Planning application
Coombe Boys School College Gardens New Malden KT3 6NU
Works: Demolition Trees
Relates to 26/00923/FUL, 24/01386/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application for a Non-Material Amendment to Planning Permission ref: 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.). Amendment to remove Silver Birch tree.
As published by the council, reference 26/02251/NMA
Application record
- Reference
- 26/02251/NMA
- Category
- Amendments
- Status
- Pending Consideration
- Received
- 22 Oct 2026
- Validated
- 22 Oct 2026
- Postcode
- KT3 6NU
Site history
Applications at this address on the Kingston upon Thames register
This site has had 2 applications since 2026.
-
26/01929/CLC Awaiting decision
Coombe Boys School College Gardens New Malden KT3 6NU
Details required for Condition 10 (Photo and Installation of Sustainable Drainage Scheme) of planning permission 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.)
Timeline
Dates from the published record
-
22 Oct 2026
Received by Kingston upon Thames
-
26 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Kingston upon Thames took a median of 63 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
26/00923/FUL Granted
Coombe Boys School College Gardens New Malden KT3 6NT
Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.
-
24/01386/FUL Granted
Coombe Boys School College Gardens New Malden KT3 6NT
Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.
What happens while it is decided
This application is with Kingston upon Thames for determination, against a statutory target of eight weeks. Over the last year Kingston upon Thames decided amendment applications in a median of 31 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Coombe Boys School College Gardens New Malden KT3 6NU
80% historically approved · decision due ~30 Nov
Details required for Condition 10 (Photo and Installation of Sustainable Drainage Scheme) of planning permission 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.)
Awaiting decision Demolition -
Coombe Boys School College Gardens New Malden KT3 6NT
Application for a Non-Material Amendment for proposed amendments to the wording of conditions 10 and 25 of Planning Permission ref: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout)
Withdrawn Amendments Demolition 5 docs -
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Conditions 31 and 32 (Community Use Agreement) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
Granted Demolition 2 docs -
Coombe Boys School College Gardens New Malden KT3 6NT
Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.
Granted Full applications Demolition 24 docs -
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 31 (community use agreement) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
Refused Conditions Demolition 2 docs -
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 24 (flood risk) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
Refused Conditions Demolition 2 docs
Other amendment applications
In Kingston upon Thames
-
26/02252/NMA Awaiting decision
61 Malden Way New Malden KT3 6DX
Application for a Non-Material Amendment to Planning Permission ref: 22/00495/FUL (Conversion of single family dwelling into 2no. self-contained flats (1 x three-bedroom and 1 x three-bedroom duplex) with 1no. parking space at rear Extension of existing side dormer with installation of 2no side rooflights.). Amendment to internal floor plans to reflect the as-built internal layout of both units.
-
26/02248/NMA Awaiting decision
70 - 72 London Road Kingston Upon Thames KT2 6PY
Application for a Non-Material Amendment to Planning Permission ref: 24/03199/FUL (Erection of two storey (first and second floor) rear extension within courtyard, redesign of central flat roof to include green roof garden, roof alteration to create sloping section, recladding of external walls and fenestration alterations around the internal roof garden space, recladding of the external walls, fenestration alterations and curtain wall replacement to north and north-west corner, and erection of single storey extension to north-east corner. Installation of photovoltaic panels on flat roof of north section.). Amendment to add ventilation grilles on the north and west elevation at ground floor level.
-
26/02174/NMA Awaiting decision
56 The Bittoms Kingston Upon Thames KT1 2AP
Application for a Non-Material Amendment to planning permission 26/01116/HOU (Erection of single storey part side infill extension with front/side cycle storage area and minor alterations to front retaining wall.). Amendment to ground floor side elevation to remove side storage door and infill with brickwork to incorporate the area into the kitchen.
-
26/01957/NMA Granted
7 Moorfield Road Chessington KT9 1AU
Application for a Non Material Amendment to planning permission 26/01125/HOUF (Erection of a single storey rear extension, hip to gable roof extension with 2 no. rear dormers, installation of 5 no. front rooflights. Addition of open front entrance porch.) to merge two rear dormers and minor rear fenestration changes.
-
26/02153/NMA Awaiting decision
Swan House 51 High Street Kingston Upon Thames KT1 1LQ
Application for a Non-Material Amendment to Planning Permission 23/01865/FUL (Demolition of existing buildings and redevelopment to erect a part three, part four, part five storey building with a lower ground level to provide 758sqm of commercial floor space (Use Class E), 34 residential units (Class C3) and associated and associated communal and open space in addition to associated highways works and landscaping.) to amend the drawings approved under Condition 1 (Approved Plans) to reflect a revised stair core and roof arrangement