    Installation of three replacement electricity sub-stations

    Granted Full applications 16 docs

In North Ayrshire

  • 26/00070/ALO Granted

    Bogside Sandy Road Irvine North Ayrshire KA12 8SN

    Discharge of Section 75 obligation attached to expired and unimplemented planning permission 08/00251/PP

    Received 3 Feb, published by the council 27 Jul 2026 Conditions
  • 25/00438/MSC Granted

    Site To South East Of Invereoch Halketburn Road Skelmorlie North Ayrshire

    Erection of detached dwelling house

    Received 18 Sep, published by the council 28 Jul 2026 Conditions
  • SNI25/00438/MSC Granted

    Site To South East Of Invereoch Halketburn Road Skelmorlie North Ayrshire

    Erection of detached dwelling house

    Received 18 Sep, published by the council 28 Jul 2026 Conditions
  • 24/00327/ALO Granted

    Sannox Sand Quarry Sannox Brodick Isle Of Arran North Ayrshire KA27 8JD

    Discharge of S.75 agreement which was initially put in place in 1999 in connection with planning permission 97/00653/PP and subsequently varied in 2012 in connection with planning permission 10/00212/PP

    Received 15 Apr, published by the council 1 Sep 2026 Conditions
  • 24/00114/ALO Granted

    Clauchlands View Cottage Clauchlands Farm Lamlash Brodick Isle Of Arran North Ayrshire KA27 8LH

    Removal of Section 75 agreement from planning permission 06/00498/PP to remove occupancy restriction

    Received 12 Feb, published by the council 1 Sep 2026 Conditions