Planning application
Parc Cybi, Caergybi / Holyhead
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Barn sgrinio ar gyfer cais llawn ar gyfer adeiladu Cyfleuster Ffiniau Mewndirol (IBF) ar dir yn / Screening opinion for full planning application for the construction of an Inland Border Facility (IBF) on land at
As published by the council, reference SCR/2021/79
Application record
- Reference
- SCR/2021/79
- Type
- Outline
- Status
- Permitted
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 22 Oct 2021
- Validated
- 22 Oct 2021
- Decided
- 3 Dec 2021
- Ward
- Ynys Gybi
- Parish
- Holyhead
- Decision by
- Delegated
Timeline
Dates from the published record
-
22 Oct 2021
Received by Isle of Anglesey
-
3 Dec 2021
Decision issued: Dim Angen AEA / EIA Not Required
-
19 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hen Safle Roadking, Stop Tryciau, Parc Cybi, Caergybi / Former Roadking Truckstop, Parc Cybi, Holyhead,
Cais i ryddhau amod (05) (tirwedd) a (08) (arwyddion) o ganiatâd cynllunio FPL/2021/337 (cais llawn ar gyfer adeiladu Cyfleuster Ffiniau Mewndirol (IBF) yn / Application to discharge condition (05) (landscaping) and (08) (signage) of planning permission FPL/2021/337 (full application for the construction of an Inland Border Facility (IBF) at
Granted Advertising 9 docs -
Cyfleuster Rheoli Ffiniau Mewndirol HMRC / HMRC Inland Border Facility, Parc Cybi, Caergybi / Holyhead
Barn sgrinio ar gyfer codi is-orsaf, ystafell switsys a lle i gadw generadur wrth gefn yn / Screening opinion for the erection of a sub-station, switchroom and standby generator compound at
Decided Outline 5 docs -
Cyfleuster Rheoli Ffiniau Mewndirol HMRC / HMRC Inland Border Facility, Parc Cybi, Caergybi / Holyhead
Cais llawn ar gyfer codi is-orsaf, ystafell switsys a lle i gadw generadur wrth gefn yn / Full application for the erection of a sub-station, switchroom and standby generator compound at
Granted Full applications 7 docs -
Hen Safle Roadking, Stop Tryciau, Parc Cybi, Caergybi / Former Roadking Truckstop, Parc Cybi, Holyhead.
Cais i ryddhau amod (16) (asesad risg) of planning permission FPL/2021/337 (cais llawn ar gyfer adeiladu Cyfluster Ffiniau Mewndirol (IBF) yn / Application to discharge condition (16) (risk assessment) of planning permission FPL/2021/337 (full application for the construction of an Inland Border Facility (IBF) at
Granted Conditions 10 docs -
Hen Safle Roadking, Stop Tryciau, Parc Cybi, Caergybi / Former Roadking Truckstop, Parc Cybi, Holyhead
Cais i ryddhau amod (02) (Cynllun Rheoli Traffig Adeiladu), (03)(Cynllun Rheoli Amgylcheddol Adeiladu), (07)(Manylion/Samplau o defnyddiau), (09)(Cynllun Cyflogaeth Lleol), (10)(Sgim Gadwyn Gyflenwi Lleol) o ganiatâd cynllunio FPL/2021/337: Cais llawn ar gyfer adeiladu Cyfleuster Ffiniau Mewndirol (IBF) yn / Application to discharge conditions (02) (Construction Traffic Management Plan), (03)(Construction Environmental Management Plan), (07)(Details/Samples of Materials), (09)(Local Employment Scheme), (10)(Local Supply Chain Scheme) of planning permission FPL/2021/337: Full application for the construction of an Inland Border Facility (IBF) at
Granted Conditions 10 docs -
Hen Safle Roadking, Stop Tryciau, Parc Cybi, Caergybi / Former Roadking Truckstop, Parc Cybi, Holyhead,
Cais llawn ar gyfer adeiladu Cyfleuster Ffiniau Mewndirol (IBF) yn / Full application for the construction of an Inland Border Facility (IBF) at
Granted Full applications 70 docs
Other outline applications
In Isle of Anglesey
-
GWY/2026/2 Decided
Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP
Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.
-
OP/2025/1 Granted
Llanfawr Road, Caergybi / Holyhead.
Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Granted
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at