Planning application

2025/1873/FPA

Conishead Priory Priory Road ULVERSTON LA12 9QQ

Decided Lake District National Park Full Application

Proposal

Retrospective application for the retention of two temporary structures comprising of an external gazebo, and an internal reception desk cubicle.

As published by the council, reference 2025/1873/FPA

Timeline

Dates from the published record

  1. 1 Oct 2025

    Received by Lake District National Park

  2. 28 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 2 Aug 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/1874/LBC Decided

    Conishead Priory Priory Road ULVERSTON LA12 9QQ

    Listed Building Consent for the retention of two temporary structures comprising of an external gazebo, and an internal reception desk cubicle.

    1 Oct 2025 0m away Heritage and listed buildings
  • 2026/1245/TPO Granted

    Manjushri Buddhist Centre Office Conishead Priory Priory Road ULVERSTON LA12 9QQ

    Lancashire CC TPO No 6 1953 - 26-01, 26-02 and 26-03 - Three cherry laurel (Prunus laurocerasus) - growing as understorey shrubs immediately behind the gate (shown on the attached photographs "laurel 1–3" and "gate 1", and on the sketch map). Cut back the lateral branches overhanging the footpath by up to approximately 2-3 metres, sufficient to clear the line of the path and restore safe passage. Cuts to be made cleanly back to a suitable growth point or branch junction. No reduction of the main stems, and no felling, uprooting or removal of the laurels

    18 Jun 2026 0m away Trees
  • 2026/1248/TPO Granted

    Manjushri Buddhist Centre Office Conishead Priory Priory Road ULVERSTON LA12 9QQ

    Lancashire CC TPO No 6 1953 - Tree No. 135 — a single over - mature sycamore (Acer pseudoplatanus), standing approximately 1.5 m from the path, shown as "135" on the submitted location plan and in the BHA Trees Ltd survey excerpt. Remove all deadwood and all dead or dying limbs that overtop the main stem above approximately 10 m, cutting back to the main stem at suitable natural break points. Retain the main stem standing as a monolith (the tree is not to be felled). Retain the live growth on the side of the tree away from the path where it can safely be kept

    18 Jun 2026 0m away Trees
  • 2026/0312/TPO Granted

    Conishead Priory Priory Road ULVERSTON LA12 9QQ

    Lancashire CC TPO No 6 1953 - Two Rhododendron bushes (Rhododendron ponticum) have partially collapsed and become partially uprooted, and one Laurel bush (Prunus laurocerasus) has completely collapsed. It is proposed to remove the collapsed sections (including both dead and living material) while retaining the upright portions of the two rhododendrons

    10 Feb 2026 0m away Trees
  • 2026/1350/TPO Granted

    Conishead Priory Priory Road ULVERSTON LA12 9QQ

    FIVE DAY NOTICE - Lancashire CC TPO No 6 1953 - Cherry Laurel - Minor pruning due to upcoming event to re-establish 2.5m clearance over a footpath and to cut back branches currently extending into the event space

    3 Jul 2026 0m away Trees
  • 2026/1245/TPO Granted

    Manjushri Buddhist Centre Office Conishead Priory Priory Road ULVERSTON LA12 9QQ

    Lancashire CC TPO No 6 1953 - 26-01, 26-02 and 26-03 - Three cherry laurel (Prunus laurocerasus) - growing as understorey shrubs immediately behind the gate (shown on the attached photographs "laurel 1–3" and "gate 1", and on the sketch map). Cut back the lateral branches overhanging the footpath by up to approximately 2-3 metres, sufficient to clear the line of the path and restore safe passage. Cuts to be made cleanly back to a suitable growth point or branch junction. No reduction of the main stems, and no felling, uprooting or removal of the laurels

    18 Jun 2026 0m away Trees

In Lake District National Park

  • 2026/0801/FPA Granted

    Land adjacent to The Mains Stainton Penrith CA11 0DZ

    Variation of condition 2 (approved plans), attached to approval 2025/1358/FPA (Variation of conditions 2 (approved plans) and 8 (Emergency Vehicular Access/EVAs) for amendments to the housetypes and site layout; and removal of conditions 3 (surface water drainage scheme and management plan), 4 (Construction Environment Management Plan (CEMP)), 5 (ecological mitigation measures) and 6 (programme of archaeological work), attached to approval 23/0288).

    22 Apr 2026 Full applications
  • 2026/0207/FPA Granted

    Thornyslack Farm & Peggy Brow Barn Garth Row KENDAL LA8 9AW

    Demolition of existing sun room, replacement single storey sun room. Replacement of existing septic tank with new package treatment plant to serve both properties

    27 Jan 2026 Full applications
  • 2026/0253/FPA Refused

    1-2 Little Dockray Penrith CA11 7HL

    Replacement of existing single glazed timber windows with double glazed timber windows, application of lime render to exterior, replacement of entrance door and surround and replacement of rainwater goods.

    2 Feb 2026 Full applications
  • 2026/0234/FPA Withdrawn

    Lupton Villa Cow Brow Lupton CARNFORTH LA6 1PJ

    Conversion and extension of existing detached garage with residential accommodation to the first floor into a single self build dwelling house, provision of two garages, alterations to existing access, associated drainage works and hard and soft landscaping (Resubmission of 2024/2382/FPA)

    30 Jan 2026 Full applications
  • 2026/1504/FPA Decided

    Ast Signs Ltd Box House Greenbank Road Eden Business Park Penrith CA11 9FB

    Erection of commercial units for mixed use and installation of substation, outdoor sports courts with canopy, and clubhouse with access, parking, fencing and landscaping.

    27 Jul 2026 Full applications