Planning application

McDonald's Fullbridge Maldon Essex CM9 4LE

Granted Maldon 24/00501/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The installation of 2 rapid electric vehicle charging stations which would replace 4 existing parking bays and ancillary equipment within the car park of McDonalds

As published by the council, reference 24/00501/FUL

Application record

Reference
24/00501/FUL
Type
Full Application
Status
Application approved
Decision
Approved
Received
20 Jun 2024
Validated
20 Jun 2024
Decided
15 Aug 2024
Ward
Maldon North
Parish
Maldon North
Decision by
Delegated
Postcode
CM9 4LE

Timeline

Dates from the published record

  1. 20 Jun 2024

    Received by Maldon

  2. 15 Aug 2024

    Decision issued: Approved

  3. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Tesco Fullbridge Maldon Essex CM9 4LE

    22/01095/FUL Submitted 24 Oct 2022 36m away

    New external canopy over existing Click and Collect parking bays

    Granted Full applications 21 docs
  • McDonald's Fullbridge Essex CM9 4LE

    21/00269/FUL Submitted 15 Mar 2021 56m away

    Reconfiguration of drive thru lane to accommodate side-by-side ordering with changes to car parking and kerb lines, including associated works to the site. Alterations to elevations to include a new "Folded Roof" concept, a 5 sqm extension and replacement drive thru booths. Relocation of the shopfront entrance with new sliding door fitted. The installation of 2 no. digital Customer Order Displays (COD) with overhead Canopies and a Goal Post height restrictor.

    Granted Full applications Extension Windows or glazing 24 docs
  • McDonald's Fullbridge Maldon Essex CM9 4LE

    21/00271/ADV Submitted 15 Mar 2021 56m away

    Application for advertisement consent for the installation of 5No. new digital freestanding signs and 1No. 15" Digital booth screen.

    Refused Advertising 12 docs
  • Unit 3 The Old Ironworks Fullbridge Maldon Essex CM9 4LE

    22/01170/LBC Submitted 14 Nov 2022 69m away

    Split of ground floor unit 3 to create 2no. commercial units, including removal of partitioning and insertion of new partitioning and doors to facilitate split.

    Granted Heritage and listed buildings 9 docs
  • Tesco Fullbridge Maldon Essex CM9 4LE

    22/01014/ADV Submitted 23 Sep 2022 76m away

    Retrospective application for the Media Charger with Screen Media Charger Unit : size 860(W)x2160(H)mm Screen size-530(W)x930(H) mm, 2X Post for Signage Size: 700mm x 1250mm

    Granted Advertising 12 docs
  • Tesco Fullbridge Maldon Essex CM9 4LE

    26/00270/TCA Submitted 21 Apr 2026 111m away

    92% historically approved · decision due ~20 Aug

    T84 - Salix fragilis (Crack Willow) - Re-Pollard to previous pollard points by 4 metres.

    Awaiting decision Trees

In Maldon

  • 25/00972/FUL Granted

    Agricultural Building At Oak Nursery Hackmans Lane Purleigh Essex

    Demolition of existing glasshouses and erection of new dwelling and associated parking area

    28 Oct 2025 Full applications
  • 26/00314/FUL Granted

    69 East Street Tollesbury Maldon Essex CM9 8QE

    Proposed change of use from an office to a children residential home C2 to accommodate 3 children and a live in carer.

    7 May 2026 Full applications
  • 26/00565/FUL Awaiting decision

    Cobbs Farm Maldon Road Goldhanger Maldon Essex CM9 8BQ

    Construction of an additional livestock building for the housing of pigs at Cobbs Farm, and the construction of relating ancillary works.

    14 Aug 2026 Full applications
  • 25/00997/FUL Refused

    Land Adjacent To Oak Corner Cottage Southend Road Woodham Mortimer Essex

    Erection of a new self-build dwelling and associated works

    7 Nov 2025 Full applications
  • 25/00809/FUL Refused

    Land At Oxley House Tiptree Colchester Essex

    New barn building for apiculture associated with adjoining meadowland

    8 Sep 2025 Full applications