Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Junction Of Steeple Road And Mill Road Mayland Essex

Awaiting decision Maldon 25/00569/FUL Full Application Major

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

The construction of 55 new homes and associated landscaping, access, car and cycle parking and refuse and recycling provision.

As published by the council, reference 25/00569/FUL

Application record

Reference
25/00569/FUL
Type
Full Application Major
Status
Pending decision
Received
17 Jun 2025
Validated
30 Jun 2025
Ward
Mayland
Parish
Mayland
Decision by
South East Area Committee

Site history

Applications at this address on the Maldon register

This site has had 2 applications since 2025.

  • 25/00569/FULM Awaiting decision

    Land At Junction Of Steeple Road And Mill Road Mayland Essex

    The construction of 55 new homes and associated landscaping, access, car and cycle parking and refuse and recycling provision.

    Submitted 17 Jun 2025 Full applications

Timeline

Dates from the published record

  1. 17 Jun 2025

    Received by Maldon

  2. 30 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 29 September 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    Maldon took a median of 88 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Maldon for determination, against a statutory target of thirteen weeks. Over the last year Maldon decided full applications in a median of 176 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land At Junction Of Steeple Road And Mill Road Mayland Essex

    25/00569/FULM Submitted 17 Jun 2025 0m away

    76% historically approved · decision due ~29 Sep

    The construction of 55 new homes and associated landscaping, access, car and cycle parking and refuse and recycling provision.

    Awaiting decision Full applications
    Major scheme
  • Fiddlers Rest 1 Mill Road Mayland Essex CM3 6EQ

    21/00290/HOUSE Submitted 18 Mar 2021 82m away

    Single storey rear extension including annexe for carers. Single storey outbuilding with covered walkway. Changes to fenestration.

    Granted Householder Extension Windows or glazing 11 docs
    Small domestic
  • Oak View 1A Mill Road Mayland Chelmsford Essex CM3 6EQ

    26/00227/HOUSE Submitted 27 Mar 2026 92m away

    Detached double garage with storage in roof space, including external staircase to the side elevation.

    Refused Householder
    Domestic
  • Mayflower Nursery House Mill Road Mayland Chelmsford Essex CM3 6EQ

    25/00609/HOUSE Submitted 1 Jul 2025 186m away

    Proposed single storey side extension, front porch extension, addition of chimney, cladding to the side elevation and fenestration alterations.

    Granted Householder Extension Windows or glazing
    Small domestic
  • Land At 23 Steeple Road Mayland Essex

    25/00193/OUT Submitted 3 Mar 2025 346m away

    Outline planning application with all matters reserved for the proposed construction of two detached single storey dwellings.

    Granted Outline
    Small domestic
  • Land At 23 Steeple Road Mayland Essex

    24/00631/OUT Submitted 12 Aug 2024 347m away

    Outline planning application with all matters reserved for proposed construction of two detached single storey dwellings.

    Refused Outline 10 docs
    Small domestic

In Maldon

  • 26/00013/FUL Refused

    Guisnes Lodge Back Road Tolleshunt D'Arcy Maldon Essex CM9 8TW

    Proposed change of use of dwelling to a SEMH residential establishment for children (age 11-18yrs old)

    8 Jan 2026 Full applications
  • 25/00866/FUL Refused

    Beresfords Estate Agents 2A Gate Street Maldon Essex CM9 5QF

    Conversion of existing outbuildings to 1no. 2 bedroom unit and 2no. 1 bedroom units, external alterations including removal of external staircase and new porch canopy's and associated parking.

    25 Sep 2025 Full applications
  • 26/00611/FUL Awaiting decision

    RSPB Old Hall Marshes Old Hall Lane Tolleshunt D'Arcy Maldon Essex CM9 8TP

    Erection of a 3.95m x 3.35m pony shelter/stable on a concrete pad, comprising concrete blockwork and external timber cladding with double doors and a roof overhang leading to an associated 4.75m x 3.35m fenced sand area.

    3 Sep 2026 Full applications
  • 26/00596/FUL Awaiting decision

    Collaroy Dreaming School Road Little Totham Maldon Essex CM9 8LD

    Conversion of agricultural building into a dwelling

    28 Aug 2026 Full applications
  • 26/00449/FUL Granted

    Southminster Church Of England Primary School Burnham Road Southminster Essex CM0 7ES

    Provision of 2no. heat pumps and construction of enclosure.

    2 Jul 2026 Full applications