Planning application
Railway Viaduct Castle Terrace Cullen Moray
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed installation of permanent light fittings to the ground immediately adjacent to the viaduct piers
As published by the council, reference 22/01762/LBC
Application record
- Reference
- 22/01762/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 25 Nov 2022
- Validated
- 25 Dec 2022
- Decided
- 27 Jan 2023
- Ward
- Keith And Cullen
- Parish
- Cullen & Deskford
- Decision by
- Delegated Power
Site history
Applications at this address on the Moray register
This site has had 4 applications since 2022: 4 approved, 0 refused.
-
22/01763/APP Granted
Railway Viaduct Castle Terrace Cullen Moray
Proposed installation of permanent light fittings to the ground immediately adjacent to the viaduct piers at
-
22/00276/APP Granted
Railway Viaduct Castle Terrace Cullen Moray
Installation of permanent light fittings to the ground immediately adjacent to the viaduct piers at
-
22/00275/LBC Granted
Railway Viaduct Castle Terrace Cullen Moray
Proposed installation of permanent light fittings to the ground immediately adjacent to the viaduct piers for illumination of the viaduct structure
Timeline
Dates from the published record
-
25 Nov 2022
Received by Moray
-
25 Dec 2022
Validated
Checked as complete and ready for consideration.
-
27 Jan 2023
Decision issued: Permitted
-
11 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 22/00275/LBC (Decided)
- Application: 22/01763/APP (Decided)
Who's behind it
Company information only, from the register and Companies House
Ross Cowie Architect Agent, an architecture practice registered in Buckie
Active · incorporated 2011 · Buckie
20 applications on PlanIndex · across 2 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordCullen Christmas Lights Group Applicant
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
- DECISION NOTICE - APPROVE
- REPORT OF HANDLING
- PROPOSED LAYOUT PLAN - APPROVED
- NORTH EAST ELEVATIONS - APPROVED
- SOUTH WEST ELEVATIONS - APPROVED
- DETAIL ELEVATION SECTION - APPROVED
- LAMP POST DETAILS - APPROVED
- EXISTING BLOCK PLAN
- EXISTING LAYOUT PLAN
- LOCATION PLAN - APPROVED
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 27 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Railway Viaduct Castle Terrace Cullen Moray
Proposed installation of permanent light fittings to the ground immediately adjacent to the viaduct piers for illumination of the viaduct structure
Granted Heritage and listed buildings 12 docs -
Railway Viaduct Castle Terrace Cullen Moray
Installation of permanent light fittings to the ground immediately adjacent to the viaduct piers at
Granted Full applications 12 docs -
Railway Viaduct Castle Terrace Cullen Moray
Proposed installation of permanent light fittings to the ground immediately adjacent to the viaduct piers at
Granted Full applications 10 docs -
Cullen Viaduct Car Park Cullen Moray
Install a Top Up Tap for water bottles on
Granted Full applications 7 docs -
Royal Oak Hotel 34 Castle Terrace Cullen Buckie Moray AB56 4SD
96% historically approved · decision due ~31 Mar
Part demolition alter and extend existing hotel to provide pizza and seafood takeaway with delicatessen at
Awaiting decision Heritage and listed buildings Demolition 28 docs -
Royal Oak Hotel 34 Castle Terrace Cullen Buckie Moray AB56 4SD
97% historically approved · decision due ~31 Mar
Part demolition alter and extend existing hotel to provide pizza and seafood takeaway with delicatessen at
Awaiting decision Full applications Demolition 60 docs
Other heritage and listed building applications
In Moray
-
26/00747/LBC Granted
8 Cothall Cottages Forres Moray IV36 2SQ
Provide secondary glazing to windows at
-
26/00985/LBC Granted
Mahanaim-balnagone 20 King Street Elgin Moray IV30 1EU
Remove cement pointing and repoint with breathable lime mortar on north and west elevations at
-
26/00430/LBC Granted
45 Findhorn Forres Moray IV36 3YF
Addition of roof light replace existing windows slates and gutters and remove existing cement render and apply new lime harl render at
-
26/00906/LBC Granted
11 Reidhaven Street Elgin Moray IV30 1QG
Erect replacement sun lounge at
-
26/01182/LBC Awaiting decision
5 Bank Lane Forres Moray IV36 1NU
Repair chimney at