The Fountain 120 Malden Road New Malden KT3 6DD

Withdrawn Kingston upon Thames 22/01801/NMA Non-Material Amendment

Works: New dwelling Extension

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Non Material Amendment to Planning Permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) to provide an automatic opening vent (AOV) into the eastern roof elevation of Block C.

As published by the council, reference 22/01801/NMA

Application record

Reference
22/01801/NMA
Type
Non-Material Amendment
Status
Withdrawn
Decision
Application Withdrawn
Received
31 May 2022
Validated
7 Jun 2022
Decided
6 Jul 2022
Ward
New Malden Village
Parish
New And Old Malden
Decision by
Delegated Decision
Postcode
KT3 6DD

Site history

Applications at this address on the Kingston upon Thames register

This site has had 5 applications since 2021: 1 approved, 1 refused.

  • 23/02115/ADV Withdrawn

    The Fountain 120 Malden Road New Malden KT3 6DD

    Display of internally illuminated fascia signage to front and side and 1no. projecting sign

    Decided 4 Oct 2023 Advertising
  • 23/02039/FUL Withdrawn

    The Fountain 120 Malden Road New Malden KT3 6DD

    Change of use of ground floor unit from retail to martial arts gym (Use Class E(d)) and installation of condenser units.

    Decided 4 Oct 2023 Full applications
  • 21/03541/NMA Refused

    The Fountain 120 Malden Road New Malden KT3 6DD

    Non-Material Amendment to Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Amendment to entrance door and glazing arrangement to Block B.

    Decided 14 Dec 2021 Amendments
  • 21/02651/CLC Granted

    The Fountain 120 Malden Road New Malden KT3 6DD

    Details required for condition 11 (Secured by Design) of planninng permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)

    Decided 22 Sep 2021 Conditions

Timeline

Dates from the published record

  1. 31 May 2022

    Received by Kingston upon Thames

  2. 7 Jun 2022

    Validated

    Checked as complete and ready for consideration.

  3. 6 Jul 2022

    Decision issued: Application Withdrawn

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Kingston upon Thames decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • The Fountain 120 Malden Road New Malden KT3 6DD

    23/02115/ADV Submitted 2 Aug 2023 3m away

    Display of internally illuminated fascia signage to front and side and 1no. projecting sign

    Withdrawn Advertising 7 docs
  • The Fountain 120 Malden Road New Malden KT3 6DD

    23/02039/FUL Submitted 26 Jul 2023 3m away

    Change of use of ground floor unit from retail to martial arts gym (Use Class E(d)) and installation of condenser units.

    Withdrawn Full applications 13 docs
  • The Fountain 120 Malden Road New Malden KT3 6DD

    21/02651/CLC Submitted 17 Aug 2021 8m away

    Details required for condition 11 (Secured by Design) of planninng permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)

    Granted Conditions New dwelling Extension 5 docs
  • The Fountain 120 Malden Road New Malden KT3 6DD

    21/03541/NMA Submitted 5 Nov 2021 23m away

    Non-Material Amendment to Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Amendment to entrance door and glazing arrangement to Block B.

    Refused Amendments New dwelling Extension +1 8 docs
  • Fountain House 10 Burlington Road New Malden KT3 4NY

    25/03270/FUL Submitted 19 Dec 2025 62m away

    Erection of first floor side extension with installation of photovoltaic panels to extension roof.

    Refused Full applications Extension 11 docs
  • 160 High Street New Malden KT3 4ES

    26/01374/FUL Submitted 25 Jun 2026 67m away

    72% historically approved · decision due ~14 Sep

    Installation of extraction canopy and associated ductwork for a charcoal-fired grill, including external ducting and flue.

    Awaiting decision Full applications

In Kingston upon Thames

  • 26/01940/NMA Awaiting decision

    Swan House 51 High Street Kingston Upon Thames KT1 1LQ

    Application for a Non-Material Amendment to Planning Permission 23/01865/FUL (Demolition of existing buildings and redevelopment to erect a part three, part four, part five storey building with a lower ground level to provide 758sqm of commercial floor space (Use Class E), 34 residential units (Class C3) and associated and associated communal and open space in addition to associated highways works and landscaping.) to amend the drawings approved under Condition 1 (Approved Plans) to reflect a revised entrance arrangement to Unit 1 and the consequential amendments required to maintain the approved design.

    7 Sep 2026 Amendments
  • 26/01909/NMA Awaiting decision

    38 Clarence Street Kingston Upon Thames KT1 1NR

    Application for a Non-Material Amendment to Planning Permission ref: 24/01215/FUL (Erection of single storey rear, second floor rear extension. Addition of third floor to create 4 no. self-contained residential flats (Use Class C3) including provision of new residential access, cycle parking and associated works. Installation of PV solar panels.). Amendment to the Description of Development.

    2 Sep 2026 Amendments
  • 26/01907/NMA Awaiting decision

    Former SCC HQ County Hall Penrhyn Road Kingston Upon Thames KT1 2EA

    Application for a Non Material Amendment to planning permission 25/02512/FUL to allow minor alterations to internal layouts, residential core arrangement, elevations of Block A and B, roof detailing of Block B, landscaping and unit mix.

    1 Sep 2026 Amendments
  • 26/01871/NMA Awaiting decision

    79 Lime Grove New Malden KT3 3TR

    Application for a Non-Material Amendment to Planning Permission 25/01412/HOU (Conversion of an existing garage into a habitable space, erection of a single storey rear and front canopy extension. Installation of 1 no front rooflight and solar panels.) to change the solar panels layout.

    27 Aug 2026 Amendments
  • 26/01850/NMA Decided

    322-324 Hook Rise North Tolworth KT6 7LN

    Application for a Non-Material Amendment to Planning Permission ref: 24/00979/FUL (Erection of 3 additional floors with accommodation in mansard roof above 322-324 Hook Rise North to form 7 residential units and two ground-floor retail units with associated refuse/recycling provision and cycle storage). Amendment to ground floor layout and front elevation at ground floor level only.

    25 Aug 2026 Amendments