Skip to content
PlanIndex Get alerts
Menu

Planning application

Cyfleuster Rheoli Ffiniau Mewndirol HMRC / HMRC Inland Border Facility, Parc Cybi, Caergybi / Holyhead

Granted Isle of Anglesey FPL/2023/166 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais llawn ar gyfer codi is-orsaf, ystafell switsys a lle i gadw generadur wrth gefn yn / Full application for the erection of a sub-station, switchroom and standby generator compound at

As published by the council, reference FPL/2023/166

Application record

Reference
FPL/2023/166
Type
Full
Status
Permitted
Decision
Caniatáu / Permit
Received
27 Jun 2023
Validated
30 Jun 2023
Decided
21 Aug 2023
Ward
Ynys Gybi
Parish
Holyhead
Decision by
Delegated

Timeline

Dates from the published record

  1. 27 Jun 2023

    Received by Isle of Anglesey

  2. 30 Jun 2023

    Validated

    Checked as complete and ready for consideration.

  3. 21 Aug 2023

    Decision issued: Caniatáu / Permit

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Hen Safle Roadking, Stop Tryciau, Parc Cybi, Caergybi / Former Roadking Truckstop, Parc Cybi, Holyhead,

    DIS/2022/63 Submitted 6 Sep 2022 0m away

    Cais i ryddhau amod (05) (tirwedd) a (08) (arwyddion) o ganiatâd cynllunio FPL/2021/337 (cais llawn ar gyfer adeiladu Cyfleuster Ffiniau Mewndirol (IBF) yn / Application to discharge condition (05) (landscaping) and (08) (signage) of planning permission FPL/2021/337 (full application for the construction of an Inland Border Facility (IBF) at

    Decided Advertising 9 docs
  • Cyfleuster Rheoli Ffiniau Mewndirol HMRC / HMRC Inland Border Facility, Parc Cybi, Caergybi / Holyhead

    SCR/2023/35 Submitted 3 Jul 2023 0m away

    Barn sgrinio ar gyfer codi is-orsaf, ystafell switsys a lle i gadw generadur wrth gefn yn / Screening opinion for the erection of a sub-station, switchroom and standby generator compound at

    Decided Outline 5 docs
  • Hen Safle Roadking, Stop Tryciau, Parc Cybi, Caergybi / Former Roadking Truckstop, Parc Cybi, Holyhead.

    DIS/2023/17 Submitted 9 Mar 2023 0m away

    Cais i ryddhau amod (16) (asesad risg) of planning permission FPL/2021/337 (cais llawn ar gyfer adeiladu Cyfluster Ffiniau Mewndirol (IBF) yn / Application to discharge condition (16) (risk assessment) of planning permission FPL/2021/337 (full application for the construction of an Inland Border Facility (IBF) at

    Decided Conditions 10 docs
  • Hen Safle Roadking, Stop Tryciau, Parc Cybi, Caergybi / Former Roadking Truckstop, Parc Cybi, Holyhead

    DIS/2022/36 Submitted 23 May 2022 0m away

    Cais i ryddhau amod (02) (Cynllun Rheoli Traffig Adeiladu), (03)(Cynllun Rheoli Amgylcheddol Adeiladu), (07)(Manylion/Samplau o defnyddiau), (09)(Cynllun Cyflogaeth Lleol), (10)(Sgim Gadwyn Gyflenwi Lleol) o ganiatâd cynllunio FPL/2021/337: Cais llawn ar gyfer adeiladu Cyfleuster Ffiniau Mewndirol (IBF) yn / Application to discharge conditions (02) (Construction Traffic Management Plan), (03)(Construction Environmental Management Plan), (07)(Details/Samples of Materials), (09)(Local Employment Scheme), (10)(Local Supply Chain Scheme) of planning permission FPL/2021/337: Full application for the construction of an Inland Border Facility (IBF) at

    Decided Conditions 10 docs
  • Hen Safle Roadking, Stop Tryciau, Parc Cybi, Caergybi / Former Roadking Truckstop, Parc Cybi, Holyhead,

    FPL/2021/337 Submitted 26 Nov 2021 0m away

    Cais llawn ar gyfer adeiladu Cyfleuster Ffiniau Mewndirol (IBF) yn / Full application for the construction of an Inland Border Facility (IBF) at

    Granted Full applications 70 docs
  • Hen Safle Roadking, Stop Tryciau, Parc Cybi, Caergybi / Former Roadking, Truckstop, Parc Cybi, Holyhead.

    VAR/2022/71 Submitted 20 Oct 2022 0m away

    Cais o dan Adran 73 i ddiwygio amod (15) (arolwg cyflwr ar gyfer graddau'r ffyrdd ymuno/ymadael) o ganiatâd cynllunio rhif FPL/2021/337 (Cais llawn ar gyfer adeiladu Cyfleuster Ffiniau Mewndirol (IBF) er mwyn caniatáu cyflwyno a chymeradwyo manylion yn dilyn cychwyn gwaith datblygu yn / Application under Section 73 for the variation of condition (15) (condition survey for the extent of slip roads) of planning permission reference FPL/2021/337 (Full application for the construction of an Inland Border Facility (IBF) so as to allow the details to be submitted and approved following the commencement of development works at

    Granted Conditions 48 docs

In Isle of Anglesey

  • FPL/2026/85 Granted

    31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.

    Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at

    17 Apr 2026 Full applications
  • FPL/2026/69 Granted

    Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead

    Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at

    31 Mar 2026 Full applications
  • FPL/2026/40 Granted

    Cumbria, High Street, Rhosneigr.

    Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at

    23 Feb 2026 Full applications
  • FPL/2026/38 Granted

    Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.

    Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at

    18 Feb 2026 Full applications
  • FPL/2025/285 Granted

    Cefn Coch, Llanfechell

    Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at

    25 Nov 2025 Full applications