Planning application
The Fountain 120 Malden Road New Malden KT3 6DD
Works: New dwelling Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details required for condition 11 (Secured by Design) of planninng permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)
As published by the council, reference 21/02651/CLC
Application record
- Reference
- 21/02651/CLC
- Type
- Details Reserved by Condition
- Status
- Granted
- Decision
- Application Granted
- Received
- 17 Aug 2021
- Validated
- 17 Aug 2021
- Decided
- 22 Sep 2021
- Ward
- St James - OLD
- Parish
- Malden And Coombe - OLD
- Decision by
- Delegated Decision
- Postcode
- KT3 6DD
Site history
Applications at this address on the Kingston upon Thames register
This site has had 5 applications since 2021: 1 approved, 1 refused.
-
23/02115/ADV Withdrawn
The Fountain 120 Malden Road New Malden KT3 6DD
Display of internally illuminated fascia signage to front and side and 1no. projecting sign
-
23/02039/FUL Withdrawn
The Fountain 120 Malden Road New Malden KT3 6DD
Change of use of ground floor unit from retail to martial arts gym (Use Class E(d)) and installation of condenser units.
-
22/01801/NMA Withdrawn
The Fountain 120 Malden Road New Malden KT3 6DD
Non Material Amendment to Planning Permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) to provide an automatic opening vent (AOV) into the eastern roof elevation of Block C.
-
21/03541/NMA Refused
The Fountain 120 Malden Road New Malden KT3 6DD
Non-Material Amendment to Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Amendment to entrance door and glazing arrangement to Block B.
Timeline
Dates from the published record
-
17 Aug 2021
Received by Kingston upon Thames
-
22 Sep 2021
Decision issued: Application Granted
-
26 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Kingston upon Thames granted permission on 22 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
The Fountain 120 Malden Road New Malden KT3 6DD
Non Material Amendment to Planning Permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) to provide an automatic opening vent (AOV) into the eastern roof elevation of Block C.
Withdrawn Amendments New dwelling Extension 8 docs -
The Fountain 120 Malden Road New Malden KT3 6DD
Display of internally illuminated fascia signage to front and side and 1no. projecting sign
Withdrawn Advertising 7 docs -
The Fountain 120 Malden Road New Malden KT3 6DD
Change of use of ground floor unit from retail to martial arts gym (Use Class E(d)) and installation of condenser units.
Withdrawn Full applications 13 docs -
The Fountain 120 Malden Road New Malden KT3 6DD
Non-Material Amendment to Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Amendment to entrance door and glazing arrangement to Block B.
Refused Amendments New dwelling Extension +1 8 docs -
160 High Street New Malden KT3 4ES
73% historically approved · decision due ~14 Sep
Installation of extraction canopy and associated ductwork for a charcoal-fired grill, including external ducting and flue.
Decided Full applications -
Fountain House 10 Burlington Road New Malden KT3 4NY
Erection of first floor side extension with installation of photovoltaic panels to extension roof.
Refused Full applications Extension 11 docs
Other condition discharge and variation applications
In Kingston upon Thames
-
26/00953/CLC Granted
Orchard House West Road Kingston Upon Thames KT2 7HA
Details required for Conditions 3 (Facing Materials), 7 (Landscape and Planting Plan), 8 (Fire Safety Strategy), 9 (Waste and Recycling Facilities), 10 (Cycle Parking Facilities), 12 (Construction Management Plan), 13 (Car Parking) and 14 (Nature Conservation Scheme) of planning permission 24/02075/FUL (Erection of two storey new house with accommodation in roof including landscaping, and erection of garage. Installation of solar panels (amendments include omission of a balcony and amendments to windows to make obscure- glazed and fixed).)
-
25/02403/CLC Granted
County Hall Development Site Penrhyn Road Kingston Upon Thames KT1 2EA
Details required for Condition 41 (Overheating Controls) of planning permission 25/02512/FUL (Variation of Condition Application under Section 73 of the Town and Country Planning Act 1990 to carry out development following amendments to Condition 1 (Approved Plans), Condition 12 (Evidence), Condition 28 (Energy Strategy) and Condition 33 (Biodiversity Method Statement) of planning permission 21/03939/FUL (Refurbishment, restoration and extension of the County Hall (Grade II*) to provide flexible commercial use (class E) and residential use (class C3), demolition of The Canteen Building and The Computer Wing Building, erection of replacement buildings of between 2 and 6 storeys for residential use (class C3), alterations to the existing boundary including Nos. 5 & 7 Milner Road, new means of access, associated public realm and landscaping, highway works, car and cycle parking and all ancillary and associated work.) to allow the removal of basement below Block A2 to reflect an updated energy strategy and waste management strategy, amendment at ground level to cycle parking, drainage, landscaping and refuse
-
25/03093/CLC Granted
Former SCC HQ County Hall Penrhyn Road Kingston Upon Thames KT1 2EA
Details required for Condition 12b (Details Doors and Windows) and 13a (Details Doors and Windows) of planning permission 21/03970/LBC
-
24/01989/CLC Granted
9 Oak Hill Grove Surbiton KT6 6DS
Details required for Conditions 11 (Biodiversity enhancement and mitigation scheme), 13 (Landscaping scheme), 14 (waste and recycling facilities) and 15 (Cycle Parking) of planning permission 21/01585/FUL (Erection of new 3 storey building with basement containing 7no. self-contained residential units with ancillary cycle store and refuse/recycling store (following demolition of existing dwellinghouse))
-
26/01733/CLC Awaiting decision
Cambridge Road Estate Redevelopment Site Cambridge Road Kingston Upon Thames
Details required for Condition 76 (Detail Drawings) of planning permission 20/02942/FUL