Planning application
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
As published by the council, reference SCR/2026/21
Application record
- Reference
- SCR/2026/21
- Type
- Screening Opinion
- Status
- Closed
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 1 May 2026
- Validated
- 1 May 2026
- Decided
- 4 Jun 2026
- Ward
- Twrcelyn
- Parish
- Llanbadrig
- Decision by
- Dirprwyedig / Delegated
Timeline
Dates from the published record
-
1 May 2026
Received by Isle of Anglesey
-
4 Jun 2026
Decision issued: Dim Angen AEA / EIA Not Required
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
Tir yn / Land at Carrog Ganol, Rhosgoch,
Cais llawn i osod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Full application for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
Granted Full applications 50 docs -
System Storio Ynni Batri / Battery Energy Storage System, Rhosgoch
Barn sgrinio ar gyfer yr is-orsaf barhaol a'r cebl tanddaearol er mwyn gysylltu i'r System Storio Ynni Batri a ganiatawyd yn flaenorol yn / Screening opinion for the permanent substation and underground cable to allow the connection of a previously approved Battery Energy Storage System at
Decided Outline 2 docs -
Tir yn / Land at Carrog Ganol, Rhosgoch,
Gosod system storio ynni batri, ynghyd ag is-orsaf, gorsafoedd newidyddion, mynedfeydd i’r safle, traciau mynediad mewnol, mesurau diogelwch, giatiau mynediad, isadeiledd ategol arall a gwelliannau tirlunio a bioamrywiaeth ar / Installation of battery energy storage system, together with substation, transformer stations, site accesses, internal access tracks, security measures, access gates, other ancillary infrastructure and landscaping and biodiversity enhancements on
Decided 25 docs -
Land at Carrog Ganol, Rhosgoch
Barn sgrinio ar gyfer system storio ynni batri ar dir amaethyddol yn / Screening opinion for a battery energy storage system on an area of agricultural land at
Decided Outline 3 docs
Other outline applications
In Isle of Anglesey
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Granted
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at
-
SCR/2026/20 Decided
Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge
Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at
-
OP/2025/9 Granted
Craig Owen, Llanbedrgoch
Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to
-
SCR/2026/17 Decided
Llanerchymedd Wastewater Treatment Works.
Barn Sgrinio ar gyfer gosod gwaith prosesu newydd a seilwaith cysylltiedig ar dir ger / Screening Opinion for the installation of a new processing plant and associated infrastructure on land adjacent to