Planning application
Former Coal Terminal Hunterston West Kilbride Ayrshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of details pertaining to pre-commencement conditions relating to erection of a high voltage cable manufacturing facility
As published by the council, reference 22/00712/MSCM
Application record
- Reference
- 22/00712/MSCM
- Type
- Matters Specified in Conditions (Major)
- Status
- Approved subject to Conditions
- Decision
- Granted As published: Approved subject to Conditions
- Received
- 20 Sep 2022
- Validated
- 25 Oct 2022
- Decided
- 24 May 2023
- Ward
- North Coast
- Parish
- Fairlie Community Council
- Decision by
- Committee
Site history
Applications at this address on the North Ayrshire register
This site has had 7 applications since 2021: 5 approved, 0 refused.
-
23/00744/PP Granted
Former Coal Terminal Hunterston West Kilbride Ayrshire
Development and operation of a grid stability facility
-
23/00131/PP Granted
Former Coal Terminal Hunterston West Kilbride Ayrshire
Variation of condition 11 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility
-
23/00070/PP Granted
Former Coal Terminal Hunterston West Kilbride Ayrshire
Variation of conditions 9 and 18 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility
-
22/00759/PP Withdrawn
Former Coal Terminal Hunterston West Kilbride Ayrshire
Variation of conditions 11 and 12 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility
-
22/00133/PPPM Granted
Former Coal Terminal Hunterston West Kilbride Ayrshire
Planning permission in principle for the erection of a high voltage cable manufacturing facility, including detailed planning permission for the construction of a 185m high extrusion tower with associated factories, research and testing laboratories, offices with associated stores, transport, access, parking and landscaping with on-site generation and electrical infrastructure and cable delivery system
-
21/00480/EIA Decided
Former Coal Terminal Hunterston West Kilbride Ayrshire
EIA screening request for proposed synchronous compensator
Timeline
Dates from the published record
-
20 Sep 2022
Received by North Ayrshire
-
25 Oct 2022
Validated
Checked as complete and ready for consideration.
-
24 May 2023
Decision issued: Approved subject to Conditions
-
25 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
RPS Group Fao Jim Bailey Agent
4 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
173 documents on file for this application
- Decision notice
- Surface water drainage sheet 7
- Surface water drainage sheet 4
- Surface water drainage sheet 1
- Revised environmental health response
- Drainage strategy report
- Acoustic assessment
- Cable pathway - typical details
- Cable pathway - key plan
- Hunterston quay layout - no vessel
- Grosvenor consultancy for fairlie cc
- Additional fairlie cc response
- Further cumbrae cc response
- Environmental health response
- Tr/npa/2
- Fairlie cc response
- Network rail response
- Traffic management plan
- Comments
- Transport scotland response
- Flooding response
- Comments
- Comments
- Cumbrae cc response
- Trnpa1
- Roads response
- Trnpa1
- Noise report
- Masterplan
- Masterplan location plan
- Overview of possible renewable energy sources for xlcc hunterston
- Condition 3
- Illustrative masterplan
- Master plan manufacturing process
- Master plan servicing strategy
- Master plan staff access strategy
- Master plan emergency access strategy
- Master plan outline security strategy
- Master plan waste management
- External lighting layout indicative sheet 2 of 2
- External lighting layout indicative sheet 1 of 2
- Stage 3 comprehensive landscape masterplan
- Stage 3 soft landscape proposals sheet 01
- Stage 3 soft landscape proposals sheet 02
- Stage 3 soft landscape proposals sheet 03
- Stage 3 soft landscape proposals sheet 04
- Stage 3 soft landscape proposals sheet 05
- Stage 3 soft landscape proposals sheet 06
- Typical tree pit details
- Stage 3 schedule of soft landscape components
- Plan-ga-00(ground) - main factory - full building.
