Planning application
Basement to First Floor 58-60 Portland Street Manchester M1 4QT
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Condition 3 (Samples and Specifications) attached Planning Permission 142537/FO/2025.
As published by the council, reference OTH-2026-001574
Application record
- Reference
- OTH-2026-001574
- Type
- Approval of details reserved by a condition
- Status
- Under Consultation
- Received
- 8 Sep 2026
- Validated
- 8 Sep 2026
- Ward
- Deansgate
- Decision by
- Delegated Decision
- Postcode
- M1 4QT
Comment by 5 October 2026
The council is taking comments on this application until then. Comments go to Manchester through their own planning portal.
Site history
Applications at this address on the Manchester register
This site has had 2 applications since 2025: 0 approved, 1 refused.
-
144471/FO/2025 Refused
Basement To First Floor 58 - 60 Portland Street Manchester M1 4QT
Change of use of ground floor from Class E to Sui Generis Adult Gaming Centre, with installation of 2no replacement air conditioning units and elevational alterations including new doors to Portland Street and Reyner Street.
Timeline
Dates from the published record
-
8 Sep 2026
Received by Manchester
-
18 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Manchester took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Manchester for determination, against a statutory target of eight weeks. Over the last year Manchester decided condition discharge and variation applications in a median of 55 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Basement To First Floor 58 - 60 Portland Street Manchester M1 4QT
Change of use of ground floor from Class E to Sui Generis Adult Gaming Centre, with installation of 2no replacement air conditioning units and elevational alterations including new doors to Portland Street and Reyner Street.
Refused Full applications 26 docs -
NatWest Bank Portland Street Manchester M1 4QU
Installation of 2 no. fascia signage, 2 no. projecting signs, ATM surround sign, together with various non illuminated information signs following removal of existing signage
Granted Advertising 15 docs -
-
44 Portland Street Manchester M1 4GS
Listed building consent for internal alterations and external works including signage.
Refused Heritage and listed buildings 45 docs -
44-50 Portland Street Manchester M1 4GS
Listed Building Consent for repair, re-glazing, and replacement of front and rear windows.
Granted Heritage and listed buildings Windows or glazing 20 docs -
44 Portland Street Manchester M1 4GS
Change of use from betting shop (Sui Generis) use to adult gaming centre (Sui Generis) with external works
Refused Full applications 43 docs
Other condition discharge and variation applications
In Manchester
-
OTH-2026-000974 Granted
Marriott Residence Inn 40 Laystall St Manchester M1 2JP
Discharge of Condition 4 (Opening Hours) attached to Planning Permission 125369/JO/2019.
-
OTH-2026-000913 Split decision
5 Cotton Hill Manchester M20 4XR
Discharge of Conditions 3 (materials), 4 (waste storage), 6 (electric vehicle charging points), 7 (partial discharge - Secured by Design accreditation), 10 (detailed landscaping scheme) and 12 (construction method statement) attached to Planning Permission 133107/FO/2022.
-
OTH-2026-001266 Split decision
685 Moston Lane Manchester M40 5QD
Discharge of Conditions 8 (Cycle Storage), 9 (EV), 10 (Acoustic Insulation) & 11 (Security) attached to Planning Permission 142547/JO/2025.
-
OTH-2026-001305 Granted
440 Hollinwood Avenue Manchester M40 0AE
Discharge of Condition 15 (Invasive Species) attached to Planning Permission 142670/FO/2025.
-
OTH-2026-001642 Granted
66 Jersey Street Manchester M4 6JW
Discharge of Condition 10b (Ground Conditions) attached to Planning Permission 139289/JO/2024.