Planning application

Former Coal Terminal Hunterston West Kilbride Ayrshire

Granted North Ayrshire 22/00133/PPPM Planning in Principle (Major)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Planning permission in principle for the erection of a high voltage cable manufacturing facility, including detailed planning permission for the construction of a 185m high extrusion tower with associated factories, research and testing laboratories, offices with associated stores, transport, access, parking and landscaping with on-site generation and electrical infrastructure and cable delivery system

As published by the council, reference 22/00133/PPPM

Application record

Reference
22/00133/PPPM
Type
Planning in Principle (Major)
Status
Approved subject to Conditions
Decision
Approved subject to Conditions
Received
18 Feb 2022
Validated
25 Feb 2022
Decided
29 Jun 2022
Ward
North Coast
Parish
Fairlie Community Council
Decision by
Committee Decision

Site history

Applications at this address on the North Ayrshire register

This site has had 6 applications since 2021: 4 approved, 0 refused.

  • 23/00744/PP Granted

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Development and operation of a grid stability facility

    Decided 4 Dec 2023 Full applications
  • 23/00131/PP Granted

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Variation of condition 11 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Decided 24 May 2023 Full applications
  • 23/00070/PP Granted

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Variation of conditions 9 and 18 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Decided 23 Mar 2023 Full applications
  • 22/00759/PP Withdrawn

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Variation of conditions 11 and 12 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Decided 22 Feb 2023 Full applications
  • 21/00480/EIA Decided

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    EIA screening request for proposed synchronous compensator

    Decided 1 Jun 2021 Outline

Timeline

Dates from the published record

  1. 18 Feb 2022

    Received by North Ayrshire

  2. 25 Feb 2022

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jun 2022

    Decision issued: Approved subject to Conditions

  4. 1 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

3 later applications on the register refer to this one:

  • 23/00131/PP Granted

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Variation of condition 11 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Decided 24 May 2023 Full applications
  • 23/00070/PP Granted

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Variation of conditions 9 and 18 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Decided 23 Mar 2023 Full applications
  • 22/00759/PP Withdrawn

    Former Coal Terminal Hunterston West Kilbride Ayrshire

    Variation of conditions 11 and 12 of planning permission N/22/00133/PPPM relating to the construction of a high voltage sub-sea cable manufacturing facility

    Decided 22 Feb 2023 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

114 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

North Ayrshire granted permission on 29 June 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

In North Ayrshire

  • 26/00560/EIA Decided

    Camphill Water Treatment Works Dalry North Ayrshire KA24 5LB

    Request for EIA screening opinion for proposed installation of solar array (consisting of 414 no. 625W PV panels, inverters, batteries and kiosk)

    21 Aug 2026 Outline
  • 26/00420/PPP Granted

    Bridgend Mill Site No 3 Bridgend Dalry North Ayrshire

    Residential development (in principle)

    15 Jun 2026 Outline
  • 26/00412/EIA Decided

    BPI Industrial Lundholm Road Stevenston North Ayrshire KA20 3LJ

    Request for EIA screening opinion for is required to be submitted for a proposed cable route to connect the approved Ardeer Wind Farm to the nearby Amcor factory

    10 Jun 2026 Outline
  • 26/00308/EIA Decided

    Clydeport Hunterston Terminal Fairlie Largs North Ayrshire KA29 0AZ

    EIA Screening request for a proposed electric vehicle (EV) charging hub and its associated infrastructure

    29 Apr 2026 Outline
  • 26/00156/PPP Granted

    45 - 59 Sharphill Road Saltcoats North Ayrshire

    Erection of dwelling houses (in principle)

    2 Mar 2026 Outline