Planning application
The Nook, Four Mile Bridge
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Barn sgrinio ar gyfer dymchwel yr annedd presennol ynghyd a codi annedd newydd yn ei le yn / Screening opinion forr demolition of the existing dwelling together with the erection of a replacement dwelling at
As published by the council, reference SCR/2021/53
Application record
- Reference
- SCR/2021/53
- Type
- Screening Opinion
- Status
- Closed
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 3 Aug 2021
- Validated
- 3 Aug 2021
- Decided
- 5 Aug 2021
- Ward
- Ynys Gybi
- Parish
- Rhoscolyn
- Decision by
- Dirprwyedig / Delegated
Timeline
Dates from the published record
-
3 Aug 2021
Received by Isle of Anglesey
-
5 Aug 2021
Decision issued: Dim Angen AEA / EIA Not Required
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
The Nook, Pontrhydybont / Four Mile Bridge.
Cais llawn ar gyfer addasu ac ehangu ynghyd a codi uchder y to yn / Full application for alterations and extensions including raising the height of the roof at
Granted Full applications Extension 8 docs -
3 Maes Llety, Pontrhydybont/Four Mile Bridge.
Cais llawn ar gyfer gosod pwmp gwres ffynhonnell aer yn / Full application for the installation of an air source heat pump at
Granted Full applications 7 docs -
Glasfryn, Pont-Rhyd-y-Bont / Four Mile Bridge, Caergybi / Holyhead.
Cais llawn ar gyfer addasu ag ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 10 docs -
10 Ffordd Caradog, Pontrhydybont / Four Mile Bridge
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 12 docs -
Ty Mair, Pontrhydybont / Four Mile Bridge.
Cais am dystysgrif defnydd arfaethedig o’r datblygiad oherwydd bod gwaith sylweddol wedi cychwyn ar ganiatad 43C78C/VAR er mwyn diogelu’r caniatâd hwnnw yn / Application for a certificate of proposed use or development in relation to a material start having been made on permission 43C78C/VAR thus safeguarding the consent at
Decided Outline 17 docs -
Ty Mair, Pont-Rhyd-Y-Bont / Four Mile Bridge.
Cais llawn ar gyfer codi anecs yn hunan gynhalio ategol i'r annedd presenol yn / Full application for the erection of a self-contained annexe to be used ancillary to the existing dwelling at
Decided Householder 19 docsDomestic
Other outline applications
In Isle of Anglesey
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Granted
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at
-
SCR/2026/20 Decided
Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge
Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at
-
OP/2025/9 Granted
Craig Owen, Llanbedrgoch
Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to