Skip to content
PlanIndex Get alerts
Menu

Planning application

DM/2025/01403

Ty Ystablau Ty Celyn Llanhennock NP18 1LT

Awaiting decision Monmouthshire Agric Notification

Proposal

The proposed development comprises of two elements (Agricultural Tracks and Hardstanding Access/Turning Area) which are essential for agricultural infrastructure designed to support the effective management of the smallholding.

As published by the council, reference DM/2025/01403

Timeline

Dates from the published record

  1. 4 Nov 2025

    Received by Monmouthshire

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Monmouthshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

Nearby applications

Within 500 metres

  • DM/2026/00243 Decided

    Land South Of Nant Y Mynydd Llanhennock Top Road Llanhennock Monmouthshire

    A length of agricultural track will strategically link the access point to the adjacent field where cattle to be transported, protecting the pastureland whilst ensuring safe access for plant. The track will be approximately 3.5 metres wide and will be surfaced with permeable crushed stone. The total length of track will be approximately 175 meters. The design will follow the existing contours of the land and run along the field boundary preserving as much pastureland as possible. This improvement is critical for enhancing access for plant and livestock handling equipment, while simultaneously mitigating surface erosion and preventing ground damage.

    26 Feb 2026 75m away Other
  • DM/2025/01012 Granted

    Silver How Llanhennock NP18 1LT

    G1 Silver Birch (reduce heights by 1 to 2m) T1 Dead Beech Tree (fell) T2, T3, T4 Beech Trees (remove deadwood) G1 Silver Birch (reduce heights by 1 to 2m) T1 Dead Beech Tree (fell) T2, T3, T4 Beech Trees (remove deadwood) T5 Ash Tree (fell) T6 - Oak Tree (2 to 3m crown reduction) T7 Ash tree (remove deadwood) T8 Oak Tree (3 to 4m crown reduction) T9 and T10 Oak Tree (1 to 2m crown reduction and removal of excessive epicormic growth) T11 Oak Tree (removal of deadwood) T13 Elm Tree (fell) Pease see Tree Report for further details.

    1 Aug 2025 239m away Trees
  • DM/2026/00357 Awaiting decision

    Llanhennock Lodge Nursing Home Llanhennock Top Road Llanhennock Monmouthshire NP18 1LT

    Partial demolition of buildings and conversion of former care home and ancillary buildings into 10no residential dwellings, erection of extensions and associated infrastructure, landscaping and highways works

    19 Mar 2026 498m away Full applications

In Monmouthshire

  • DM/2026/00909 Awaiting decision

    Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ

    The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC.

    23 Jul 2026 Other
  • DM/2026/00899 Awaiting decision

    Troy View Craig-y-dorth Road Mitchel Troy Common Mitchel Troy Monmouthshire NP25 4RL

    Farm implement shed

    21 Jul 2026 Other
  • DM/2026/00869 Decided

    Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ

    The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC. Why necessary for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management. Why designed for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management.

    16 Jul 2026 Other
  • DM/2026/00768 Decided

    Upper Court Farm King Road Penpergwm Monmouthshire NP7 9AS

    Proposed new general purpose agricultural and associated works.

    23 Jun 2026 Other
  • DM/2026/00887 Awaiting decision

    Land Adjacent To Wyastone Leys Fishery A40 Trunk Road From Hardwick Roundabout To Monmouth Monmouthshire

    Replacement general-purpose agricultural building and associated works.

    20 Jul 2026 Other