Skip to content
PlanIndex Get alerts
Menu

Planning application

27A Chapel Road Manchester M22 4JN

Awaiting decision Manchester NOT-2026-001008 Prior approval Part 1 Class A.1(ea): Larger home extension

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Prior notification of proposed larger home extension projecting 5m to the rear with a maximum height of 4m and a height at eaves of 3m.

As published by the council, reference NOT-2026-001008

Application record

Reference
NOT-2026-001008
Type
Prior approval Part 1 Class A.1(ea): Larger home extension
Status
Under Consideration
Received
13 Jul 2026
Validated
13 Jul 2026
Ward
Northenden
Decision by
Delegated Decision
Postcode
M22 4JN

Site history

Applications at this address on the Manchester register

This site has had 2 applications since 2026: 0 approved, 1 refused.

  • 145357/LP/2026 Refused

    27A Chapel Road Manchester M22 4JN

    Erection of a single-storey rear extension.

    Decided 5 May 2026 Lawful development

Timeline

Dates from the published record

  1. 13 Jul 2026

    Received by Manchester

  2. 24 Jul 2026

    Added to PlanIndex

  3. 17 Aug 2026

    Status changed to Under Consideration

    Previously Under Consultation.

  4. Decision

    Awaiting decision

    Decision expected by 7 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Manchester took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Manchester for determination, against a statutory target of eight weeks. Over the last year Manchester decided prior approval applications in a median of 42 days. More in our guide to how long planning decisions take.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 27A Chapel Road Manchester M22 4JN

    145357/LP/2026 Submitted 12 Mar 2026 50 yards away

    Erection of a single-storey rear extension.

    Refused Lawful development Extension 5 docs
    Small domestic
  • 29A Chapel Road Manchester M22 4JN

    118963/FH/2018 Submitted 2 Feb 2018 50 yards away

    Erection of a single storey rear and side extension to form additional living accommodation

    Granted Householder Extension 5 docs
    Small domestic
  • 16 CHAPEL ROAD MANCHESTER M22 4JW

    PLA-2026-001339 Submitted 13 Aug 2026 50 yards away

    95% historically approved · decision due ~8 Oct

    Erection of a single story rear extension to form additional living accommodation.

    Awaiting decision Householder Extension 5 docs
    Domestic
  • 16 Chapel Road Manchester M22 4JW

    NOT-2026-000810 Submitted 25 Jun 2026 50 yards away

    Prior notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3.9m and a height at eaves of 2.3m.

    Decided Prior approval Extension 6 docs
  • 13 Beech Avenue Manchester M22 4JE

    122549/FH/2019 Submitted 30 Jan 2019 50 yards away

    Erection of a single storey side and rear extension to provide additional living accommodation

    Granted Householder Extension 11 docs
    Small domestic
  • 18 Kingsley Road Manchester M22 4NL

    CDN/21/0468 Submitted 30 Jun 2021 50 yards away

    Discharge of Conditions 4 (Construction Management Plan), 5 and 6 (Contaminated Land), 7 (Surface Water Drainage), 8 (Car Parking/Driveway), 9 (Materials) , 10 (Secure by Design), 11 (Air Quality), 13 (Cycle Parking), 15 (Drainage Maintenance), 16 (Bird and Bat Boxes), 18 (Bin Store Details), 19 (Landscaping), 21 (Rear Windows) and 23 (Highway Works) attached to planning permission 125114/FO/2019

    Split decision Conditions Windows or glazing 11 docs

In Manchester

  • NOT-2026-001144 Refused

    Green space off Pollard Street and Wansfell Walk Manchester M4 7JB

    Installation of 20.0M Monopole Supporting 6No. Antennas And 2No. 0.3M Dishes with Installation Of 2No. Equipment Cabinets and associated Ancillary Equipment

    Received 24 Jul, published by the council 6 Aug 2026 Prior approval
  • NOT-2026-001270 Granted

    173 Mauldeth Road West Manchester M20 1BJ

    Prior-notification of proposed larger home extension projecting 5m to the rear with a maximum height of 2.6m and a height at eaves of 2.4m.

    Received 7 Aug, published by the council 13 Aug 2026 Prior approval
  • NOT-2026-001300 Granted

    Tesco Superstore 3 Victoria Avenue East Manchester M9 6HW

    Prior-approval for the installation of 366 photovoltaic panels on a flat roof.

    Received 10 Aug, published by the council 17 Aug 2026 Prior approval
  • NOT-2026-001286 Granted

    Pavement at Shawbrook Road Manchester M19 1DL

    Prior-approval for the erection of 15m streetworks pole with ancillary antennae and equipment cabinets.

    Received 7 Aug, published by the council 17 Aug 2026 Prior approval
  • NOT-2026-000299 Withdrawn

    GROUND FLOOR HALE HOUSE 337 STYAL ROAD MANCHESTER M22 5LG

    Prior Approval for the installation of a roof mounted solar PV system generating 161.6 kWp, comprising of 372x Astro N5 435W panels or similar

    Received 12 May, published by the council 20 Jul 2026 Prior approval