Coombe Boys School College Gardens New Malden KT3 6NU

Awaiting decision Kingston upon Thames 26/02251/NMA Amendments

Works: Demolition Trees

Relates to 26/00923/FUL, 24/01386/FUL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application for a Non-Material Amendment to Planning Permission ref: 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.). Amendment to remove Silver Birch tree.

As published by the council, reference 26/02251/NMA

Application record

Reference
26/02251/NMA
Category
Amendments
Status
Pending Consideration
Received
22 Oct 2026
Validated
22 Oct 2026
Postcode
KT3 6NU

Site history

Applications at this address on the Kingston upon Thames register

This site has had 2 applications since 2026.

  • 26/01929/CLC Awaiting decision

    Coombe Boys School College Gardens New Malden KT3 6NU

    Details required for Condition 10 (Photo and Installation of Sustainable Drainage Scheme) of planning permission 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.)

    Submitted 4 Sep 2026

Timeline

Dates from the published record

  1. 22 Oct 2026

    Received by Kingston upon Thames

  2. 26 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Kingston upon Thames took a median of 63 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/00923/FUL Granted

    Coombe Boys School College Gardens New Malden KT3 6NT

    Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.

    Decided 29 Jul 2026 Full applications
  • 24/01386/FUL Granted

    Coombe Boys School College Gardens New Malden KT3 6NT

    Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.

    Decided 3 Dec 2024 Full applications

What happens while it is decided

This application is with Kingston upon Thames for determination, against a statutory target of eight weeks. Over the last year Kingston upon Thames decided amendment applications in a median of 31 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Coombe Boys School College Gardens New Malden KT3 6NU

    26/01929/CLC Submitted 4 Sep 2026 50 yards away

    80% historically approved · decision due ~30 Nov

    Details required for Condition 10 (Photo and Installation of Sustainable Drainage Scheme) of planning permission 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.)

    Awaiting decision Demolition
  • Coombe Boys School College Gardens New Malden KT3 6NT

    26/00484/NMA Submitted 6 Mar 2026 50 yards away

    Application for a Non-Material Amendment for proposed amendments to the wording of conditions 10 and 25 of Planning Permission ref: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout)

    Withdrawn Amendments Demolition 5 docs
  • Coombe Boys School College Gardens New Malden KT3 6NT

    26/01040/CLC Submitted 15 May 2026 50 yards away

    Details required for Conditions 31 and 32 (Community Use Agreement) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)

    Granted Demolition 2 docs
  • Coombe Boys School College Gardens New Malden KT3 6NT

    26/00923/FUL Submitted 29 Apr 2026 50 yards away

    Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.

    Granted Full applications Demolition 24 docs
  • Coombe Boys School College Gardens New Malden KT3 6NT

    25/03142/CLC Submitted 5 Dec 2025 100 yards away

    Details required for Condition 31 (community use agreement) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)

    Refused Conditions Demolition 2 docs
  • Coombe Boys School College Gardens New Malden KT3 6NT

    25/03140/CLC Submitted 5 Dec 2025 100 yards away

    Details required for Condition 24 (flood risk) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)

    Refused Conditions Demolition 2 docs

In Kingston upon Thames

  • 26/02252/NMA Awaiting decision

    61 Malden Way New Malden KT3 6DX

    Application for a Non-Material Amendment to Planning Permission ref: 22/00495/FUL (Conversion of single family dwelling into 2no. self-contained flats (1 x three-bedroom and 1 x three-bedroom duplex) with 1no. parking space at rear Extension of existing side dormer with installation of 2no side rooflights.). Amendment to internal floor plans to reflect the as-built internal layout of both units.

    22 Oct 2026 Amendments
  • 26/02248/NMA Awaiting decision

    70 - 72 London Road Kingston Upon Thames KT2 6PY

    Application for a Non-Material Amendment to Planning Permission ref: 24/03199/FUL (Erection of two storey (first and second floor) rear extension within courtyard, redesign of central flat roof to include green roof garden, roof alteration to create sloping section, recladding of external walls and fenestration alterations around the internal roof garden space, recladding of the external walls, fenestration alterations and curtain wall replacement to north and north-west corner, and erection of single storey extension to north-east corner. Installation of photovoltaic panels on flat roof of north section.). Amendment to add ventilation grilles on the north and west elevation at ground floor level.

    Received 21 Oct, published by the council 22 Oct 2026 Amendments
  • 26/02174/NMA Awaiting decision

    56 The Bittoms Kingston Upon Thames KT1 2AP

    Application for a Non-Material Amendment to planning permission 26/01116/HOU (Erection of single storey part side infill extension with front/side cycle storage area and minor alterations to front retaining wall.). Amendment to ground floor side elevation to remove side storage door and infill with brickwork to incorporate the area into the kitchen.

    12 Oct 2026 Amendments
  • 26/01957/NMA Granted

    7 Moorfield Road Chessington KT9 1AU

    Application for a Non Material Amendment to planning permission 26/01125/HOUF (Erection of a single storey rear extension, hip to gable roof extension with 2 no. rear dormers, installation of 5 no. front rooflights. Addition of open front entrance porch.) to merge two rear dormers and minor rear fenestration changes.

    Received 9 Sep, published by the council 14 Sep 2026 Amendments
  • 26/02153/NMA Awaiting decision

    Swan House 51 High Street Kingston Upon Thames KT1 1LQ

    Application for a Non-Material Amendment to Planning Permission 23/01865/FUL (Demolition of existing buildings and redevelopment to erect a part three, part four, part five storey building with a lower ground level to provide 758sqm of commercial floor space (Use Class E), 34 residential units (Class C3) and associated and associated communal and open space in addition to associated highways works and landscaping.) to amend the drawings approved under Condition 1 (Approved Plans) to reflect a revised stair core and roof arrangement

    Received 8 Oct, published by the council 9 Oct 2026 Amendments