DM/2026/00292

Usk Bridge Merthyr Road Llanfoist Monmouthshire

Awaiting decision Monmouthshire Certificate of Prop Lawful Use or Dev

Proposal

The proposal is for the construction of a new fish pass at Abergavenny bridge, Llanfoist. Abergavenny Bridge is orientated perpendicular to flow across the River Usk, with a total length of 62m . The bridge apron, which terminates in a vertical drop which is exposed in low flows, presents a barrier to fish migration . The apron is considered a significant barrier to shad, although they are occasionally observed upstream, as well as other fish species such as lamprey. The shallow apron also delays salmonid passage during low flows, particularly the sloping glacis towards the disused railway bridge abutments. A fish pass has been determined as the best solution to this barrier. The pass will comprise a notch in the concrete apron below Arch 2 (second arch from the true right bank), in which perturbation boulders will be evenly spaced. This will provide an area of deeper, slower flowing water for fish to move through. This is hoped to be particularly beneficial to shad populations, which migrate upstream to spawn during summer (primarily June/July) when river flows are often at their lowest. The bridge, which is owned by Monmouthshire County Council, is a Scheduled Monument and Grade II* listed structure. The proposed works are therefore to be carried out under Scheduled Monument Consent with appropriate archaeological supervision. The proposed design of the new fish pass comprises a ?notch? within the concrete apron. This notch will require the cutting of a channel into the concrete, approximately 3.6m wide and 700-800mm below the existing level. These dimensions have been chosen to ensure that the final level is effective as a fish pass. It was decided that the most appropriate arch to locate the fish pass was Arch 2, so as to optimise hydraulics of the fish-pass and the lower depth of the apron as compared to the other arches, which minimises the depth of excavation. To provide a 5% gradient (and therefore appropriate velocities), the channel will need to

As published by the council, reference DM/2026/00292

Timeline

Dates from the published record

  1. 9 Mar 2026

    Received by Monmouthshire

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Monmouthshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • DM/2025/01469 Granted

    Proposed River Usk Bridge Merthyr Road Llanfoist Monmouthshire

    Discharge of condition 3 (Construction Environmental Management Plan - REVISION 06) relating to planning DM/2018/00408.

    19 Nov 2025 91m away Conditions
  • DM/2025/01408 Granted

    30 Riverside Drive Llanfoist NP7 9PX

    Change of material for Planning Permission already granted (DM/2021/00099) from Brick to Composite Fencing and reduce the height to 1830mm from 1980mm

    5 Nov 2025 238m away Householder
  • DM/2026/00661 Granted

    67 Park Street Abergavenny NP7 5YD

    T1 Holly - fell and grind (front garden next to boundary wall)

    22 May 2026 318m away Trees
  • DM/2025/01017 Granted

    67 Park Street Abergavenny NP7 5YD

    Removal of trees as identified on submitted plan (site plan as existing PSA-01)

    4 Aug 2025 318m away Trees
  • DM/2025/01533 Granted

    Linda Vista Gardens Tudor Street Abergavenny Monmouthshire

    Mature Elm (Japanese?) suffering from extensive honey fungus around base. Bark lifting on main stem. Fell to ground level.

    2 Dec 2025 342m away Trees
  • DM/2026/00413 Granted

    86 St Helen's Road Abergavenny NP7 5UU

    Proposed first floor extension over existing ground floor to the rear of the property together with internal alterations.

    30 Mar 2026 484m away Householder

In Monmouthshire

  • DM/2026/00895 Granted

    1 Raglan Terrace Abergavenny Monmouthshire NP7 9SR

    I would like to use our double garage for use as a habitable annexe to Main House, in order to accommodate my daughter and partner who are returning to Abergavenny from Bristol. The garage is currently used as gym, garden room and study

    21 Jul 2026 Lawful development
  • DM/2026/00611 Granted

    6 Piercefield Terrace Devauden Road St Arvans NP16 6EW

    Rear single storey extension.

    11 May 2026 Lawful development
  • DM/2026/00541 Granted

    12 Castle Wood Usk Monmouthshire NP15 1SR

    Partial garage conversion, internal alterations, enlargement of existing side window and new bi fold doors.

    27 Apr 2026 Lawful development
  • DM/2026/00860 Granted

    6 Lilac Drive Rockfield Monmouth Monmouthshire NP25 5DY

    The existing dwelling was constructed as a domestic dwelling in or around 2004 and has been in constant use as such since first occupation. Conversion of garage space to for a habitable room.

    14 Jul 2026 Lawful development
  • DM/2026/00886 Awaiting decision

    4 Whitehall Gardens Undy Monmouthshire NP26 3EW

    Proposed single storey extension with materials to match existing house.

    20 Jul 2026 Lawful development