Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Maes Llety, Pontrhydybont/Four Mile Bridge.

Granted Isle of Anglesey FPL/2023/292 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais llawn ar gyfer gosod pwmp gwres ffynhonnell aer yn / Full application for the installation of an air source heat pump at

As published by the council, reference FPL/2023/292

Application record

Reference
FPL/2023/292
Type
Full
Status
Permitted
Decision
Caniatáu / Permit
Received
9 Oct 2023
Validated
11 Oct 2023
Decided
6 Dec 2023
Ward
Ynys Gybi
Parish
Rhoscolyn
Decision by
Delegated

Timeline

Dates from the published record

  1. 9 Oct 2023

    Received by Isle of Anglesey

  2. 11 Oct 2023

    Validated

    Checked as complete and ready for consideration.

  3. 6 Dec 2023

    Decision issued: Caniatáu / Permit

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • The Nook, Pontrhydybont / Four Mile Bridge.

    HHP/2022/251 Submitted 25 Aug 2022 50m away

    Cais llawn ar gyfer addasu ac ehangu ynghyd a codi uchder y to yn / Full application for alterations and extensions including raising the height of the roof at

    Granted Full applications Extension 8 docs
  • The Nook, Four Mile Bridge

    SCR/2021/53 Submitted 3 Aug 2021 50m away

    Barn sgrinio ar gyfer dymchwel yr annedd presennol ynghyd a codi annedd newydd yn ei le yn / Screening opinion forr demolition of the existing dwelling together with the erection of a replacement dwelling at

    Decided Outline Demolition 7 docs
    Domestic
  • Glasfryn, Pont-Rhyd-y-Bont / Four Mile Bridge, Caergybi / Holyhead.

    HHP/2026/2 Submitted 5 Jan 2026 99m away

    Cais llawn ar gyfer addasu ag ehangu yn / Full application for alterations and extensions at

    Granted Full applications Extension 10 docs
  • 10 Ffordd Caradog, Pontrhydybont / Four Mile Bridge

    HHP/2026/24 Submitted 5 Feb 2026 147m away

    Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at

    Granted Full applications Extension 12 docs
  • Ty Mair, Pontrhydybont / Four Mile Bridge.

    LUP/2024/2 Submitted 18 Mar 2024 159m away

    Cais am dystysgrif defnydd arfaethedig o’r datblygiad oherwydd bod gwaith sylweddol wedi cychwyn ar ganiatad 43C78C/VAR er mwyn diogelu’r caniatâd hwnnw yn / Application for a certificate of proposed use or development in relation to a material start having been made on permission 43C78C/VAR thus safeguarding the consent at

    Decided Outline 17 docs
  • Ty Mair, Pont-Rhyd-Y-Bont / Four Mile Bridge.

    HHP/2026/56 Submitted 25 Mar 2026 159m away

    Cais llawn ar gyfer codi anecs yn hunan gynhalio ategol i'r annedd presenol yn / Full application for the erection of a self-contained annexe to be used ancillary to the existing dwelling at

    Decided Householder 19 docs
    Domestic

In Isle of Anglesey

  • FPL/2026/85 Granted

    31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.

    Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at

    17 Apr 2026 Full applications
  • FPL/2026/69 Granted

    Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead

    Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at

    31 Mar 2026 Full applications
  • FPL/2026/40 Granted

    Cumbria, High Street, Rhosneigr.

    Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at

    23 Feb 2026 Full applications
  • FPL/2026/38 Granted

    Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.

    Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at

    18 Feb 2026 Full applications
  • FPL/2025/285 Granted

    Cefn Coch, Llanfechell

    Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at

    25 Nov 2025 Full applications