- Proposed elevations - main factory
- Elevations as proposed (tower) - main factory
- Proposed elevations (tower)
- Level b1 ga plan (tower)
- Level 26 ga plan (tower)
- Level 22 ga plan (tower)
- Level 21 ga plan (tower)
- Level 00 ga plan (tower)
- Full building proposed elevations (conductor manufacture)
- Proposed south & west elevations (conductor manufacture)
- Proposed north & east elevations (conductor manufacture)
- Full building ga plans (conductor manufacture)
- Proposed ga plan - roof (c4) (conductor manufacture)
- Proposed ga plan - mezzanine (c4) (conductor manufacture)
- Proposed ga plan - ground floor (c4) (conductor manufacture)
- Proposed ga plan - roof (c3) (conductor manufacture)
- Proposed ga plan - mezzanine (c3) (conductor manufacture)
- Proposed ga plan - ground floor (c3) (conductor manufacture)
- Proposed ga plan - roof (c2 (conductor manufacture)
- Proposed ga plan - mezzanine (c2) (conductor manufacture)
- Proposed ga plan - ground floor (c2) (conductor manufacture)
- Proposed ga plan - roof (c1) (conductor manufacture)
- Proposed ga plan - mezzanine (c1) (conductor manufacture)
- Proposed ga plan - ground floor (c1) (conductor manufacture)
- Canteen proposed elevations
- Canteen proposed floor plan
- Cable rewinding ground floor plan
- Cable rewinding elevations
- Pq testing elevations
- Pq testing floor plans
- Full building ga plans (factory joints)
- Full building proposed elevations (factory joints)
- General arrangement - gatehouse (office)
- Elevations (office)
- Proposed plans (office)
- Proposed ground floor plan (utilities)
- Proposed elevations (utilities)
- Kerbing, signs and lines sheet 9
- Kerbing, signs and lines sheet 8
- Kerbing, signs and lines sheet 7
- Kerbing, signs and lines sheet 6
- Kerbing, signs and lines sheet 5
- Kerbing, signs and lines sheet 4
- Kerbing, signs and lines sheet 3
- Kerbing, signs and lines sheet 2
- Kerbing, signs and lines sheet 1
- General arrangement and joint layout sheet 9
- General arrangement and joint layout sheet 8
- General arrangement and joint layout sheet 7
- General arrangement and joint layout sheet 6
- General arrangement and joint layout sheet 5
- General arrangement and joint layout sheet 4
- General arrangement and joint layout sheet 3
- General arrangement and joint layout sheet 2
- General arrangement and joint layout sheet 1
- Management and maintenance
- Drainage strategy report
- Proposed finished floor levels
- Construction details sheet 14
- Construction details sheet 13
- Construction details sheet 12
- Construction details sheet 11
- Construction details sheet 10
- Construction details sheet 9
- Construction details sheet 8
- Construction details sheet 7
- Construction details sheet 6
- Construction details sheet 5
- Construction details sheet 4
- Construction details sheet 3
- Construction details sheet 2
- Construction details sheet 1
- Pavement construction sheet 9
- Pavement construction sheet 8
- Pavement construction sheet 7
- Pavement construction sheet 6
- Pavement construction sheet 5
- Pavement construction sheet 4
- Pavement construction sheet 3
- Pavement construction sheet 2
- Pavement construction sheet 1
- Cut and fill
- Contours and levels sheet 9
- Contours and levels sheet 8
- Contours and levels sheet 7
- Contours and levels sheet 6
- Contours and levels sheet 5
- Contours and levels sheet 4
- Contours and levels sheet 3
- Contours and levels sheet 2
- Contours and levels sheet 1
- Surface water drainage overland flow routes
- Surface water drainage contribution areas
- Foul and surface water drainage overlay
- Foul water drainage outfall
- Foul water drainage sheet 9
- Foul water drainage sheet 8
- Foul water drainage sheet 7
- Foul water drainage sheet 6
- Foul water drainage sheet 5
- Foul water drainage sheet 4
- Foul water drainage sheet 3
- Foul water drainage sheet 2
- Foul water drainage sheet 1
- Surface water drainage outfall
- Surface water drainage sheet 9
- Surface water drainage sheet 8
- Surface water drainage sheet 7
- Surface water drainage sheet 6
- Surface water drainage sheet 5
- Surface water drainage sheet 4
- Surface water drainage sheet 3
- Surface water drainage sheet 2
- Surface water drainage sheet 1
- Loading dock general arrangement and sections
- Construction environmental management plan
- Ecological clerk of works statement
- Application fees pdf
- Habitat survey of factory site
- Location plan
- Application for matters specified in conditions
- Tp for factory at operational stage
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Ayrshire granted permission on 24 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Former Coal Terminal Hunterston West Kilbride Ayrshire
Planning permission in principle for the erection of a high voltage cable manufacturing facility, including detailed planning permission for the construction of a 185m high extrusion tower with associated factories, research and testing laboratories, offices with associated stores, transport, access, parking and landscaping with on-site generation and electrical infrastructure and cable delivery system
Granted Outline 114 docsMajor scheme -
Former Coal Terminal Hunterston West Kilbride Ayrshire
Variation of conditions 9 and 18 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility
Granted Full applications 9 docs -
Former Coal Terminal Hunterston West Kilbride Ayrshire
Variation of condition 11 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility
Granted Full applications 7 docs -
Former Coal Terminal Hunterston West Kilbride Ayrshire
Variation of conditions 11 and 12 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility
Withdrawn Full applications 5 docs -
Clydeport Authority Fairlie Largs North Ayrshire KA29 0AZ
Installation of three replacement electricity sub-stations
Granted Full applications 16 docs
Other condition discharge and variation applications
In North Ayrshire
-
26/00070/ALO Granted
Bogside Sandy Road Irvine North Ayrshire KA12 8SN
Discharge of Section 75 obligation attached to expired and unimplemented planning permission 08/00251/PP
-
25/00438/MSC Granted
Site To South East Of Invereoch Halketburn Road Skelmorlie North Ayrshire
Erection of detached dwelling house
-
SNI25/00438/MSC Granted
Site To South East Of Invereoch Halketburn Road Skelmorlie North Ayrshire
Erection of detached dwelling house
-
24/00327/ALO Granted
Sannox Sand Quarry Sannox Brodick Isle Of Arran North Ayrshire KA27 8JD
Discharge of S.75 agreement which was initially put in place in 1999 in connection with planning permission 97/00653/PP and subsequently varied in 2012 in connection with planning permission 10/00212/PP
-
24/00114/ALO Granted
Clauchlands View Cottage Clauchlands Farm Lamlash Brodick Isle Of Arran North Ayrshire KA27 8LH
Removal of Section 75 agreement from planning permission 06/00498/PP to remove occupancy restriction