The Fountain 120 Malden Road New Malden KT3 6DD
Works: New dwelling Extension Windows or glazing
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Non-Material Amendment to Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Amendment to entrance door and glazing arrangement to Block B.
As published by the council, reference 21/03541/NMA
Application record
- Reference
- 21/03541/NMA
- Type
- Non-Material Amendment
- Status
- Refused
- Decision
- Refuse
- Received
- 5 Nov 2021
- Validated
- 16 Nov 2021
- Decided
- 14 Dec 2021
- Ward
- St James - OLD
- Parish
- Malden And Coombe - OLD
- Decision by
- Delegated Decision
- Postcode
- KT3 6DD
Site history
Applications at this address on the Kingston upon Thames register
This site has had 5 applications since 2021: 1 approved, 1 refused.
-
23/02115/ADV Withdrawn
The Fountain 120 Malden Road New Malden KT3 6DD
Display of internally illuminated fascia signage to front and side and 1no. projecting sign
-
23/02039/FUL Withdrawn
The Fountain 120 Malden Road New Malden KT3 6DD
Change of use of ground floor unit from retail to martial arts gym (Use Class E(d)) and installation of condenser units.
-
22/01801/NMA Withdrawn
The Fountain 120 Malden Road New Malden KT3 6DD
Non Material Amendment to Planning Permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) to provide an automatic opening vent (AOV) into the eastern roof elevation of Block C.
-
21/02651/CLC Granted
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for condition 11 (Secured by Design) of planninng permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)
Timeline
Dates from the published record
-
5 Nov 2021
Received by Kingston upon Thames
-
16 Nov 2021
Validated
Checked as complete and ready for consideration.
-
14 Dec 2021
Decision issued: Refuse
-
26 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this refusal means
Kingston upon Thames refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for condition 11 (Secured by Design) of planninng permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)
Granted Conditions New dwelling Extension 5 docs -
The Fountain 120 Malden Road New Malden KT3 6DD
Display of internally illuminated fascia signage to front and side and 1no. projecting sign
Withdrawn Advertising 7 docs -
The Fountain 120 Malden Road New Malden KT3 6DD
Change of use of ground floor unit from retail to martial arts gym (Use Class E(d)) and installation of condenser units.
Withdrawn Full applications 13 docs -
The Fountain 120 Malden Road New Malden KT3 6DD
Non Material Amendment to Planning Permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) to provide an automatic opening vent (AOV) into the eastern roof elevation of Block C.
Withdrawn Amendments New dwelling Extension 8 docs -
Land Opposite 4 Kingston Road New Malden KT3 3LR
Installation of proposed telecommunications Phase 8 Monopole complete with wrapround cabinets at base and associated ancillary works
Decided Telecoms 5 docs -
160 High Street New Malden KT3 4ES
73% historically approved · decision due ~14 Sep
Installation of extraction canopy and associated ductwork for a charcoal-fired grill, including external ducting and flue.
Decided Full applications
Other amendment applications
In Kingston upon Thames
-
26/01832/NMA Granted
93A Mount Road Chessington KT9 1JH
Application for a Non-Material Amendment to Planning Permission 23/03450/FUL (Erection of two storey side extension to create a new dwelling, erection of a single storey rear extension to the existing dwelling.) to allow relocation of the main entrance door together with minor associated alterations to the ground-floor entrance layout.
-
26/01957/NMA Awaiting decision
7 Moorfield Road Chessington KT9 1AU
Application for a Non Material Amendment to planning permission 26/01125/HOUF (Erection of a single storey rear extension, hip to gable roof extension with 2 no. rear dormers, installation of 5 no. front rooflights. Addition of open front entrance porch.) to merge two rear dormers.
-
26/01755/NMA Granted
203 Tudor Drive Kingston Upon Thames KT2 5NU
Application for a Non-Material Amendment to Planning Permission ref: 26/00582/HOU (Erection of single storey rear extension). Amendment to change the approved roof lantern to 2nos. rooflights.
-
26/01940/NMA Awaiting decision
Swan House 51 High Street Kingston Upon Thames KT1 1LQ
Application for a Non-Material Amendment to Planning Permission 23/01865/FUL (Demolition of existing buildings and redevelopment to erect a part three, part four, part five storey building with a lower ground level to provide 758sqm of commercial floor space (Use Class E), 34 residential units (Class C3) and associated and associated communal and open space in addition to associated highways works and landscaping.) to amend the drawings approved under Condition 1 (Approved Plans) to reflect a revised entrance arrangement to Unit 1 and the consequential amendments required to maintain the approved design.
-
26/01651/NMA Granted
13 Pine Walk Surbiton KT5 8NJ
Application for a Non-Material Amendment to Planning Permission ref: 25/00694/HOU (Conversion of an existing garage into habitable space, erection of two storey side, single storey rear and first floor rear extension. Alteration to the roof, enlargement of existing rear dormer to accommodate a habitable room in the loft with installation of 1no front and 1no side rooflight.). Amendment to: 1. Not implement the approved two-storey side extension; 2. Allow minor amendments to the position, size and arrangement of windows and doors; 3. Change the approved external wall finish to a fully rendered finish; and 4. Allow minor refurbishment of the existing front porch.